{"schemaVersion":"1.1.0","subject":{"slug":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","kind":"battery","brand":"EcoFlow","name":"Ocean 2 Plus","canonical_name":"EcoFlow Ocean 2 Plus 5.02 kWh","model":"EcoFlow OCEAN 2 single-phase Plus with EF BD-5-S2; 5.02 kWh scored reference, expandable in 5.02 kWh modules","certification_model":null,"certification_identities":[],"benchmark":{"min":5.02,"max":96,"scored":5.02,"unit":"kWh","metric":"nominal battery capacity","policy":"reference_configuration","review_status":"current","note":"Capacity range describes supported configurations; the score remains anchored to the reviewed reference configuration, not the largest stack.","range_label":"5.02–96 kWh","scored_label":"5.02 kWh","market":null,"series_id":"ecoflow-ocean-2-plus","series_definition":"Same battery platform and control architecture; module or stack count may vary.","scored_model":"EcoFlow Ocean 2 Plus (single-phase hybrid inverter + 5.02 kWh nominal LFP modules, expandable to 96 kWh)","evidence_scope":"exact_configuration","source":{"source_url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","source_revision":"OCEAN 2 Plus Single-Phase exact AU datasheet and battery warranty V1.4, rechecked 2026-08-23","checked":"2026-08-23"},"ranges":[{"min":5.02,"max":96,"unit":"kWh","market":"global","range_label":"5.02–96 kWh","source_url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","source_revision":"OCEAN 2 Plus Single-Phase exact AU datasheet and battery warranty V1.4, rechecked 2026-08-23","checked":"2026-08-23"}],"supporting_metrics":[]},"score":63,"rubric_version":"2.10.0","url":"https://review.solar/products/ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase"},"envelope":{"version":"1.1.0","subject":{"type":"product","id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","identity_scope":"published_product_record","model":"EcoFlow OCEAN 2 single-phase Plus with EF BD-5-S2; 5.02 kWh scored reference, expandable in 5.02 kWh modules","certification_model":null,"certification_identities":[],"benchmark_series_id":"ecoflow-ocean-2-plus"},"recorded_at":null,"recorded_at_basis":null,"source_bindings":[{"source_id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty throughput"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.End-of-warranty retained capacity (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-04","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_4c6a0bcbaca197e97d2226965719583941d2cf49e18c89ec646e7d1d2dae8137","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-16","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-04","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-04","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"benchmark_evidence","object_scopes":["exact_configuration"],"field_paths":["benchmark.source"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"benchmark_range_evidence","object_scopes":["product_series"],"field_paths":["benchmark.ranges.0"],"jurisdiction":"global","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Modularity & scalability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Continuous power output (kW)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup surge / motor-start capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty throughput"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.End-of-warranty retained capacity (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell chemistry"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal & fire mitigation"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.AC terminal & connection protection"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection (outdoor)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell provenance & traceability"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"decision_evidence","object_scopes":["decision_evidence"],"field_paths":["decision_evidence.battery_performance.items.0"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-25","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"decision_evidence","object_scopes":["decision_evidence"],"field_paths":["decision_evidence.battery_performance.items.1"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-25","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","role":"primary_product_source","object_scopes":["exact_product_record"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_98940b39a9e3803f8dc46f49c29f7812d49909c6ce09dfd7c3d761e506441b44","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-16","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Modularity & scalability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Continuous power output (kW)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup surge / motor-start capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell chemistry"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal & fire mitigation"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.AC terminal & connection protection"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection (outdoor)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell provenance & traceability"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-04","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Modularity & scalability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Continuous power output (kW)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup surge / motor-start capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell chemistry"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.AC terminal & connection protection"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection (outdoor)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell provenance & traceability"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null}],"events":[{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","object_id":null,"date":"2026-08-23","event_type":"product_evidence_checked","summary":"Core scorecard evidence checked","scope":"product_record","jurisdiction":null,"source_ids":[],"event_id":"evt_6375b73fcbe34ddab82b9d5f46004f9e58ecdd73447b025c3eb3bee35ddc5dcc"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","object_id":null,"date":"2026-08-23","event_type":"market_evidence_checked","summary":"AU market evidence checked","scope":"market_overlay","jurisdiction":"AU","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"],"event_id":"evt_3a6dd96b81c27018dacefe26a9ce72edc2793587bbb7197c0bd5bfc47165bf4e"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","object_id":null,"date":"2026-08-23","event_type":"benchmark_evidence_checked","summary":"Series benchmark evidence checked","scope":"scored_benchmark","jurisdiction":null,"source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"evt_e724422de8018ee4cffee765970d9668eb848eef754c59f9ecc1da6ab147161f"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","object_id":null,"date":"2026-08-16","event_type":"market_evidence_checked","summary":"DE market evidence checked","scope":"market_overlay","jurisdiction":"DE","source_ids":["src_4c6a0bcbaca197e97d2226965719583941d2cf49e18c89ec646e7d1d2dae8137","src_98940b39a9e3803f8dc46f49c29f7812d49909c6ce09dfd7c3d761e506441b44"],"event_id":"evt_458b4eb58d2454d4ebb0145306ac901e271711b0467ee8ba3ad526c2c3005aeb"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","object_id":null,"date":"2026-08-04","event_type":"market_evidence_checked","summary":"US market evidence checked","scope":"market_overlay","jurisdiction":"US","source_ids":["src_223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373","src_857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509","src_9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9","src_cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de"],"event_id":"evt_48dc047d9c362c4e5e362388ec4098ed2f04d2353a74444a9db572cdf996c91d"}]},"change_history":{"schemaVersion":"1.0.0","baseline":{"dataset_revision":"rel_bcce8c246a65d51663134988c0ee07203ae81007281b5169834d130773e56cf0","product_count":232,"recorded_at":"2026-08-16","recorded_at_basis":"latest_record_date_in_baseline"},"current_release_id":"rel_535c3e7876133979d2316d1462e79e14f1b603ae00fca9017eb31ce577346a73","events":[{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.cycle_life_to_70.confidence","field_label":"Confidence","before":null,"after":"high","summary":"Confidence updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_d6bf9110b5a6d4dc0db2120e303fd5cbad7f2316ee9172bff0d551ed759abacf"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.cycle_life_to_70.source_urls","field_label":"Evidence sources","before":null,"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"],"summary":"Evidence sources updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_d417f11bd9f17b7eaf6e06f395facd049a6f78fbf9eb8e4f30015226f747663a"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.round_trip_efficiency.source_urls","field_label":"Evidence sources","before":null,"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"],"summary":"Evidence sources updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_9892a909ebbf10db4c74e587f88215e6d28e17a5d3d2813eb0b2af6fc49fcba8"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.round_trip_efficiency.value","field_label":"Value","before":null,"after":"Reviewed 2026-08-25: no exact-product battery/DC round-trip efficiency with a complete measurement boundary was established in the reviewed primary source set. This is a scoped reviewed absence, not proof that the value has never been measured.","summary":"Value updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_7d83ca8b03cfa39f665ccbbb2845187b07db2bc6982c77b414c7d4b4c565b9df"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.round_trip_efficiency.confidence","field_label":"Confidence","before":null,"after":"high","summary":"Confidence updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_6f79b9345374d9919493f5ce38197e20a65126cc2d0385e646dcbb36ebaff09e"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.cycle_life_to_70.state","field_label":"State","before":null,"after":"reviewed_absence","summary":"State updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_6f15d9e23da4a446d4d8dc3400fb7685bee1774be051f48840c3762025293546"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.cycle_life_to_70.value","field_label":"Value","before":null,"after":"Reviewed 2026-08-25: no exact-product cycle-life result to exactly 70% retained capacity was established in the reviewed primary source set. Warranty limits and other or unstated endpoints are not converted. This is a scoped reviewed absence.","summary":"Value updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_52925e334d3a54e3b254dd0c167eb947cf73aaf2098af8882251eec3b1d2f58a"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_7b3f83caf97b6a2d5a8919d9b9649d1c0582d2823878b1ec650ca544ed2aaff3","event_type":"field_added","field_path":"decision_evidence.battery_performance.round_trip_efficiency.state","field_label":"State","before":null,"after":"reviewed_absence","summary":"State updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_3ac2bf7b032cdad7e184057b188cd357b75ab1cf1d18458a340ad22f2c0e5a83"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_added","field_path":"audit_rows.Warranty throughput.value","field_label":"Warranty throughput","before":null,"after":"2.5-5 MWh warranted per kWh usable","summary":"Warranty throughput updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_ed142887462855aa026e562f92aa314ca57789a84a41918cb58fd4ecdf93a607"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_removed","field_path":"audit_rows.Cycle life (cycles to 70%).evidence_status","field_label":"Cycle life (cycles to 70%): Evidence status","before":"sourced","after":null,"summary":"Cycle life (cycles to 70%): Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_ebb43c213a18c34f281aaeab6438540490de4b18f6249c19ee42f500a12026c7"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.ranges","field_label":"Ranges","before":[{"checked":"2026-06-20","market":"global","max":60,"min":5,"range_label":"5–60 kWh","source_revision":"Live source; revision not stated","source_url":"https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","unit":"kWh"}],"after":[{"checked":"2026-08-23","market":"global","max":96,"min":5.02,"range_label":"5.02–96 kWh","source_revision":"OCEAN 2 Plus Single-Phase exact AU datasheet and battery warranty V1.4, rechecked 2026-08-23","source_url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","unit":"kWh"}],"summary":"Ranges updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_e71b670c2f05a87c7ce1442ae18a4349f1f2cb4313ce2b640d8fb3bff2a01463"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Safety & Chemistry.score_precise","field_label":"Safety & Chemistry pillar score","before":92.7,"after":88.2,"summary":"Safety & Chemistry pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_e0f3f5df4b9bb1c3c74e8d8329ca42b50e34efb2e0a0504ce54400ac82db12b3"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Backup surge / motor-start capability.value","field_label":"Backup surge / motor-start capability","before":"No surge rating published (integrated / AC-coupled system)","after":"Peak/surge rating published with duration","summary":"Backup surge / motor-start capability updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_dfa8d83517dec4927a4a0ee4ac28374cc4353446df21793eb7a1915b7b6f17bd"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"OCEAN 2 Australian availability, cloud, security and financial-evidence boundary re-audited 2026-08-06","after":"EcoFlow OCEAN 2 exact Australian product documents, LFP manual and battery warranty V1.4 valid 15 August 2026, rechecked 2026-08-23.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_d17e40b0e78c9b8448a8ed78beb2a7872cd0be872170d0a0e18ad027940b7ae7"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Guarantee & Backbone.score_precise","field_label":"Guarantee & Backbone pillar score","before":56.5,"after":50.5,"summary":"Guarantee & Backbone pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_c951d75d773dd7bc791d5a065dc45ce9e782cf2ad4161cce2cb197a5d1962254"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_removed","field_path":"audit_rows.Cycle life (cycles to 70%).value","field_label":"Cycle life (cycles to 70%)","before":"6000","after":null,"summary":"Cycle life (cycles to 70%) updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_c2948ccaba92eefdf5e7d4052392b2c92a3b9f82042caa15b91d10a1175450e9"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.warranty_scope","field_label":"AU Warranty scope","before":"Australia; Ecoflow Australia Pty Ltd issues 15 years or 6,000 charge/discharge cycles, whichever comes first, for EF BD-5-S2. The battery is guaranteed to 70% nominal capacity and 20.2 MWh aggregate throughput. Materials, repair labour and approved logistics are borne by EcoFlow for an accepted claim.","after":"Australia and New Zealand; EcoFlow OCEAN 2 Battery Warranty V1.4 gives EF BD-5-S2 15 years or 21.9 MWh, whichever occurs first, with 60% remaining usable energy. Continuous internet connectivity is a condition; more than one year disconnected reduces the term to five years.","summary":"AU Warranty scope updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_9d6d14ef6edf2902b46e89a72876a2054c4efc136a2cb31825a6629639fc0155","src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51","src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"],"event_id":"chg_c24ac3c2dd2c243e0951bc9bdc21a9e18029df9e581d643412b0954c0aced00a"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.max","field_label":"Max","before":60,"after":96,"summary":"Max updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_bfc63854ff6c0a2292f648c41017b770a74daadc97306f9f55d9a10f52c9009e"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","https://cer.gov.au/document/cec-approved-solar-batteries-0","https://energy.ecoflow.com/au/documentation","https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1785313802701/EcoFlow%20Warranty%20Policy%20for%20Home%20Solar%20Battery%20Solutions%20in%20Australia.pdf","https://www.ecoflow.com/global/about-us"],"after":["https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","https://cer.gov.au/document/cec-approved-solar-batteries-0","https://energy.ecoflow.com/au/documentation","https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207947012/EcoFlow%20OCEAN%202%20Three-Phase_Warranty%20Policy%20for%20Inverter%20in%20Australia%20%26%20New%20Zealand_V1.4.