{"schemaVersion":"1.1.0","subject":{"slug":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","kind":"inverter","brand":"Fronius","name":"Tauro ECO","canonical_name":"Fronius Tauro ECO 100 kW","model":"Tauro ECO 100-3-D (100 kW, three-phase, Direct wiring)","certification_model":null,"certification_identities":[],"benchmark":{"min":100,"max":100,"scored":100,"unit":"kW","metric":"rated AC power","policy":"highest_in_series","review_status":"current","note":"The score is anchored to the highest published rating in this exact series.","range_label":"100 kW","scored_label":"100 kW","market":null,"series_id":"fronius-tauro-eco","series_definition":"Same electrical platform, phase configuration, grid region and enclosure; output-bin changes only.","scored_model":"Tauro ECO 100-3-D (100 kW, three-phase, Direct wiring)","evidence_scope":"exact_model","source":{"source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","checked":"2026-08-23"},"ranges":[{"min":100,"max":100,"unit":"kW","market":"global","range_label":"100 kW","source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","checked":"2026-08-23"}],"supporting_metrics":[]},"score":75,"rubric_version":"3.7.0","url":"https://review.solar/products/fronius-international-gmbh-fronius-tauro-eco-100-3-d"},"envelope":{"version":"1.1.0","subject":{"type":"product","id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","identity_scope":"published_product_record","model":"Tauro ECO 100-3-D (100 kW, three-phase, Direct wiring)","certification_model":null,"certification_identities":[],"benchmark_series_id":"fronius-tauro-eco"},"recorded_at":null,"recorded_at_basis":null,"source_bindings":[{"source_id":"src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal load management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.EV charging integration"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Semiconductor technology"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Peak efficiency (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Weighted efficiency (CEC/Euro %)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Night standby consumption (W)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Number of MPPTs"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max DC:AC oversizing ratio"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max input current per MPPT (A)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Surge protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Hybrid / battery capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup / islanding"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Monitoring & smart features"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Reactive power range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Grid & safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Shutdown / arc safety"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Open protocol & API maturity"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.VPP & grid services readiness"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Smart home & IoT depth"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"decision_evidence","object_scopes":["decision_evidence"],"field_paths":["decision_evidence.inverter_envelope.items.0"],"jurisdiction":null,"evidence_classes":["supported"],"checked_at":"2026-08-25","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5e0f19e3c428e1f85ed93efc27fb05418350a83b5cfa8e63523aabb90a974f7a","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Grid & safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-31","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.EV charging integration"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-31","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-31","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal load management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Semiconductor technology"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal load management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"benchmark_evidence","object_scopes":["exact_model"],"field_paths":["benchmark.source"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"benchmark_range_evidence","object_scopes":["product_series"],"field_paths":["benchmark.ranges.0"],"jurisdiction":"global","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Peak efficiency (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Weighted efficiency (CEC/Euro %)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Semiconductor technology"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Night standby consumption (W)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Number of MPPTs"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max DC:AC oversizing ratio"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max input current per MPPT (A)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Surge protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Hybrid / battery capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup / islanding"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Monitoring & smart features"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Reactive power range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Grid & safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Shutdown / arc safety"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Open protocol & API maturity"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.VPP & grid services readiness"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Smart home & IoT depth"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"decision_evidence","object_scopes":["decision_evidence"],"field_paths":["decision_evidence.inverter_envelope.items.0"],"jurisdiction":null,"evidence_classes":["supported"],"checked_at":"2026-08-25","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"primary_product_source","object_scopes":["exact_product_record"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.EV charging integration"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal load management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02","role":"buyer_boundary_evidence","object_scopes":["buyer_boundary"],"field_paths":["buyer_boundary"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-10-05","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.EV charging integration"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null}],"events":[{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-30","event_type":"product_evidence_checked","summary":"Core scorecard evidence checked","scope":"product_record","jurisdiction":null,"source_ids":[],"event_id":"evt_cae5bd7be2347d6b39e26f58f222b364e2329d61cfd5d3b214905fb03423ddfe"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-30","event_type":"market_evidence_checked","summary":"DE market evidence checked","scope":"market_overlay","jurisdiction":"DE","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"evt_f579c1053c4f257abca790d7d5a8daa96f59e7a0f16819a55d9dcd046bd76824"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-30","event_type":"market_evidence_checked","summary":"US market evidence checked","scope":"market_overlay","jurisdiction":"US","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"evt_62ea7cfd2904e0b03801805c3e5d447d89452a7bbb45957a93ad18f0f7d1af31"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-23","event_type":"market_evidence_checked","summary":"AU market evidence checked","scope":"market_overlay","jurisdiction":"AU","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"evt_3238a04837e7dc113006efda3df867c74319b4a87f314939c2ea01cf9e5b4347"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-23","event_type":"benchmark_evidence_checked","summary":"Series benchmark evidence checked","scope":"scored_benchmark","jurisdiction":null,"source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"evt_952052f9ad85252c3e7cb116d273479447fb84774c27f227b3deb49a1635b739"}]},"change_history":{"schemaVersion":"1.0.0","baseline":{"dataset_revision":"rel_bcce8c246a65d51663134988c0ee07203ae81007281b5169834d130773e56cf0","product_count":232,"recorded_at":"2026-08-16","recorded_at_basis":"latest_record_date_in_baseline"},"current_release_id":"rel_74f929e687d073b4f661de6f30062a5a452ece4c18e4e1d123f3697856ddc908","events":[{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_7596d4e3d4990c86b6727eb20adaa887b5ab3f1abaca2dbc437321515cc44ab5","event_type":"field_changed","field_path":"audit_rows.Grid & safety certification.source_urls","field_label":"Grid & safety certification: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://cer.gov.au/document/cec-approved-inverters-0","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Grid & safety certification: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-19","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5e0f19e3c428e1f85ed93efc27fb05418350a83b5cfa8e63523aabb90a974f7a","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_ea88bf7bd159c9e96ad1f709b709b6bfe946e10011db52b93b724f0742aa7f06"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_930fd5cbbdd205f7ee2584d900916e8fea64153e31284122b1010af547f2f4b5","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://cer.gov.au/document/cec-approved-inverters","https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://cer.gov.au/document/cec-approved-inverters","https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN_AUS.