{"schemaVersion":"1.1.0","subject":{"slug":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","kind":"panel","brand":"AIKO","name":"G4 Infinite Ultra","canonical_name":"AIKO G4 Infinite Ultra 690 W","model":"G4 Infinite Ultra (4th-gen ABC)","certification_model":null,"certification_identities":[],"benchmark":{"min":690,"max":690,"scored":690,"unit":"W","metric":"rated power","policy":"highest_in_series","review_status":"current","note":"The score is anchored to the highest published rating in this exact series.","range_label":"690 W","scored_label":"690 W","market":null,"series_id":"aiko-g4-infinite-ultra","series_definition":"Same model family, cell count, dimensions, construction and market certification; power-bin changes only.","scored_model":"G4 Infinite Ultra (4th-gen ABC)","evidence_scope":"exact_model","source":{"source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","source_revision":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-23","checked":"2026-08-23"},"ranges":[{"min":690,"max":690,"unit":"W","market":"global","range_label":"690 W","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","source_revision":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-23","checked":"2026-08-23"}],"supporting_metrics":[]},"score":55,"rubric_version":"2.16.0","url":"https://review.solar/products/aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si"},"envelope":{"version":"1.1.0","subject":{"type":"product","id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","identity_scope":"published_product_record","model":"G4 Infinite Ultra (4th-gen ABC)","certification_model":null,"certification_identities":[],"benchmark_series_id":"aiko-g4-infinite-ultra"},"recorded_at":null,"recorded_at_basis":null,"source_bindings":[{"source_id":"src_024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Financial strength & warranty backing"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Financial strength & warranty backing"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"benchmark_evidence","object_scopes":["exact_model"],"field_paths":["benchmark.source"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"benchmark_range_evidence","object_scopes":["product_series"],"field_paths":["benchmark.ranges.0"],"jurisdiction":"global","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell technology tier"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Contact"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Fire classification (IEC 61730)"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Module efficiency (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.PID (IEC TS 62804)"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Financial strength & warranty backing"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.End-of-life & recycling disclosure"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","role":"primary_product_source","object_scopes":["exact_product_record"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null}],"events":[{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","object_id":null,"date":"2026-08-23","event_type":"product_evidence_checked","summary":"Core scorecard evidence checked","scope":"product_record","jurisdiction":null,"source_ids":[],"event_id":"evt_294c92120c71c42afb70599b8b27e8aa56deaca7695a006820f555bed5cf83ba"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","object_id":null,"date":"2026-08-23","event_type":"market_evidence_checked","summary":"AU market evidence checked","scope":"market_overlay","jurisdiction":"AU","source_ids":["src_37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9","src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"],"event_id":"evt_116d6a9ef192b0f5952ebe7faa5e9fb4ff38aa619af858c6bc77e4a244515163"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","object_id":null,"date":"2026-08-23","event_type":"benchmark_evidence_checked","summary":"Series benchmark evidence checked","scope":"scored_benchmark","jurisdiction":null,"source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"evt_e26315c6f50e6e83e9166d1528c0a939d8a700b4a70d5ade881c97d302be2f27"}]},"change_history":{"schemaVersion":"1.0.0","baseline":{"dataset_revision":"rel_bcce8c246a65d51663134988c0ee07203ae81007281b5169834d130773e56cf0","product_count":232,"recorded_at":"2026-08-16","recorded_at_basis":"latest_record_date_in_baseline"},"current_release_id":"rel_535c3e7876133979d2316d1462e79e14f1b603ae00fca9017eb31ce577346a73","events":[{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_91f0e11a613e9f02d1eb3354e2cedffcf987c2a6bd9d2178f34cf7e339b9a6f5","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":55.7,"after":54.6,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-31","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_e5bbda0363bcde77bfc23085a15751a5ff3f312c0d9fc2e5b2ddeb9c182c29e8"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_91f0e11a613e9f02d1eb3354e2cedffcf987c2a6bd9d2178f34cf7e339b9a6f5","event_type":"field_changed","field_path":"pillars.Efficiency & Yield.score_precise","field_label":"Efficiency & Yield pillar score","before":62.7,"after":57.4,"summary":"Efficiency & Yield pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-31","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_01de4a9f0d6fd7819497106e4dfe2ae2cd50685c33571ce6a279e58af485d28d"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_changed","field_path":"pillars.Efficiency & Yield.score_precise","field_label":"Efficiency & Yield pillar score","before":65.9,"after":62.7,"summary":"Efficiency & Yield pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_f2e216057c2f3fa2215eb3e92cf81984b29de5efa6a8455d545ff35943a02caa"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":56.3,"after":55.7,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_c78172fa25517b0eba2b2423abff5dd5630b17592d3dffd00a8eab88706d4b1f"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_added","field_path":"audit_rows.Independent energy yield.evidence_status","field_label":"Independent energy yield: Evidence status","before":null,"after":"sourced","summary":"Independent energy yield: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e","src_7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904"],"event_id":"chg_b7eaeeb21f7edace583be2b693a083afdb36a9a806c7dab3f5bad579f4512167"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_added","field_path":"audit_rows.Independent energy yield.value","field_label":"Independent energy yield","before":null,"after":"Brand or series yield-tested; exact model not covered","summary":"Independent energy yield updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e","src_7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904"],"event_id":"chg_969d4ac72a52555c5c9c0e6a519a32f6f00b29afede1aa00efe42dd6e525dc09"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_added","field_path":"audit_rows.Independent energy yield.source_urls","field_label":"Independent energy yield: Evidence sources","before":null,"after":["https://aikosolar.com/au/news-aiko-claims-top-spot/","https://www.pv-magazine.com/2023/11/09/pv-magazine-test-september-2023-results/"],"summary":"Independent energy yield: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e","src_7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904"],"event_id":"chg_0425ef88e47e4f927cffb4f6e55d6fd1c83f378c767fa362e0720f467d0cb71c"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Financial strength & warranty backing.source_urls","field_label":"Financial strength & warranty backing: Evidence sources","before":[],"after":["https://aikosolar.com/en/about-us/","https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","https://big5.sse.com.cn/site/cht/www.sse.com.cn/disclosure/listedinfo/announcement/c/new/2026-04-28/600732_20260428_LWHR.pdf"],"summary":"Financial strength & warranty backing: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846","src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_e7f33a9281f4ce86ba292b74f6eb732342367b533a3cd76e3df2a46cc957d2e1"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://aikosolar.com/au/products/","https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","https://cer.gov.au/document/cec-approved-pv-modules-0"],"after":["https://aikosolar.com/au/products/","https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","https://aikosolar.com/en/contact-us/?leads=aboutus-contact","https://cer.gov.au/document/cec-approved-pv-modules-0"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9","src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"],"event_id":"chg_cc51ade9214ab8812ac11781c152cad85570dc8912e5c849fc98eb9eefc39c40"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-01 AU evidence closure 2026-08-21: Q3 2026 deliveries remain expected, with no exact production datasheet, AU catalogue listing, warranty, or CER row established.","after":"AIKO Infinite Ultra launch, company record, listed-entity filing and PVEL scope rechecked 2026-08-23; exact production warranty and certification remain unpublished.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_c18cea8231203fb309d9db45cd91e36ef195e52cd73adf5d7b346f967f267b05"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Contact.source_urls","field_label":"Contact: Evidence sources","before":[],"after":["https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/"],"summary":"Contact: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_8edcbe9242e5ea1c53845622dc964a894964ee85e3844925d258d37e43765bfb"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":59,"after":56.3,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_72f24129d538414711fa4e3b3b41a5f08c6a136810ae5d9b29c98bd160347112"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Verified reliability.value","field_label":"Verified reliability","before":"Top Performer (multi-year)","after":"Brand or series independently tested; exact model not covered","summary":"Verified reliability updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","src_707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa"],"event_id":"chg_5558c6acc99e3d1e96996e0cac8813cb211aeb499b7ed1522311dae21d548452"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Manufacturing track record.source_urls","field_label":"Manufacturing track record: Evidence sources","before":[],"after":["https://aikosolar.com/en/about-us/","https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","https://big5.sse.com.cn/site/cht/www.sse.com.cn/disclosure/listedinfo/announcement/c/new/2026-04-28/600732_20260428_LWHR.pdf"],"summary":"Manufacturing track record: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846","src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_3165a9b1003a4455cfc7b006724448b7886666d131dd496c2c05ea6ef4cc66bd"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.source","field_label":"Source","before":{"checked":"2026-08-21","source_revision":"Infinite Ultra launch of 23 June 2026, rechecked 21 August 2026","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/"},"after":{"checked":"2026-08-23","source_revision":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-23","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/"},"summary":"Source updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_2b0321f71a09db8caec94e995f9c46a036539d1b94e5b1da7787d95ae4696886"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Verified reliability.source_urls","field_label":"Verified reliability: Evidence sources","before":[],"after":["https://aikosolar.com/en/about-us/","https://www.scorecard.pvel.com/"],"summary":"Verified reliability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","src_707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa"],"event_id":"chg_1d87fb79be41880e81d3e5c7978037a9e74fb83b7c10f9c42fb668bdd89a6755"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.support_note","field_label":"AU Support Note","before":"AIKO publishes a 690 W, 25.6% launch claim and expected Q3 2026 deliveries. The exact product remains absent from AIKO's Australian catalogue and the current CER module export, so production availability, certification and warranty remain unproven.","after":"AIKO publishes a 690 W, 25.6% pre-commercial launch and expected Q3 2026 deliveries. No exact production datasheet, Australian catalogue entry, warranty or CER row was established, so the AU status remains not reviewed.","summary":"AU Support Note updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9","src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"],"event_id":"chg_1ac9001064849f050d35a62f5ded788db728774032b613dee181ae1ba49dfe4e"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.ranges","field_label":"Ranges","before":[{"checked":"2026-08-21","market":"global","max":690,"min":690,"range_label":"690 W","source_revision":"Infinite Ultra launch of 23 June 2026, rechecked 21 August 2026","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","unit":"W"}],"after":[{"checked":"2026-08-23","market":"global","max":690,"min":690,"range_label":"690 W","source_revision":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-23","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","unit":"W"}],"summary":"Ranges updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_0b418f361b47fae66665bcdcae827b2f7d57dd5a2d4bb898d87b3900ccb49b70"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":57.1,"after":45.7,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_08eb8062b9944bb806c8592d41b2fb88793d4b8d2c272b091e6b2554a7712515"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_e49bb289e52b80703e57828d1e7c8ae144a786f90457f0e3d36fb6d22abe70e7","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-01","after":"AIKO Infinite Ultra launch of 23 June 2026, rechecked 2026-08-01 AU evidence closure 2026-08-21: Q3 2026 deliveries remain expected, with no exact production datasheet, AU catalogue listing, warranty, or CER row established.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-21","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_f9f00a2c02656ab31e4832f7dbd80ef291b3b2724a3e0817c5bcc75d66fb067e"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_e49bb289e52b80703e57828d1e7c8ae144a786f90457f0e3d36fb6d22abe70e7","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://aikosolar.com/au/products/","https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/"],"after":["https://aikosolar.com/au/products/","https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","https://cer.gov.au/document/cec-approved-pv-modules-0"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-21","recorded_at_basis":"latest_changed_record_date","source_ids":["src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"],"event_id":"chg_ee92eba28cbd555f6dbd721a9d474335531638275d8dd16bac9ec18abad87254"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_e49bb289e52b80703e57828d1e7c8ae144a786f90457f0e3d36fb6d22abe70e7","event_type":"field_changed","field_path":"benchmark.source","field_label":"Source","before":{"checked":"2026-08-01","source_revision":"Infinite