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf","https://www.ecoflow.com/global/about-us"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_9d6d14ef6edf2902b46e89a72876a2054c4efc136a2cb31825a6629639fc0155","src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51","src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"],"event_id":"chg_b210ab2d0d768c9505617f0a36b65a5b40953edfaa7276e3156b7e88992a5ec1"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"primary_source","field_label":"Primary Source","before":"https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","after":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","summary":"Primary Source updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_ad5ff54fea7b24f686ec53dbb303a79096c1aceace8ae1f6f7199a0d7033e23e"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","https://cer.gov.au/document/cec-approved-solar-batteries-0","https://energy.ecoflow.com/au/documentation","https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207947012/EcoFlow%20OCEAN%202%20Three-Phase_Warranty%20Policy%20for%20Inverter%20in%20Australia%20%26%20New%20Zealand_V1.4.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf","https://www.ecoflow.com/global/about-us"],"after":["https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","https://cer.gov.au/document/cec-approved-solar-batteries-0","https://energy.ecoflow.com/au/documentation","https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf","https://www.ecoflow.com/global/about-us"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_9d6d14ef6edf2902b46e89a72876a2054c4efc136a2cb31825a6629639fc0155","src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"],"event_id":"chg_a325a763e3b0afa2dc1a2da741d9878a8620083c03d9eb3f4c4e6b7152614710"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Modularity & scalability.source_urls","field_label":"Modularity & scalability: Evidence sources","before":["https://energy.ecoflow.com/au/documentation"],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Modularity & scalability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_a1b351f0ec54ca19df175b5beb077a46bd28945468bf0a4ac106343906dcae99"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_added","field_path":"audit_rows.Warranty throughput.evidence_status","field_label":"Warranty throughput: Evidence status","before":null,"after":"sourced","summary":"Warranty throughput: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_9fcde559b0853c7e7a927f75dda170694484e7d6b86541b21bea6f8eb7b4747d"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty assurance.value","field_label":"Warranty assurance","before":"Parts & labour","after":"Parts only","summary":"Warranty assurance updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_8ea8433badedd105c804245de59a59e2d0f47c57949b0e87264ca6adc10c5fbf"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.source","field_label":"Source","before":{"checked":"2026-06-20","source_revision":"Live source; revision not stated","source_url":"https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery"},"after":{"checked":"2026-08-23","source_revision":"OCEAN 2 Plus Single-Phase exact AU datasheet and battery warranty V1.4, rechecked 2026-08-23","source_url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"},"summary":"Source updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_8bf57f8cc857838954d7c7ac9e21f8f60b71d3e4087477a07d566df38a14ccc4"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Operating temperature range.source_urls","field_label":"Operating temperature range: Evidence sources","before":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Operating temperature range: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_8989ed5782c8ac1deebc27d79cc532072bfd870ad1d4f80a43254aa8751b56b0"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty period (yrs).source_urls","field_label":"Warranty period (yrs): Evidence sources","before":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1785313802701/EcoFlow%20Warranty%20Policy%20for%20Home%20Solar%20Battery%20Solutions%20in%20Australia.pdf"],"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf"],"summary":"Warranty period (yrs): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_85a5fb9b617a6fbeb30eb0ec1d05ca1f04c902b7e3262660b4907171cece5bdf"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_added","field_path":"audit_rows.Warranty throughput.source_urls","field_label":"Warranty throughput: Evidence sources","before":null,"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf"],"summary":"Warranty throughput: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_83aaac2f35dc1551cf60d50b3e34ca0dff352552292f7cb71fcc95dcd163c518"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Cell provenance & traceability.evidence_status","field_label":"Cell provenance & traceability: Evidence status","before":"sourced","after":"reviewed_absence","summary":"Cell provenance & traceability: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_7fea9468e79a040adb14c31029701f234e211e6549b89dee4bf76aac93be77a9"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Backup surge / motor-start capability.source_urls","field_label":"Backup surge / motor-start capability: Evidence sources","before":[],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Backup surge / motor-start capability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_7f122c5c5e5bda2312816b70d4b60b7272f20fbbcaa8bc15fc3e6dd689dfe062"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty assurance.source_urls","field_label":"Warranty assurance: Evidence sources","before":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1785313802701/EcoFlow%20Warranty%20Policy%20for%20Home%20Solar%20Battery%20Solutions%20in%20Australia.pdf"],"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf"],"summary":"Warranty