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-10-08","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_d4ad377961a1ff436c92e1502e381d60ed76b5300638d09f6ced7cb2e5f57095"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_930fd5cbbdd205f7ee2584d900916e8fea64153e31284122b1010af547f2f4b5","event_type":"field_changed","field_path":"market.AU.warranty_terms","field_label":"AU Warranty conditions","before":{"labour":"Warranty Plus includes servicing by the authorised service pathway; owner-selected work is not an unrestricted entitlement.","registration":"Solar.web registration is required. For inverters commissioned on or after 1 June 2026, registration is required for the free ten-year Warranty Plus offer.","remedy":"Registered Warranty Plus covers replacement materials and servicing under the governing certificate and claim process.","removal_reinstallation":"No unrestricted project-wide removal and reinstallation entitlement is stated.","transferability":"An automatic later-owner transfer entitlement is not stated on the reviewed Australian warranty summary.","transport":"Australian transport is included under Warranty Plus, subject to the governing terms."},"after":{"labour":"Warranty Plus includes servicing by the authorised service pathway; owner-selected work is not an unrestricted entitlement.","registration":"Solar.web registration is required. For inverters commissioned on or after 1 June 2026, registration is required for the free ten-year Warranty Plus offer.","remedy":"Registered Warranty Plus covers replacement materials and servicing under the governing certificate and claim process.","removal_reinstallation":"No unrestricted project-wide removal and reinstallation entitlement is stated.","transferability":"Clause 2.3 of the Fronius International Limited Warranty Conditions (EN_0326, for products purchased on or after 1 June 2026, covering Fronius inverters as a product group without naming the model) transfers the warranty claims existing at the time of transfer to a later owner; the transfer does not extend, renew or expand the warranty.","transport":"Australian transport is included under Warranty Plus, subject to the governing terms."},"summary":"AU Warranty conditions updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-10-08","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_b9725f47dee66c8d6630089222e230b430e7081cb923dd528ba26465fc9594cf"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_930fd5cbbdd205f7ee2584d900916e8fea64153e31284122b1010af547f2f4b5","event_type":"field_changed","field_path":"market.AU.support_note","field_label":"AU Support Note","before":"Fronius Australia Pty Ltd provides the local warranty and service pathway. The approval expiry is close enough to require a live check before procurement.","after":"Fronius Australia Pty Ltd provides the local warranty and service pathway and is named as the Australian warrantor in clause 12.4.1 of the International Limited Warranty Conditions (EN_0326). The listed approval expiry is 22 December 2026, so approval status needs a live check before procurement.","summary":"AU Support Note updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-10-08","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_8ce2fecc4a6903e4d39e8ca83aa7b9590bd74286de5cee84d5614554b5ed8396"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_930fd5cbbdd205f7ee2584d900916e8fea64153e31284122b1010af547f2f4b5","event_type":"field_changed","field_path":"market.AU.grid_compatibility","field_label":"AU Grid and installation context","before":"Tauro ECO 100-3-D is listed at 100 kW through 23 September 2026 in the 29 July 2026 export. Renewal and project connection remain separate checks.","after":"Tauro ECO 100-3-D is listed at 100 kW through 22 December 2026 in the Clean Energy Regulator export last modified 24 September 2026; the export with data as at 30 September 2026 carries the same row. Renewal after that date is not assumed, and project connection remains a separate check.","summary":"AU Grid and installation context updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-10-08","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_7843af8e3cdffe48b4fa50bfc7710420ded2622838c9eb4ee4d8b8f108221e4a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_930fd5cbbdd205f7ee2584d900916e8fea64153e31284122b1010af547f2f4b5","event_type":"field_changed","field_path":"audit_rows.Thermal management.source_urls","field_label":"Thermal management: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://manuals.fronius.com/HTML/4204260307/en-US.html","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Thermal management: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-08","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95"],"event_id":"chg_3a4ce40f539e01b611340b90c069cca95b43260961b21dd8428d02d7ba209a87"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_930fd5cbbdd205f7ee2584d900916e8fea64153e31284122b1010af547f2f4b5","event_type":"field_changed","field_path":"market.AU.warranty_scope","field_label":"AU Warranty scope","before":"Free ten-year Fronius Warranty Plus requires Solar.web registration under the current AU offer; paid extension is offered to fifteen years subject to eligibility.","after":"Clause 12.2 of the Fronius International Limited Warranty Conditions (EN_0326), which apply to products purchased on or after 1 June 2026 and cover Fronius inverters as a product group without naming the model, sets a five-year Warranty Plus period for inverters in Australia and a total of ten years when the inverter is registered on Solar.web within 30 months of ex-works delivery; clause 2.2 also makes inverter cover conditional on that registration, and the document does not reconcile the two clauses. Clause 12.2.4 gives inverters installed from 1 October 2025 to 31 December 2026 a promotional five-year Warranty Plus extension, for ten years of Warranty Plus in total; for inverters installed after that window, the document is silent on whether years six to ten carry Warranty Plus or the Fronius Warranty model, which excludes labour and transport (clause 6.2). The Australian warranty page describes the registered offer as free ten-year Warranty Plus, with a paid extension to fifteen years for a fee.","summary":"AU Warranty scope updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-10-08","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_08672ccdbf915840f9f9f5e74934fb1cf83d2c2cc2d60dc5bfa6e7c1cd79484c"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_changed","field_path":"audit_rows.Thermal load management.evidence_status","field_label":"Thermal load management: Evidence status","before":"reviewed_absence","after":"sourced","summary":"Thermal load management: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95"],"event_id":"chg_f8b9f6ad24b08ecebd2d193dfda894d58350a2f502c126665089b4bc637e705a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"name_rating","field_label":"Name Rating","before":"Very Good","after":"Superior","summary":"Name Rating updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_df42a4fafe32524704d0018093ee378eed285c802d4381712b29ecbc8cd7ed3d"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_changed","field_path":"audit_rows.Thermal load management.value","field_label":"Thermal load management","before":"No thermal load integration","after":"Smart relay switching (excess solar triggered)","summary":"Thermal load management updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95"],"event_id":"chg_d90f4fa52c36684952ac487baa92c0ef898c79ea95a321297e40433b55de596f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"buyer_boundary.title","field_label":"Title","before":"Optional solar-surplus heating control","after":"Optional solar-surplus heating and EV charging","summary":"Title updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d623d81e97c7ce8bfdd4cd5dbd76133d44521c1112dd1bf7b946ca4f9ea88b3b"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_added","field_path":"buyer_boundary.title","field_label":"Title","before":null,"after":"Optional solar-surplus heating control","summary":"Title updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_cd11a10598e279a06e0acdea4c10359d3f3ef64bcaf04d6acb56926c900d9b90"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"buyer_boundary.source_urls","field_label":"Evidence sources","before":["https://manuals.fronius.com/HTML/4204260307/en-US.html","https://manuals.fronius.com/html/4204260538/en-US.html","https://www.fronius.com/en/help-center/solar-energy/solar-powered-water-heating/support-ohmpilot","https://www.fronius.com/~/downloads/Solar%20Energy/Solution%20Sheets/SE_SOLS_Fronius_Thermal_Solution_EN.pdf"],"after":["https://manuals.fronius.com/HTML/4204260307/en-US.html","https://manuals.fronius.com/html/4204260435/en-US.html","https://manuals.fronius.com/html/4204260538/en-US.html","https://www.fronius.com/en/help-center/solar-energy/e-mobility/support-wattpilot","https://www.fronius.com/en/help-center/solar-energy/solar-powered-water-heating/support-ohmpilot","https://www.fronius.com/~/downloads/Solar%20Energy/Application%20Guides/SE_APG_Energy_management_Wattpilot_EN.