Ultra launch of 23 June 2026","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/"},"after":{"checked":"2026-08-21","source_revision":"Infinite Ultra launch of 23 June 2026, rechecked 21 August 2026","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/"},"summary":"Source updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-21","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_792b19e7447253f5481ed5fba27703d5d1fad83069702dd688637998625f8971"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_e49bb289e52b80703e57828d1e7c8ae144a786f90457f0e3d36fb6d22abe70e7","event_type":"field_changed","field_path":"benchmark.ranges","field_label":"Ranges","before":[{"checked":"2026-08-01","market":"global","max":690,"min":690,"range_label":"690 W","source_revision":"Infinite Ultra launch of 23 June 2026","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","unit":"W"}],"after":[{"checked":"2026-08-21","market":"global","max":690,"min":690,"range_label":"690 W","source_revision":"Infinite Ultra launch of 23 June 2026, rechecked 21 August 2026","source_url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","unit":"W"}],"summary":"Ranges updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-21","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_6bce4f7d3b35627af45f0f840484da01e0e451445e820d48463e833a9803157f"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_e49bb289e52b80703e57828d1e7c8ae144a786f90457f0e3d36fb6d22abe70e7","event_type":"field_changed","field_path":"is_commercial","field_label":"Is Commercial","before":true,"after":false,"summary":"Is Commercial updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-21","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_35956adc6e95e691ca14cad8d22172f4621e719593ba1dfc268fdf144101b715"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_e49bb289e52b80703e57828d1e7c8ae144a786f90457f0e3d36fb6d22abe70e7","event_type":"field_changed","field_path":"market.AU.support_note","field_label":"AU Support Note","before":"AIKO publishes 690 W and 25.6% for Infinite Ultra, but no exact datasheet, certification, warranty or Australian product listing was available at recheck.","after":"AIKO publishes a 690 W, 25.6% launch claim and expected Q3 2026 deliveries. The exact product remains absent from AIKO's Australian catalogue and the current CER module export, so production availability, certification and warranty remain unproven.","summary":"AU Support Note updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-21","recorded_at_basis":"latest_changed_record_date","source_ids":["src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"],"event_id":"chg_19d11844432be124f13b8664b55b02a65291a7e954bfd6cbf300b503f36a06cc"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":60.8,"after":59,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_eae83029dd03e55dfd410a95552a02e17971e1d29b7d776ad08543c421bec3ce"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":65.1,"after":57.1,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_c84a05bca9110e72fb1900e85510ed4857a919132003d9174b6d8c4305cf2651"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":60.3,"after":60.8,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_9ff06ad32c1984132e49082c04e2a20d97b8d9d3a6be0d35ba895e0abd17df34"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"pillars.Architecture & Design.score_precise","field_label":"Architecture & Design pillar score","before":71.5,"after":74.7,"summary":"Architecture & Design pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_648e3aec0462c7675665def8eabe7b8921af0eacc884608d33aea5482fe2fb43"},{"subject_id":"aiko-solar-aiko-g4-infinite-ultra-690w-snec-2026-frontier-si","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":65.4,"after":65.1,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"],"event_id":"chg_126bf6d0e6b65168ac1d783a5b0496acb287d295606d2cf195880e50f69243bd"}],"sources":[{"id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"},"content_fingerprint":null,"retrieval":null},{"id":"src_4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e","url":"https://www.pv-magazine.com/2023/11/09/pv-magazine-test-september-2023-results/","label":"Independent energy yield","source_type":"news","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e"},"content_fingerprint":null,"retrieval":null},{"id":"src_7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904","url":"https://aikosolar.com/au/news-aiko-claims-top-spot/","label":"Independent energy yield","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904"},"content_fingerprint":null,"retrieval":null},{"id":"src_024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846","url":"https://big5.sse.com.cn/site/cht/www.sse.com.cn/disclosure/listedinfo/announcement/c/new/2026-04-28/600732_20260428_LWHR.pdf","label":"Financial strength & warranty backing","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846"},"content_fingerprint":null,"retrieval":null},{"id":"src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","url":"https://aikosolar.com/en/about-us/","label":"Verified