assurance: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_7d29d8e0a52123ed531d4b9c50a8f295771aa627352087e6f8356bb1a00eb84b"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Verified reliability.source_urls","field_label":"Verified reliability: Evidence sources","before":[],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Verified reliability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_7cb8bb975e3bf63d19ff56dd3cd4a5b86725ae9434f43409f03356d6ef541802"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Thermal & fire mitigation.source_urls","field_label":"Thermal & fire mitigation: Evidence sources","before":[],"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Thermal & fire mitigation: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c"],"event_id":"chg_7a36394079ebdff10218dd10e468f10281ef9955f9caf0919bfa32f114f439af"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.End-of-warranty retained capacity (%).source_urls","field_label":"End-of-warranty retained capacity (%): Evidence sources","before":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1785313802701/EcoFlow%20Warranty%20Policy%20for%20Home%20Solar%20Battery%20Solutions%20in%20Australia.pdf"],"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf"],"summary":"End-of-warranty retained capacity (%): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_774686581456df6915bced312cd01d6ed327ffa8c583b95b03ae946bdebfed20"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.min","field_label":"Min","before":5,"after":5.02,"summary":"Min updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_6a24843e51b526239de1508d1ad83fe0a7cf2b623e54a3442ddc52253d320617"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.range_label","field_label":"Range Label","before":"5–60 kWh","after":"5.02–96 kWh","summary":"Range Label updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_63d732ab8f7587b7de5fbeaa4d5c378d222dbe8b9ad481ffc17158e5cda95715"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Power & Efficiency.score_precise","field_label":"Power & Efficiency pillar score","before":53.1,"after":60.8,"summary":"Power & Efficiency pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_5e1625865d9628458452eafafc295724de22c1fcf1f4c9317b47220fbb909cdf"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.AC terminal & connection protection.value","field_label":"AC terminal & connection protection","before":"Active NTC monitoring, auto power reduction on overheat","after":"Standard terminal protection, no active monitoring","summary":"AC terminal & connection protection updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_54e45a2c8109cd5580c8090b13a296e1eae352a74f2b674ffd74bd230fb6034a"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":64.5,"after":62.6,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_525565f5da965ef0615fa4691b4e8adc7bbf1a4f706c9e1cac13694234c12eef"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_removed","field_path":"audit_rows.Cycle life (cycles to 70%).source_urls","field_label":"Cycle life (cycles to 70%): Evidence sources","before":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1785313802701/EcoFlow%20Warranty%20Policy%20for%20Home%20Solar%20Battery%20Solutions%20in%20Australia.pdf"],"after":null,"summary":"Cycle life (cycles to 70%): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_46c29a46d063e26d457ddc0fce87c08395ea9c0d9c98b4a1bbcc40c0014789d4"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Manufacturing track record.source_urls","field_label":"Manufacturing track record: Evidence sources","before":[],"after":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://www.ecoflow.com/global/about-us"],"summary":"Manufacturing track record: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"],"event_id":"chg_3d4a3da61600b15cc3737e61b40268f1c20e2370a38795e9222f97e73e927fc2"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Cell chemistry.source_urls","field_label":"Cell chemistry: Evidence sources","before":["https://energy.ecoflow.com/au/documentation"],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Cell chemistry: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_3ad0c3b6542203bee692ad8e78c3a3da9e5e5bd4292d9703c0dd91dda8d96c0b"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.metric","field_label":"Metric","before":"usable capacity","after":"nominal battery capacity","summary":"Metric updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_3962424a33c03fb190a5043255dddb6f222ea8e4012944a590f34df2b05e1284"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.End-of-warranty retained capacity (%).value","field_label":"End-of-warranty retained capacity (%)","before":"70","after":"60","summary":"End-of-warranty retained capacity (%) updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"],"event_id":"chg_393130aadc5b19d41c4edb5d5a7317efbf9053a2f0a76d1795b6f0193766719f"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Cell provenance & traceability.source_urls","field_label":"Cell provenance & traceability: Evidence sources","before":[],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Cell provenance & traceability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_34f42854d52f205761330e11e1f13238acc3b308c0067287a5c1db5452f1b3e3"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Longevity (verified).score_precise","field_label":"Longevity (verified) pillar score","before":66.6,"after":60.8,"summary":"Longevity (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_2d26f64980a3a13f5a295bfb78a498fdb29efd6baf270f40ebace715a212fff6"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.US.support_note","field_label":"US Support Note","before":"EcoFlow does not sell Ocean 2 Plus in the United States: its United States product page returns not found, and EcoFlow's own sitemap carries the Ocean 2 Plus page for Australia, Spain, Europe, France and the United Kingdom with no United States entry. The United States equivalent class is served by a different and later platform, OCEAN Pro, whose model numbers EcoFlow states as EF-PCS-24 for the hybrid inverter and EF-BP-10 for the battery. It is not a regional variant of this record: the United States battery module is 10 kWh against 5.02 kWh here, the inverter is rated 11.5 or 24 kVA split phase against 6 to 12 kW single phase, and the United States warranty guarantees 70% of nominal capacity at 15 years or 6000 cycles against the 80% at 10000 cycles this record scores. The United States warranty is more generous in one respect, covering repair labour and logistics rather than parts alone. EcoFlow Technology Inc issues the United States warranty and states it is valid only on products purchased and used in the United States, from 2020 Main St, Irvine, CA 92614. EcoFlow operates a postcode installer locator for the United States.","after":"EcoFlow does not publish the OCEAN 2 Plus exact product for the United States. The US OCEAN Pro platform is a different 10 kWh split-phase product and is not treated as a regional variant or source of inherited warranty rights for this record.","summary":"US Support Note updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373","src_857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509","src_9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9","src_cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de"],"event_id":"chg_25ae85ffe20e097520a67dea6f721486e686b8ef4a6ec8931e617a5f34a8a70e"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Verified reliability.evidence_status","field_label":"Verified reliability: Evidence status","before":"sourced","after":"reviewed_absence","summary":"Verified reliability: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_1da73739fb020aead442b1d69e94521bfb9802522cf7b5264d2146a9d48cd040"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.warranty_terms","field_label":"AU Warranty conditions","before":{"labour":"Repair labour for an accepted in-term claim is borne by EcoFlow.","registration":"Network activation records installation automatically; a qualified installer records installation for an offline product. Proof of purchase, serial number and visual fault evidence are required.","remedy":"Online troubleshooting, factory repair, refurbishment or replacement through EcoFlow or an authorised installer.","removal_reinstallation":"Return and replacement must proceed through EcoFlow's authorised installer process; no unrestricted owner-arranged reimbursement is stated.","transferability":"The policy is written for the first consumer and does not state an automatic later-owner transfer right.","transport":"Approved logistics are borne by EcoFlow; self-dispatched or inadequately packed returns can be excluded."},"after":{"labour":"The battery policy does not state an owner entitlement to site labour, removal or reinstallation; no labour cover is inferred.","registration":"The system must remain connected to the internet. More than one year disconnected reduces the warranty to five years; same-site transfer also requires new-owner registration.","remedy":"EcoFlow may provide online assistance, factory repair, refurbishment or replacement for an accepted claim.","removal_reinstallation":"No unrestricted removal and reinstallation entitlement is stated.","transferability":"Transfer to the next owner is conditional on the product remaining at its initial installation address and the new owner registering it with EcoFlow.","transport":"Materials, accessories and approved logistics for an accepted claim are borne by EcoFlow, subject to the policy process."},"summary":"AU Warranty conditions updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_9d6d14ef6edf2902b46e89a72876a2054c4efc136a2cb31825a6629639fc0155","src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51","src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"],"event_id":"chg_14427898399fb8c362bfdd787e279bc291df56d3ad6dca17241ee5a44232f091"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Safety certification.source_urls","field_label":"Safety certification: Evidence sources","before":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Safety certification: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_1435087a8bf8d4c8c55269366aea9b1ff53cfddb4316e6a15be1c15030d8e844"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Ingress protection (outdoor).source_urls","field_label":"Ingress protection (outdoor): Evidence sources","before":["https://energy.ecoflow.com/au/documentation"],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Ingress protection (outdoor): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_0a95fd90f540823f2c09133dfee168d81994f5b9f8d1a25b000cac50e67dbbd2"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Firmware & security disclosure.source_urls","field_label":"Firmware & security disclosure: Evidence sources","before":["https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery"],"after":["https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"],"summary":"Firmware & security disclosure: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_09fba981bfca22c8291fc8659f21086d45d904cfe2e2dbd8b1a34d42fc28aeb8"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Continuous