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Solution%20Sheets/SE_SOLS_Fronius_Thermal_Solution_EN.pdf"],"summary":"Evidence sources updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_b7367e0c4df8ede3867e22c06960c5a0e910cc1d335731e7bee62c768c60fb13"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"pillars.Energy Ecosystem.score_precise","field_label":"Energy Ecosystem pillar score","before":67.9,"after":76,"summary":"Energy Ecosystem pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_92880a1bac54e44f616fecf07e5299bfeb4bd96de260af52ce788aff36a15774"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_370f2af542bd4afb3ec25ad90b9110c656fc301b9e13eb51493466aefc48a13b","event_type":"field_changed","field_path":"audit_rows.Semiconductor technology.source_urls","field_label":"Semiconductor technology: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_IS_Technical_document_for_Planning_IT.PDF","https://www.fronius.com/~/downloads/Solar%20Energy/Whitepaper/SE_WP_LCA_Tauro_EN.pdf"],"summary":"Semiconductor technology: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_8582bebc38fbb8fc7686b4de18d72de60b60df858b27200fa0ed0d520abbe29f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged. Thermal-control evidence integration 2026-10-05: Tauro/Tauro Eco manual 040-28082026, Ohmpilot manual 019-24112025 and thermal solution EN v05 Sep 2023; exact 100-3-D optional-accessory boundaries. Regional approval and verification dates unchanged.","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged. Thermal-control evidence integration 2026-10-05: Tauro/Tauro Eco manual 040-28082026, Ohmpilot manual 019-24112025 and thermal solution EN v05 Sep 2023; exact 100-3-D optional-accessory boundaries. Regional approval and verification dates unchanged. EV accessory evidence integration 2026-10-05: Wattpilot2.0 manual019-19082026 Suitable inverters/PV surplus, energy-management guideVersion01/25 PDF4/14 and exact Tauro/Eco Solar API boundary; existing thermal conditions retained.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_7c9ad8e3b03178c62ea6fa5e0d5b5fc22045b7e23ee17ff8eea71b01e216fc6d"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_370f2af542bd4afb3ec25ad90b9110c656fc301b9e13eb51493466aefc48a13b","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":74.8,"after":75.2,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_6ffe44dcf79360252df24aa012e02f9bf57a0c14f3efe8d30a700633399dfb2b"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":73.2,"after":73.9,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_58dce183685256704f59f19a2a163c769a496e439fc640abe190135c9ca64444"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"audit_rows.EV charging integration.value","field_label":"EV charging integration","before":"No EV integration","after":"Smart OCPP EV charging (solar surplus tracking)","summary":"EV charging integration updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02"],"event_id":"chg_572fa001345e10767716c4a2cc6c21ec05a004a902bfbe11b9e9481f0c96edd5"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_370f2af542bd4afb3ec25ad90b9110c656fc301b9e13eb51493466aefc48a13b","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged. Thermal-control evidence integration 2026-10-05: Tauro/Tauro Eco manual 040-28082026, Ohmpilot manual 019-24112025 and thermal solution EN v05 Sep 2023; exact 100-3-D optional-accessory boundaries. Regional approval and verification dates unchanged. EV accessory evidence integration 2026-10-05: Wattpilot2.0 manual019-19082026 Suitable inverters/PV surplus, energy-management guideVersion01/25 PDF4/14 and exact Tauro/Eco Solar API boundary; existing thermal conditions retained.","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged. Thermal-control evidence integration 2026-10-05: Tauro/Tauro Eco manual 040-28082026, Ohmpilot manual 019-24112025 and thermal solution EN v05 Sep 2023; exact 100-3-D optional-accessory boundaries. Regional approval and verification dates unchanged. EV accessory evidence integration 2026-10-05: Wattpilot2.0 manual019-19082026 Suitable inverters/PV surplus, energy-management guideVersion01/25 PDF4/14 and exact Tauro/Eco Solar API boundary; existing thermal conditions retained. Semiconductor disclosure integrated 2026-10-05: Fronius Capitolato Prodotti 2026 PDF51 exact Tauro ECO 100-3-D IGBT bridge, corroborated by Tauro ECO 100-D LCA PDF17. PDF authoring metadata is not a published issue date. All other technical values,100kW benchmark,market approvals/warranty and verification dates retained.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_57181afb4e63b9eb4396bf77122efec1f137b39aaa1193687cfb2a78125e697f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_changed","field_path":"audit_rows.Thermal load management.source_urls","field_label":"Thermal load management: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://manuals.fronius.com/HTML/4204260307/en-US.html","https://manuals.fronius.com/html/4204260538/en-US.html","https://www.fronius.com/en/help-center/solar-energy/solar-powered-water-heating/support-ohmpilot","https://www.fronius.com/~/downloads/Solar%20Energy/Solution%20Sheets/SE_SOLS_Fronius_Thermal_Solution_EN.pdf"],"summary":"Thermal load management: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95"],"event_id":"chg_50074764ee0b6270325b1bede10c1be1179a9d0705f88246594467f09ccbda88"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_added","field_path":"buyer_boundary.summary","field_label":"Summary","before":null,"after":"Tauro ECO 100-3-D can control heating through an optional Fronius Ohmpilot and Fronius Smart Meter. Heat-pump switching requires installer configuration, a compatible SG Ready or utility-release input and the same utility meter. Configurable surplus thresholds control the accessory relay; this does not establish a native inverter heat-pump port or compressor-speed modulation. The Ohmpilot’s separate 0-9 kW modulation applies to compatible resistive heating rods. Meter readings and communication must remain reliable; minimum-temperature or legionella-prevention settings can draw grid electricity. Ohmpilot firmware updates require Solar.web; the reviewed sources do not establish a minimum compatible firmware version. This function does not establish renewal of the recorded Australian approval.","summary":"Summary updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4e32e30ab5523feb4bdc9e067a4aa4da21676d97355247cc0f13e616bea3b8cd"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged.","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged. Thermal-control evidence integration 2026-10-05: Tauro/Tauro Eco manual 040-28082026, Ohmpilot manual 019-24112025 and thermal solution EN v05 Sep 2023; exact 100-3-D optional-accessory boundaries. Regional approval and verification dates unchanged.