reliability","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85"},"content_fingerprint":null,"retrieval":null},{"id":"src_37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9","url":"https://aikosolar.com/en/contact-us/?leads=aboutus-contact","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9"},"content_fingerprint":null,"retrieval":null},{"id":"src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","url":"https://aikosolar.com/au/products/","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f"},"content_fingerprint":null,"retrieval":null},{"id":"src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741","url":"https://cer.gov.au/document/cec-approved-pv-modules-0","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"},"content_fingerprint":null,"retrieval":null},{"id":"src_707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa","url":"https://www.scorecard.pvel.com/","label":"Verified reliability","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa"},"content_fingerprint":null,"retrieval":null}]},"approval_history":[],"sources":[{"id":"src_024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846","url":"https://big5.sse.com.cn/site/cht/www.sse.com.cn/disclosure/listedinfo/announcement/c/new/2026-04-28/600732_20260428_LWHR.pdf","label":"Financial strength & warranty backing","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"024756866ecdb6fec222f0a1f82739aea08e0f19db53d084045eb8d8f2a3f846"},"content_fingerprint":null,"retrieval":null},{"id":"src_37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9","url":"https://aikosolar.com/en/contact-us/?leads=aboutus-contact","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"37a76443e9156d15845f81535f4b79b76c898fa596c0493202f9bdd919fecca9"},"content_fingerprint":null,"retrieval":null},{"id":"src_4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e","url":"https://www.pv-magazine.com/2023/11/09/pv-magazine-test-september-2023-results/","label":"Independent energy yield","source_type":"news","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"4b2868f1fc4666334f981863303f2f9ec6b8abcbb108238b658e62aedd2cf55e"},"content_fingerprint":null,"retrieval":null},{"id":"src_6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85","url":"https://aikosolar.com/en/about-us/","label":"Verified reliability","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"6da9afde0e358c157347a1caca1c58de588fdbedf257c24917cfff0b01980c85"},"content_fingerprint":null,"retrieval":null},{"id":"src_707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa","url":"https://www.scorecard.pvel.com/","label":"Verified reliability","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"707087cf969abbb8f2f63379284ce16c7d43122692ea152f4fa91afc13fce3fa"},"content_fingerprint":null,"retrieval":null},{"id":"src_7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904","url":"https://aikosolar.com/au/news-aiko-claims-top-spot/","label":"Independent energy yield","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"7ec6fe62988ca2cb5b0e04a8fa9d4291e51678438b8593e06adec8aebed47904"},"content_fingerprint":null,"retrieval":null},{"id":"src_a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f","url":"https://aikosolar.com/au/products/","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a8f03442688c25831c6ab1f5a1188f09df9e7bd88f33ca2e919776629c19056f"},"content_fingerprint":null,"retrieval":null},{"id":"src_b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1","url":"https://aikosolar.com/en/aiko-bc-technology-infinite-ultra-z-series-new-launch/","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b4d92461c25e3d0b7f31864ca66b91023003b65c1482e6dde65bad1419417ee1"},"content_fingerprint":null,"retrieval":null},{"id":"src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741","url":"https://cer.gov.au/document/cec-approved-pv-modules-0","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"},"content_fingerprint":null,"retrieval":null}],"boundaries":{"rights":"An unresolved licence field is not permission to cache, redistribute, derive from, or use a source for AI.","history":"Evidence events record verification activity. Change-history events separately record accepted before-and-after publication changes.","change_history":"Events record accepted publication changes, not every evidence re-check or a claim that the product changed on that date.","change_validity":"valid_from and valid_to remain null unless a source establishes when the changed fact applied in the world.","change_scope":"Compatibility, system pairing, suitability and relative leaderboard prose are excluded.","applicability":"Market evidence does not establish stock, system compatibility, network approval, installation suitability, or approval of an earlier installation.","approval_history":"Approval history contains exact, score-neutral source-register links recorded since monitoring began. It is not a complete lifetime history."}}