power output (kW).source_urls","field_label":"Continuous power output (kW): Evidence sources","before":["https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf"],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"Continuous power output (kW): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_09d6ac47e350e1c202a3bf10c2e8e919de94f477b41d6c63a43fbcaad34ce76a"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.AC terminal & connection protection.evidence_status","field_label":"AC terminal & connection protection: Evidence status","before":"sourced","after":"reviewed_absence","summary":"AC terminal & connection protection: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_064f73baa0f0070219de1aa358a7a3a1a59236094752227744b3d969226853b6"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.scored_model","field_label":"Scored Model","before":"EcoFlow Ocean 2 Plus (single-phase hybrid inverter + 5 kWh LFP battery modules, stackable to 60 kWh)","after":"EcoFlow Ocean 2 Plus (single-phase hybrid inverter + 5.02 kWh nominal LFP modules, expandable to 96 kWh)","summary":"Scored Model updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_017d8cb505edce9c42041484fe3b3ad280ef19d48817ef41c0b1657cf9e88962"},{"subject_id":"ecoflow-technology-inc-ecoflow-ocean-2-plus-single-phase","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.AC terminal & connection protection.source_urls","field_label":"AC terminal & connection protection: Evidence sources","before":[],"after":["https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf"],"summary":"AC terminal & connection protection: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"],"event_id":"chg_00b87ce572f1b05cf0b379f47e1271dd10457384c827066f3b8ccf1fa1855cec"}],"sources":[{"id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"},"content_fingerprint":null,"retrieval":null},{"id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf","label":"Warranty throughput","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd"},"content_fingerprint":null,"retrieval":null},{"id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","url":"https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","label":"Modularity & scalability","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"},"content_fingerprint":null,"retrieval":null},{"id":"src_d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1785313802701/EcoFlow%20Warranty%20Policy%20for%20Home%20Solar%20Battery%20Solutions%20in%20Australia.pdf","label":"Cycle life (cycles to 70%)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d3659260b562a6a66366cefad76cf5417bf45b2a66acee2b6d197a8c78fb3f51"},"content_fingerprint":null,"retrieval":null},{"id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf","label":"Modularity & scalability","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c"},"content_fingerprint":null,"retrieval":null},{"id":"src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","url":"https://www.ecoflow.com/global/about-us","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5"},"content_fingerprint":null,"retrieval":null},{"id":"src_9d6d14ef6edf2902b46e89a72876a2054c4efc136a2cb31825a6629639fc0155","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207947012/EcoFlow%20OCEAN%202%20Three-Phase_Warranty%20Policy%20for%20Inverter%20in%20Australia%20%26%20New%20Zealand_V1.4.pdf","label":"AU market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9d6d14ef6edf2902b46e89a72876a2054c4efc136a2cb31825a6629639fc0155"},"content_fingerprint":null,"retrieval":null},{"id":"src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","url":"https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","label":"Firmware & security disclosure","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca"},"content_fingerprint":null,"retrieval":null},{"id":"src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","url":"https://energy.ecoflow.com/au/documentation","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c"},"content_fingerprint":null,"retrieval":null},{"id":"src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20","url":"https://cer.gov.au/document/cec-approved-solar-batteries-0","label":"Australian approved-product source identity","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"},"content_fingerprint":null,"retrieval":null},{"id":"src_223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373","url":"https://solarequipment.energy.ca.gov/Home/PropertyDetails/EnergyStorage","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373"},"content_fingerprint":null,"retrieval":null},{"id":"src_857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1766390669835/EF_OCEAN%20Pro%20Hybrid%20Interter_Datasheet_A4_251209_View.pdf","label":"US market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509"},"content_fingerprint":null,"retrieval":null},{"id":"src_9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1766390613988/EF_OCEAN%20Pro%20Battery_Datasheet_View_A4_251105.pdf","label":"US market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9"},"content_fingerprint":null,"retrieval":null},{"id":"src_cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de","url":"https://energy.ecoflow.com/us/support/warranty-and-policy","label":"US market evidence","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de"},"content_fingerprint":null,"retrieval":null}]},"approval_history":[],"sources":[{"id":"src_0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1787207991309/EcoFlow%20Warranty%20Policy%20for%20OCEAN%202%20Battery%20in%20Australia%20%26%20New%20Zealand%20V1.4-EN.pdf","label":"Warranty