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4a07ccf438730b5266a064767a0dff898ce2f93708755973b6061fa0a50684db"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"rating","field_label":"Rating","before":"Very good","after":"Superior","summary":"Rating updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4489e4dd0c958094d6523b2ab2184479a285777a74d8a5d186f8b05274b9ec47"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_370f2af542bd4afb3ec25ad90b9110c656fc301b9e13eb51493466aefc48a13b","event_type":"field_changed","field_path":"audit_rows.Semiconductor technology.value","field_label":"Semiconductor technology","before":"Not disclosed","after":"IGBT / MOSFET (standard silicon)","summary":"Semiconductor technology updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_40a7b51eedc6019c17dc3c13a46ff1dc3f5a6582d52023d979e71d4bfc89ff11"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"audit_rows.EV charging integration.source_urls","field_label":"EV charging integration: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://manuals.fronius.com/HTML/4204260307/en-US.html","https://manuals.fronius.com/html/4204260435/en-US.html","https://www.fronius.com/en/help-center/solar-energy/e-mobility/support-wattpilot","https://www.fronius.com/~/downloads/Solar%20Energy/Application%20Guides/SE_APG_Energy_management_Wattpilot_EN.pdf"],"summary":"EV charging integration: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02"],"event_id":"chg_3d936fb8ddad46afbf4bc05ffc4191c7b5ce8f3227c009dfaea591286dedf47e"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_370f2af542bd4afb3ec25ad90b9110c656fc301b9e13eb51493466aefc48a13b","event_type":"field_changed","field_path":"pillars.Efficiency.score_precise","field_label":"Efficiency pillar score","before":77.5,"after":79.8,"summary":"Efficiency pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_3cb3f9337591147e509e44de7ea523a59ab6b83d04aad629e9c04c659963e312"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":73.9,"after":74.8,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_397b37d0fc924c137d6d1ef0f32e859ff15176c5c17392cb93efb957964fbd5e"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_added","field_path":"buyer_boundary.source_urls","field_label":"Evidence sources","before":null,"after":["https://manuals.fronius.com/HTML/4204260307/en-US.html","https://manuals.fronius.com/html/4204260538/en-US.html","https://www.fronius.com/en/help-center/solar-energy/solar-powered-water-heating/support-ohmpilot","https://www.fronius.com/~/downloads/Solar%20Energy/Solution%20Sheets/SE_SOLS_Fronius_Thermal_Solution_EN.pdf"],"summary":"Evidence sources updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_3010e310c3ed30575bd888fed46bb9c916ed7cd1fdb957288bc6a49ec5e99bc5"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_370f2af542bd4afb3ec25ad90b9110c656fc301b9e13eb51493466aefc48a13b","event_type":"field_changed","field_path":"audit_rows.Semiconductor technology.evidence_status","field_label":"Semiconductor technology: Evidence status","before":"reviewed_absence","after":"sourced","summary":"Semiconductor technology: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_2f3bfce25ab82e34a5a8aff011d454613a823242e6dfd8c701911fb51390b63d"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"buyer_boundary.summary","field_label":"Summary","before":"Tauro ECO 100-3-D can control heating through an optional Fronius Ohmpilot and Fronius Smart Meter. Heat-pump switching requires installer configuration, a compatible SG Ready or utility-release input and the same utility meter. Configurable surplus thresholds control the accessory relay; this does not establish a native inverter heat-pump port or compressor-speed modulation. The Ohmpilot’s separate 0-9 kW modulation applies to compatible resistive heating rods. Meter readings and communication must remain reliable; minimum-temperature or legionella-prevention settings can draw grid electricity. Ohmpilot firmware updates require Solar.web; the reviewed sources do not establish a minimum compatible firmware version. This function does not establish renewal of the recorded Australian approval.","after":"Tauro ECO 100-3-D can control heating through an optional Fronius Ohmpilot and Fronius Smart Meter. Heat-pump switching requires installer configuration, a compatible SG Ready or utility-release input and the same utility meter. Configurable surplus thresholds control the accessory relay; this does not establish a native inverter heat-pump port or compressor-speed modulation. The Ohmpilot’s separate 0-9 kW modulation applies to compatible resistive heating rods. Meter readings and communication must remain reliable; minimum-temperature or legionella-prevention settings can draw grid electricity. Ohmpilot firmware updates require Solar.web; the reviewed sources do not establish a minimum compatible firmware version. This function does not establish renewal of the recorded Australian approval. Optional Fronius Wattpilot adds OCPP 1.6J solar-surplus EV charging with a Smart Meter at the feed-in point, a shared network and installer/app configuration. PV optimisation works for one Wattpilot at a time; vehicle charging limits and settings can require grid energy. Fronius advises against running digital-I/O load management alongside Wattpilot because those loads cannot be prioritised. The reviewed charging capability does not include vehicle-to-home or vehicle-to-grid discharge. For Wattpilot data in Solar.web, both devices must be online and paired, with Wattpilot firmware 36.0 or later and inverter firmware 1.30 or later; those display requirements do not establish the minimum firmware for surplus charging.","summary":"Summary updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_2cff1d2de4a3f0ed1f4a9318f2631085c0b09ca4eeb06b47d39cd9189cb6e50d"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_08bb8536cc58cfb119a7652eef75ea740a6176528b85b450d27ec42dbecc5e31","event_type":"field_changed","field_path":"audit_rows.EV charging integration.evidence_status","field_label":"EV charging integration: Evidence status","before":"reviewed_absence","after":"sourced","summary":"EV charging integration: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02"],"event_id":"chg_183891deeaa753b4dbe037a34f45d6a15c2ccfaff756c3a92606b3b915f38c43"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_2e06498a8b6e7c4a2544ed5cd90e8ac8ba777ba05f47071ceecb305fe7a64720","event_type":"field_changed","field_path":"pillars.Energy Ecosystem.score_precise","field_label":"Energy Ecosystem pillar score","before":62.5,"after":67.9,"summary":"Energy Ecosystem pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-10-05","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_11f59a0b4a02a399e138398f0a311b62e9c6650ad9380b1b74e000d658f21293"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.status","field_label":"US Status","before":null,"after":"unavailable","summary":"US Status updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_e93f88a1a6842efd4a20db660a3dcf4d97649f8e079f26629ebffa301869a276"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.warranty_scope","field_label":"DE Warranty scope","before":null,"after":"Germany; country group 1. Inverters 50 kW and above receive 5 years of Warranty Plus. The scored Tauro ECO 100-3-D is in that band. Solar.web registration within 30 months of factory delivery is required.","summary":"DE Warranty scope updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_e04cbafdba38d8743df1e2aec198a05a188761f01d1c229c958d541b3c8969dc"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.status","field_label":"DE Status","before":null,"after":"available","summary":"DE Status updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_b08a5a18d27a22580d8fb506423d822afa65104eb96609b76df4bd1ac422b021"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.support_note","field_label":"US Support Note","before":null,"after":"Fronius USA's inverter technical-data catalogue lists Primo GEN24 208-240, Primo UL, Symo and Symo Advanced. It does not list Tauro ECO 100-3-D. The US catalogue has no Tauro family. The exact US technical-data URL returns 404. The US GEN24 UL marketing page is the 208-240 family, which is a separate record.","summary":"US Support Note updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_79d614b166d6ae9a45b3e79adc3a07d66c534ae79918c21a5807b1a0fefb8b98"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.certifications","field_label":"US Certifications","before":null,"after":[],"summary":"US Certifications updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_5e2fbac34c2f6d02a4d88cb357a83a635a8fc18ac21e71572a758498f31838d7"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.certifications","field_label":"DE Certifications","before":null,"after":["The German Tauro ECO 100-3-D technical-data page publishes VDE-AR-N 4105, VDE-AR-N 4110, VDE 0126-1-1 covering Tauro Eco 50-3-P through 100-3-D, EN 50549-2 and IEC 62109 certificates."],"summary":"DE Certifications updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_4db148a3a9a602e4dce2b8f253a0057e34582461488e77cc394dc6d57cf50ff7"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23.","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_3e4f072a20f25b607dc8a13e5b14711fd6f7ca8780e70a51bf3c71b189d99251"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.warranty_terms","field_label":"DE Warranty conditions","before":null,"after":{"labour":"Approved removal and replacement labour is covered during the Warranty Plus period when Fronius or a Fronius-commissioned installer performs the work.","registration":"Inverters must be registered on Solar.web within 30 months of factory delivery. Unauthorised repairs are not covered.","remedy":"Fronius provides the required spare part or an equivalent replacement, or reimburses market value, under the governing terms.","removal_reinstallation":"Approved component removal and replacement are covered during the Warranty Plus period. Work on other site equipment is excluded.","transferability":"Remaining claim rights transfer with ownership of the covered inverter. The term is not extended by the transfer.","transport":"Standard national shipping to the Fronius repair centre, and return of the spare or replacement, is covered during the Warranty Plus period. Express, air and sea freight are excluded."},"summary":"DE Warranty conditions updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_34864e0ecd5ee36e8a14e72b39b014b781b20a19cb210810da78cd13af466db9"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.support_note","field_label":"DE Support Note","before":null,"after":"Fronius Germany's technical-data catalogue names Tauro ECO 100-3-D. Tauro 50-3-P and Tauro Eco 100-3-P are different wiring identities and are not transferred onto this Direct record.","summary":"DE Support Note updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_31a85ded1bdac1a13739d3078d77223f4fa53789223078e7b7df0a7572291294"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.source_urls","field_label":"US Evidence sources","before":null,"after":["https://www.fronius.com/en-us/usa/solar-energy/installers-partners/products-solutions/inverters-and-energy-solutions/gen24-ul-inverter-with-flexible-backup-power","https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters","https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-primo-gen24/primo-gen24-3-8-208-240"],"summary":"US Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_1eb6205d404c0e662e2ce9b997e30885057982c50491c0009cf97c431f50fd5b"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.grid_compatibility","field_label":"DE Grid and installation context","before":null,"after":"Three-phase 100 kW Direct-wiring commercial inverter with exact German VDE-AR-N 4105 / 4110 evidence naming Tauro Eco 100-3-D. Connection approval remains installation-specific.","summary":"DE Grid and installation context updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_1cf7fce02b0511ed3bf60954c74e546d05ec8a14d9824727f1a4a3c508dd7d30"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.source_urls","field_label":"DE Evidence sources","before":null,"after":["https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE-AR-N_4105_2018_Fronius_Tauro_and_Tauro_Eco_DE_EN.pdf","https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE_0126-1-1_2006_2012_Fronius_Tauro_Eco_50-3-P_-_100-3-D_DE_EN.pdf","https://downloads.fronius.com/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_DE.pdf","https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter","https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter/fronius-tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_DE.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf"],"summary":"DE Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_19523844d41e6e769483fba8719e890c6c272d75575d4d85b1d3728c35a20086"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.state","field_label":"State","before":null,"after":"supported","summary":"State updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_b0e69f796407cca86fe92c3f9a51ec51ab27cb21cd1d91514a73e89cf91c4ccd"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.confidence","field_label":"Confidence","before":null,"after":"high","summary":"Confidence updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4caa93854c71207dc6d467f60fca8ee6f177aaadae0ebb703f9c90bc815d5a14"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.source_urls","field_label":"Evidence sources","before":null,"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Evidence sources updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4c2929f77ebfce56921846bbc4fd3b2e7946d8a5e6396ebecbbd0f2950c01622"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.value","field_label":"Value","before":null,"after":"Direct-pv string inverter with 1 independent MPPT at the scored model boundary.","summary":"Value updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_3232ff856a512593b907ac7d83f6046d3a19fb90d0870173e970dc730bde9d98"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Peak efficiency (%).source_urls","field_label":"Peak efficiency (%): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Peak efficiency (%): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_facb9a4c6032b8cfc0df04d37a401b624481b59cf479464d2ca4409afa0ef2a2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_removed","field_path":"audit_rows.Financial strength & warranty backing.value","field_label":"Financial strength & warranty backing","before":"Stable / listed","after":null,"summary":"Financial strength & warranty backing updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_faa3a5ddddc07b61b1bd647289ac888309ba38d08368a18e8c66d0ede671e8fb"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Financial strength & warranty backing.value","field_label":"Financial strength & warranty backing","before":"Financially strong (profitable / strong parent)","after":"Stable / listed","summary":"Financial strength & warranty backing updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_f848287e231cb628eedf459711fbb0c46ee661edb3679441cad4eea318097072"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Guarantee & Backbone.score_precise","field_label":"Guarantee & Backbone pillar score","before":85,"after":79,"summary":"Guarantee & Backbone pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_f7dc9f666ef2ddd0e60d987d7f032ac889d9f753305bb0633cbb72304c0e512a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.ranges","field_label":"Ranges","before":[{"checked":"2026-06-20","market":"global","max":100,"min":100,"range_label":"100 kW","source_revision":"Live source; revision not stated","source_url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems","unit":"kW"}],"after":[{"checked":"2026-08-23","market":"global","max":100,"min":100,"range_label":"100 kW","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","unit":"kW"}],"summary":"Ranges updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_e62cd42c19d4952f5aec8d2ec51be37e758c5a190a5d029ad1b617c577df7ba7"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.source","field_label":"Source","before":{"checked":"2026-06-20","source_revision":"Live source; revision not stated","source_url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems"},"after":{"checked":"2026-08-23","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"},"summary":"Source updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_dc5fd4c8ceb9b96fb74254aa3a8266b579ed1208149a846024e548f8eba7f612"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Financial strength & warranty backing.source_urls","field_label":"Financial strength & warranty backing: Evidence sources","before":[],"after":["https://www.fronius.com/en/about-us/history","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Financial strength & warranty backing: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_dbd5cf147a9cb80e1633771119998417a3f4dd0c0bfa3a7e4677da065c89f547"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Backup / islanding.source_urls","field_label":"Backup / islanding: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Backup / islanding: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d773ede345b46eaa4a6a05a6d0c49799e34c7ee1f38134b53aae88e24849f019"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Firmware & security disclosure.source_urls","field_label":"Firmware & security disclosure: Evidence sources","before":["https://www.fronius.com/en-gb/uk/cybersecurity-fronius"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Firmware & security disclosure: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_9bc692e85bf9b1d8112bc991c9e70a1a8f210724b5e68235b92d09e01a9fd3b5","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d4f263ab94326e6ad4dfaefaac223f9fdc42f1b1779ccd9b4eba9a59df3ba083"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Shutdown / arc safety.source_urls","field_label":"Shutdown / arc safety: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Shutdown / arc safety: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d4df40e0c591c3353cc5c5f635a26b7e7324497d51f8dabf95eec641226d4b8a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Open protocol & API maturity.source_urls","field_label":"Open protocol & API maturity: Evidence sources","before":["https://manuals.fronius.com/html/4204260307","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Open protocol & API maturity: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_d2c909cf28e7703126cb502fe65e09a84912a907b4c5be0390c00f2a6632e6b2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Weighted efficiency (CEC/Euro %).source_urls","field_label":"Weighted efficiency (CEC/Euro %): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Weighted efficiency (CEC/Euro %): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_d1d8aba81b4b81676f32ad975f87f95129acf3f6c22df45f35350e0ddb5a8151"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Thermal load management.source_urls","field_label":"Thermal