throughput","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"0f881a5b2cd9ffc9c1c3f34717d7b5d158dce262469aa9bd28528bafe18ae2bd"},"content_fingerprint":null,"retrieval":null},{"id":"src_223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373","url":"https://solarequipment.energy.ca.gov/Home/PropertyDetails/EnergyStorage","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"223dcd438355ae98521f2afd48f81fea575e9c7b1c755e5b612c280cad210373"},"content_fingerprint":null,"retrieval":null},{"id":"src_2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5","url":"https://www.ecoflow.com/global/about-us","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"2d23aa2c398856672e8fe624ed6d46e3d693af0069cfb51569beadb09580e1c5"},"content_fingerprint":null,"retrieval":null},{"id":"src_4c6a0bcbaca197e97d2226965719583941d2cf49e18c89ec646e7d1d2dae8137","url":"https://energy.ecoflow.com/de/products/ocean-2-single-phase-home-battery","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"4c6a0bcbaca197e97d2226965719583941d2cf49e18c89ec646e7d1d2dae8137"},"content_fingerprint":null,"retrieval":null},{"id":"src_857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1766390669835/EF_OCEAN%20Pro%20Hybrid%20Interter_Datasheet_A4_251209_View.pdf","label":"US market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"857a26035b28f28a2c92f47d31a61c9a2751d75ac6d0404d0a3d2065106de509"},"content_fingerprint":null,"retrieval":null},{"id":"src_9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1766390613988/EF_OCEAN%20Pro%20Battery_Datasheet_View_A4_251105.pdf","label":"US market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9400f6332f0b553495641473f5f21c912bce86f1b271d0714d851806c7d2dbe9"},"content_fingerprint":null,"retrieval":null},{"id":"src_9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1783491841822/EcoFlow_OCEAN%202%20Plus%20Single-Phase_Datasheet_AU_08-07-26.pdf","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9524faae8991b42b55b1d9ec5ef180d16c6cb5980130c06e4c24c61664f3e499"},"content_fingerprint":null,"retrieval":null},{"id":"src_98940b39a9e3803f8dc46f49c29f7812d49909c6ce09dfd7c3d761e506441b44","url":"https://energy.ecoflow.com/eu/products/ocean-2-plus-single-phase-home-battery","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"98940b39a9e3803f8dc46f49c29f7812d49909c6ce09dfd7c3d761e506441b44"},"content_fingerprint":null,"retrieval":null},{"id":"src_b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca","url":"https://account.ecoflow.com/agreement/en-uk/EFSRC_Vulnerability_Disclosure_Plan.html","label":"Firmware & security disclosure","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b4033f989e8a7246310cee4f1d2909b56fb4e43e8e6f3f23fb81a2f34bae28ca"},"content_fingerprint":null,"retrieval":null},{"id":"src_c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c","url":"https://enterprise-service-us-cdn.ecoflow.com/enterprise/documentation/1786959153116/EcoFlow%20OCEAN%202%20LFP%20Battery%205kWh%20User%20Manual_Multilingual_V1.0.pdf","label":"Modularity & scalability","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c00ac65d5c2ccf7555ae57c89145826e53ae8830bc63ec64c6d4492bdc5e6c7c"},"content_fingerprint":null,"retrieval":null},{"id":"src_cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de","url":"https://energy.ecoflow.com/us/support/warranty-and-policy","label":"US market evidence","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"cbd5dfc15126bacb6fe282c43c246ec90ef8927b0a04212497d9baf1c099c0de"},"content_fingerprint":null,"retrieval":null},{"id":"src_ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c","url":"https://energy.ecoflow.com/au/documentation","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ccdb06a09d2b04377ebe7bc2f1fce9770f4bc0380e99844d2f55233d2310d25c"},"content_fingerprint":null,"retrieval":null},{"id":"src_cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc","url":"https://energy.ecoflow.com/au/products/ocean-2-plus-single-phase-home-battery","label":"Modularity & scalability","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"cd60fa5b306f5eef765079969fe4df6951f2a676cc603e4cf52bd5bf8d8e8adc"},"content_fingerprint":null,"retrieval":null},{"id":"src_dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20","url":"https://cer.gov.au/document/cec-approved-solar-batteries-0","label":"Australian approved-product source identity","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"dfb5e2a5085ab2e67aaa24f298b2ddfeaaa4ac4aa5c7b9e5751a8f036dd51d20"},"content_fingerprint":null,"retrieval":null}],"boundaries":{"rights":"An unresolved licence field is not permission to cache, redistribute, derive from, or use a source for AI.","history":"Evidence events record verification activity. Change-history events separately record accepted before-and-after publication changes.","change_history":"Events record accepted publication changes, not every evidence re-check or a claim that the product changed on that date.","change_validity":"valid_from and valid_to remain null unless a source establishes when the changed fact applied in the world.","change_scope":"Compatibility, system pairing, suitability and relative leaderboard prose are excluded.","applicability":"Market evidence does not establish stock, system compatibility, network approval, installation suitability, or approval of an earlier installation.","approval_history":"Approval history contains exact, score-neutral source-register links recorded since monitoring began. It is not a complete lifetime history."}}