load management: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Thermal load management: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_c56976aefec611fcb42e8487046315a5b4cef1bed2d2dbf66c9e5bf002926cc1"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.EV charging integration.source_urls","field_label":"EV charging integration: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"EV charging integration: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_b86fcd49de0b121c57ae9aa67b535dbce4ac326cbd6d470d2de7206fb079d2d2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Hybrid / battery capability.source_urls","field_label":"Hybrid / battery capability: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Hybrid / battery capability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_b1c7deb9c41adf95ac857b92fed59581d040238ba996182bce7c67bd6248eaa8"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Manufacturing track record.source_urls","field_label":"Manufacturing track record: Evidence sources","before":[],"after":["https://www.fronius.com/en/about-us/history","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Manufacturing track record: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_ae4cf264e5812370e0e571ffbe304569fd78158fad639c5d4369401fde9b479f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Number of MPPTs.source_urls","field_label":"Number of MPPTs: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Number of MPPTs: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_acadcacbbb9bdf9f9427f4a955ff791cabb39df1f5d7fd402e8aa320e5baf618"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Operating temperature range.source_urls","field_label":"Operating temperature range: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Operating temperature range: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_ac497f08e302d78f1424240e98f88f8803a4237ad49e01c40866c270e353d598"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":74.9,"after":74.1,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_ab7e77082656ce3c1c699a8f1f6f2dccb33ec1dc94c0fa546541f9fc341a466f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Thermal management.source_urls","field_label":"Thermal management: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Thermal management: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_aaaf5d6bd37ce387db7ca2f8253855c0087e4c84459ae9f20573de9ce4190d37"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_added","field_path":"market.AU.warranty_terms","field_label":"AU Warranty conditions","before":null,"after":{"labour":"Warranty Plus includes servicing by the authorised service pathway; owner-selected work is not an unrestricted entitlement.","registration":"Solar.web registration is required. For inverters commissioned on or after 1 June 2026, registration is required for the free ten-year Warranty Plus offer.","remedy":"Registered Warranty Plus covers replacement materials and servicing under the governing certificate and claim process.","removal_reinstallation":"No unrestricted project-wide removal and reinstallation entitlement is stated.","transferability":"An automatic later-owner transfer entitlement is not stated on the reviewed Australian warranty summary.","transport":"Australian transport is included under Warranty Plus, subject to the governing terms."},"summary":"AU Warranty conditions updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_a75972503ed279a7a3f4d8bdbb003855b2ebec3840b449396b054f9ee6a3eedd"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Ingress protection.source_urls","field_label":"Ingress protection: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Ingress protection: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_a62d77f3a78fdb59363049c78e7e85b7b0025844a468ea2fd796c81bfd678179"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Grid & safety certification.source_urls","field_label":"Grid & safety certification: Evidence sources","before":["https://www.fronius.com/en/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Grid & safety certification: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_b64acea120fdfee9977649aa4edd2b1eb9d835570dc38c91b7fd9b7330cbcc5b","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_9c1d18ae174c2c3937206075ffa8d94c934ca9a6625b7839c76c7175011e3aa1"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Surge protection.source_urls","field_label":"Surge protection: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Surge protection: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_9bebb983e53e6e3f48aa67571265249247494a3d67d0f262569328de9c98d359"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_changed","field_path":"pillars.Guarantee & Backbone.score_precise","field_label":"Guarantee & Backbone pillar score","before":79,"after":73,"summary":"Guarantee & Backbone pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_99d690e8eae98c6393402a085a243efcd09a37bed072a99b8cabde7861d69f8e"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Monitoring & smart features.source_urls","field_label":"Monitoring & smart features: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Monitoring & smart features: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_95886861643aa183632c12894e8b386ff03170236dca6d6e7a9a34d72df5bbf1"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty assurance.source_urls","field_label":"Warranty assurance: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Warranty assurance: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_7abce60470137a604c32826c6947679133f870baf0ee211bfe28a7327c6b6493"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Max DC:AC oversizing ratio.source_urls","field_label":"Max DC:AC oversizing ratio: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Max DC:AC oversizing ratio: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_74eb60724977fafa61021fb91b9295701956a529183144c1461cff56f0990f4d"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":74.1,"after":73.2,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_70c454de4385bccc7939717b2d318b0d8931d4f4b1d782230c13d0e1c2e7030e"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Smart home & IoT depth.source_urls","field_label":"Smart home & IoT depth: Evidence sources","before":["https://manuals.fronius.com/html/4204260307","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Smart home & IoT depth: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_6e8a37713f05ac79de02ce3451fe3584763884027e4fe6ef239050c0dc7b4d2a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Reactive power range.source_urls","field_label":"Reactive power range: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Reactive power range: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_601c8925f6356fe6dede72f12cdf505a1a74e7e3d22e1ca29e23fe61680927bc"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_removed","field_path":"audit_rows.Financial strength & warranty backing.source_urls","field_label":"Financial strength & warranty backing: Evidence sources","before":["https://www.fronius.com/en/about-us/history","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":null,"summary":"Financial strength & warranty backing: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_5f26cb3b7b0bf48e0fd367db8b5563ab1efd9278ef997dfce6f1e650332b64f0"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Live exact-model technical page checked 2026-08-06; current AU warranty model checked 2026-08-06; CER export data as at 2026-07-29","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_5bd9edd7416507f5780f4df4e3b309efcd5604247c52bcbf8b20f3c7d9edf0b2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_removed","field_path":"audit_rows.Financial strength & warranty backing.evidence_status","field_label":"Financial strength & warranty backing: Evidence status","before":"sourced","after":null,"summary":"Financial strength & warranty backing: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_58aaac7d0d7256d33f6cacc5f73f76af458723a2b5b5f8320b8ef9748e206d5c"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Semiconductor technology.source_urls","field_label":"Semiconductor technology: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Semiconductor technology: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_468e1e0418d42974eb11d9bb7149f1c76d43a721c6e982f83285ec8332c3557a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://cer.gov.au/document/cec-approved-inverters","https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://cer.gov.au/document/cec-approved-inverters","https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_3ec8f530cb12f03f3152c737f2e28b94c0b6ba876ea0d7cad0f8586719be12a4"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Max input current per MPPT (A).source_urls","field_label":"Max input current per MPPT (A): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Max input current per MPPT (A): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_08d6a19ab819c538775d0d05eed0ffcfefbeea8ad8b234a0ddd6d2e35088b574"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.VPP & grid services readiness.source_urls","field_label":"VPP & grid services readiness: Evidence sources","before":["https://manuals.fronius.com/html/4204260307","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"VPP & grid services readiness: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_07013d10659528beb62b3632c5209a2516ef43ece130e6bffe5c97fde01fd5b8"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Night standby consumption (W).source_urls","field_label":"Night standby consumption (W): Evidence sources","before":["https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Night standby consumption (W): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_06be43bf6958f599a620b972d2acd2cb85820046910cdd7e04f7cfc4d2f44b62"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty period (yrs).source_urls","field_label":"Warranty period (yrs): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Warranty period (yrs): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_041259a8e9cc1a678f69148b148df0485caf41cb7ac07dcee86a84a1feedf4e3"}],"sources":[{"id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","label":"Peak efficiency (%)","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31"},"content_fingerprint":null,"retrieval":null},{"id":"src_5e0f19e3c428e1f85ed93efc27fb05418350a83b5cfa8e63523aabb90a974f7a","url":"https://cer.gov.au/document/cec-approved-inverters-0","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"5e0f19e3c428e1f85ed93efc27fb05418350a83b5cfa8e63523aabb90a974f7a"},"content_fingerprint":null,"retrieval":null},{"id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"},"content_fingerprint":null,"retrieval":null},{"id":"src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","url":"https://cer.gov.au/document/cec-approved-inverters","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773"},"content_fingerprint":null,"retrieval":null},{"id":"src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN_AUS.pdf","label":"AU market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4"},"content_fingerprint":null,"retrieval":null},{"id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","label":"Warranty period (yrs)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb"},"content_fingerprint":{"kind":"content_sha256","sha256":"c0953caf9eb189bed556790a1b939545ee72d4990c9436c3d6004bc5b3559d4c","scope":"retrieved_document_body","checked_at":"2026-09-09T11:03:14.539Z"},"retrieval":{"checked_at":"2026-09-09T11:03:14.539Z","status":200,"ok":true,"access_restricted":false,"final_url":"https://www.fronius.com/en/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","content_type":"application/octet-stream","note":null}},{"id":"src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-d","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2"},"content_fingerprint":null,"retrieval":null},{"id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","label":"Warranty period (yrs)","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88"},"content_fingerprint":null,"retrieval":null},{"id":"src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e","url":"https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"},"content_fingerprint":null,"retrieval":null},{"id":"src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","url":"https://manuals.fronius.com/HTML/4204260307/en-US.html","label":"Thermal management","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95"},"content_fingerprint":null,"retrieval":null},{"id":"src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Solution%20Sheets/SE_SOLS_Fronius_Thermal_Solution_EN.pdf","label":"Thermal load management","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed"},"content_fingerprint":null,"retrieval":null},{"id":"src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","url":"https://www.fronius.com/en/help-center/solar-energy/solar-powered-water-heating/support-ohmpilot","label":"Thermal load management","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5"},"content_fingerprint":null,"retrieval":null},{"id":"src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","url":"https://manuals.fronius.com/html/4204260538/en-US.html","label":"Thermal load management","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d"},"content_fingerprint":null,"retrieval":null},{"id":"src_52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Whitepaper/SE_WP_LCA_Tauro_EN.pdf","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e"},"content_fingerprint":null,"retrieval":null},{"id":"src_c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_IS_Technical_document_for_Planning_IT.PDF","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a"},"content_fingerprint":null,"retrieval":null},{"id":"src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","url":"https://manuals.fronius.com/html/4204260435/en-US.html","label":"EV charging integration","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413"},"content_fingerprint":null,"retrieval":null},{"id":"src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Application%20Guides/SE_APG_Energy_management_Wattpilot_EN.pdf","label":"EV charging integration","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0"},"content_fingerprint":null,"retrieval":null},{"id":"src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02","url":"https://www.fronius.com/en/help-center/solar-energy/e-mobility/support-wattpilot","label":"EV charging integration","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02"},"content_fingerprint":null,"retrieval":null},{"id":"src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff"},"content_fingerprint":null,"retrieval":null},{"id":"src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-primo-gen24/primo-gen24-3-8-208-240","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9"},"content_fingerprint":null,"retrieval":null},{"id":"src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/products-solutions/inverters-and-energy-solutions/gen24-ul-inverter-with-flexible-backup-power","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"},"content_fingerprint":null,"retrieval":null},{"id":"src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE_0126-1-1_2006_2012_Fronius_Tauro_Eco_50-3-P_-_100-3-D_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a"},"content_fingerprint":null,"retrieval":null},{"id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE-AR-N_4105_2018_Fronius_Tauro_and_Tauro_Eco_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e"},"content_fingerprint":null,"retrieval":null},{"id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter/fronius-tauro-eco/tauro-eco-100-3-d","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288"},"content_fingerprint":null,"retrieval":null},{"id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","url":"https://downloads.fronius.com/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042"},"content_fingerprint":null,"retrieval":null},{"id":"src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4"},"content_fingerprint":null,"retrieval":null},{"id":"src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"},"content_fingerprint":null,"retrieval":null},{"id":"src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p","label":"Peak efficiency (%)","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"},"content_fingerprint":null,"retrieval":null},{"id":"src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41","url":"https://www.fronius.com/en/about-us/history","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"},"content_fingerprint":null,"retrieval":null},{"id":"src_a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems","label":"Benchmark source","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b"},"content_fingerprint":null,"retrieval":null},{"id":"src_9bc692e85bf9b1d8112bc991c9e70a1a8f210724b5e68235b92d09e01a9fd3b5","url":"https://www.fronius.com/en-gb/uk/cybersecurity-fronius","label":"Firmware and security evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9bc692e85bf9b1d8112bc991c9e70a1a8f210724b5e68235b92d09e01a9fd3b5"},"content_fingerprint":null,"retrieval":null},{"id":"src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","url":"https://manuals.fronius.com/html/4204260307","label":"Open protocol & API maturity","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee"},"content_fingerprint":null,"retrieval":null},{"id":"src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f"},"content_fingerprint":null,"retrieval":null},{"id":"src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43","url":"https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"},"content_fingerprint":null,"retrieval":null},{"id":"src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models","label":"Warranty period (yrs)","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0"},"content_fingerprint":null,"retrieval":{"checked_at":"2026-09-09T11:03:14.539Z","status":200,"ok":true,"access_restricted":false,"final_url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models","content_type":"text/html; charset=utf-8","note":"Reachability only; dynamic web page is not content-fingerprinted"}},{"id":"src_b64acea120fdfee9977649aa4edd2b1eb9d835570dc38c91b7fd9b7330cbcc5b","url":"https://www.fronius.com/en/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN.pdf","label":"Grid & safety certification","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b64acea120fdfee9977649aa4edd2b1eb9d835570dc38c91b7fd9b7330cbcc5b"},"content_fingerprint":null,"retrieval":null}]},"approval_history":[],"sources":[{"id":"src_0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Solution%20Sheets/SE_SOLS_Fronius_Thermal_Solution_EN.pdf","label":"Thermal load management","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"0c8e1c21c7f504be6f035f832ab6c08cc744007968a60795b23be49869e72eed"},"content_fingerprint":null,"retrieval":null},{"id":"src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff"},"content_fingerprint":null,"retrieval":null},{"id":"src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","url":"https://cer.gov.au/document/cec-approved-inverters","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773"},"content_fingerprint":null,"retrieval":null},{"id":"src_42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413","url":"https://manuals.fronius.com/html/4204260435/en-US.html","label":"EV charging integration","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"42e4adfc46b889346cae2c478801247dd9b153deb0b5ca682bdd5e87f36d1413"},"content_fingerprint":null,"retrieval":null},{"id":"src_52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Whitepaper/SE_WP_LCA_Tauro_EN.pdf","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"52ffec9382d0f19e4387fa94144d500bb3f17c0795cc0fb368623b4b682e913e"},"content_fingerprint":null,"retrieval":null},{"id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","label":"Peak efficiency (%)","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31"},"content_fingerprint":null,"retrieval":null},{"id":"src_570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN_AUS.pdf","label":"AU market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"570dbd2fda1e664bdc617b47cc99e8fcb9e31e90f3c495c066a0c940aa22a8f4"},"content_fingerprint":null,"retrieval":null},{"id":"src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE_0126-1-1_2006_2012_Fronius_Tauro_Eco_50-3-P_-_100-3-D_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a"},"content_fingerprint":null,"retrieval":null},{"id":"src_5e0f19e3c428e1f85ed93efc27fb05418350a83b5cfa8e63523aabb90a974f7a","url":"https://cer.gov.au/document/cec-approved-inverters-0","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"5e0f19e3c428e1f85ed93efc27fb05418350a83b5cfa8e63523aabb90a974f7a"},"content_fingerprint":null,"retrieval":null},{"id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE-AR-N_4105_2018_Fronius_Tauro_and_Tauro_Eco_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e"},"content_fingerprint":null,"retrieval":null},{"id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","label":"Warranty period (yrs)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb"},"content_fingerprint":{"kind":"content_sha256","sha256":"c0953caf9eb189bed556790a1b939545ee72d4990c9436c3d6004bc5b3559d4c","scope":"retrieved_document_body","checked_at":"2026-09-09T11:03:14.539Z"},"retrieval":{"checked_at":"2026-09-09T11:03:14.539Z","status":200,"ok":true,"access_restricted":false,"final_url":"https://www.fronius.com/en/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","content_type":"application/octet-stream","note":null}},{"id":"src_87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Application%20Guides/SE_APG_Energy_management_Wattpilot_EN.pdf","label":"EV charging integration","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"87cfbafe7dc16b7ad90b19c65ec19108958aaff635a8bba9ac385a7858005ce0"},"content_fingerprint":null,"retrieval":null},{"id":"src_93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-d","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"93b6ee27bfedfc362bc98c9bf3a34ede8a5986549bff1e91027210da0c8467b2"},"content_fingerprint":null,"retrieval":null},{"id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter/fronius-tauro-eco/tauro-eco-100-3-d","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288"},"content_fingerprint":null,"retrieval":null},{"id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","url":"https://downloads.fronius.com/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042"},"content_fingerprint":null,"retrieval":null},{"id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","label":"Warranty period (yrs)","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88"},"content_fingerprint":null,"retrieval":null},{"id":"src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-primo-gen24/primo-gen24-3-8-208-240","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9"},"content_fingerprint":null,"retrieval":null},{"id":"src_aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5","url":"https://www.fronius.com/en/help-center/solar-energy/solar-powered-water-heating/support-ohmpilot","label":"Thermal load management","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"aca3e07672d4ea4dc4073c476a131ecb695a0043ba3f61d2d8a97279254d97c5"},"content_fingerprint":null,"retrieval":null},{"id":"src_c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_IS_Technical_document_for_Planning_IT.PDF","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c62099e7442a08670d04e72861aff22b1650712783498d680048f4891826394a"},"content_fingerprint":null,"retrieval":null},{"id":"src_ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d","url":"https://manuals.fronius.com/html/4204260538/en-US.html","label":"Thermal load management","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ca171e437c98cdc4e1d226aaa6330cbf7545018a1b57404bd0564cc9aaf2085d"},"content_fingerprint":null,"retrieval":null},{"id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"},"content_fingerprint":null,"retrieval":null},{"id":"src_d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95","url":"https://manuals.fronius.com/HTML/4204260307/en-US.html","label":"Thermal management","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d661135acbfadaee798b327d2423116dcf9cf1d39b315f5caff53ae7d30b1c95"},"content_fingerprint":null,"retrieval":null},{"id":"src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4"},"content_fingerprint":null,"retrieval":null},{"id":"src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"},"content_fingerprint":null,"retrieval":null},{"id":"src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e","url":"https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"},"content_fingerprint":null,"retrieval":null},{"id":"src_ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02","url":"https://www.fronius.com/en/help-center/solar-energy/e-mobility/support-wattpilot","label":"EV charging integration","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ee7c2a651bd68d901893fc20509a88db6a74ea9c324a56256a28f290bff7ed02"},"content_fingerprint":null,"retrieval":null},{"id":"src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/products-solutions/inverters-and-energy-solutions/gen24-ul-inverter-with-flexible-backup-power","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"},"content_fingerprint":null,"retrieval":null},{"id":"src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41","url":"https://www.fronius.com/en/about-us/history","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"},"content_fingerprint":null,"retrieval":null}],"boundaries":{"rights":"An unresolved licence field is not permission to cache, redistribute, derive from, or use a source for AI.","history":"Evidence events record verification activity. Change-history events separately record accepted before-and-after publication changes.","change_history":"Events record accepted publication changes, not every evidence re-check or a claim that the product changed on that date.","change_validity":"valid_from and valid_to remain null unless a source establishes when the changed fact applied in the world.","change_scope":"Compatibility, system pairing, suitability and relative leaderboard prose are excluded.","applicability":"Market evidence does not establish stock, system compatibility, network approval, installation suitability, or approval of an earlier installation.","approval_history":"Approval history contains exact, score-neutral source-register links recorded since monitoring began. It is not a complete lifetime history."}}