{"schemaVersion":"1.1.0","subject":{"slug":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","kind":"inverter","brand":"Fronius","name":"Tauro ECO","canonical_name":"Fronius Tauro ECO 100 kW","model":"Tauro ECO 100-3-D (100 kW, three-phase, Direct wiring)","certification_model":null,"certification_identities":[],"benchmark":{"min":100,"max":100,"scored":100,"unit":"kW","metric":"rated AC power","policy":"highest_in_series","review_status":"current","note":"The score is anchored to the highest published rating in this exact series.","range_label":"100 kW","scored_label":"100 kW","market":null,"series_id":"fronius-tauro-eco","series_definition":"Same electrical platform, phase configuration, grid region and enclosure; output-bin changes only.","scored_model":"Tauro ECO 100-3-D (100 kW, three-phase, Direct wiring)","evidence_scope":"exact_model","source":{"source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","checked":"2026-08-23"},"ranges":[{"min":100,"max":100,"unit":"kW","market":"global","range_label":"100 kW","source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","checked":"2026-08-23"}],"supporting_metrics":[]},"score":73,"rubric_version":"3.7.0","url":"https://review.solar/products/fronius-international-gmbh-fronius-tauro-eco-100-3-d"},"envelope":{"version":"1.1.0","subject":{"type":"product","id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","identity_scope":"published_product_record","model":"Tauro ECO 100-3-D (100 kW, three-phase, Direct wiring)","certification_model":null,"certification_identities":[],"benchmark_series_id":"fronius-tauro-eco"},"recorded_at":null,"recorded_at_basis":null,"source_bindings":[{"source_id":"src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Peak efficiency (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Weighted efficiency (CEC/Euro %)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Semiconductor technology"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Night standby consumption (W)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Number of MPPTs"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max DC:AC oversizing ratio"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max input current per MPPT (A)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Surge protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Hybrid / battery capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup / islanding"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Monitoring & smart features"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Reactive power range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Grid & safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Shutdown / arc safety"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Open protocol & API maturity"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.VPP & grid services readiness"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.EV charging integration"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal load management"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Smart home & IoT depth"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"decision_evidence","object_scopes":["decision_evidence"],"field_paths":["decision_evidence.inverter_envelope.items.0"],"jurisdiction":null,"evidence_classes":["supported"],"checked_at":"2026-08-25","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-31","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-31","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-31","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"benchmark_evidence","object_scopes":["exact_model"],"field_paths":["benchmark.source"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"benchmark_range_evidence","object_scopes":["product_series"],"field_paths":["benchmark.ranges.0"],"jurisdiction":"global","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Peak efficiency (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Weighted efficiency (CEC/Euro %)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Semiconductor technology"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Night standby consumption (W)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Number of MPPTs"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max DC:AC oversizing ratio"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Max input current per MPPT (A)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal management"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Ingress protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Operating temperature range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Surge protection"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Hybrid / battery capability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Backup / islanding"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Monitoring & smart features"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Reactive power range"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Grid & safety certification"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Shutdown / arc safety"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Open protocol & API maturity"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.VPP & grid services readiness"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.EV charging integration"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Thermal load management"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Smart home & IoT depth"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Firmware & security disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"decision_evidence","object_scopes":["decision_evidence"],"field_paths":["decision_evidence.inverter_envelope.items.0"],"jurisdiction":null,"evidence_classes":["supported"],"checked_at":"2026-08-25","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","role":"primary_product_source","object_scopes":["exact_product_record"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.DE"],"jurisdiction":"DE","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-23","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-30","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null}],"events":[{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-30","event_type":"product_evidence_checked","summary":"Core scorecard evidence checked","scope":"product_record","jurisdiction":null,"source_ids":[],"event_id":"evt_cae5bd7be2347d6b39e26f58f222b364e2329d61cfd5d3b214905fb03423ddfe"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-30","event_type":"market_evidence_checked","summary":"DE market evidence checked","scope":"market_overlay","jurisdiction":"DE","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"evt_f579c1053c4f257abca790d7d5a8daa96f59e7a0f16819a55d9dcd046bd76824"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-30","event_type":"market_evidence_checked","summary":"US market evidence checked","scope":"market_overlay","jurisdiction":"US","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"evt_62ea7cfd2904e0b03801805c3e5d447d89452a7bbb45957a93ad18f0f7d1af31"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-23","event_type":"market_evidence_checked","summary":"AU market evidence checked","scope":"market_overlay","jurisdiction":"AU","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"evt_f609f3eb49c1c44a943eb0bde3c30f5c9c9fefce9f1232bebbf3488dc27fa825"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","object_id":null,"date":"2026-08-23","event_type":"benchmark_evidence_checked","summary":"Series benchmark evidence checked","scope":"scored_benchmark","jurisdiction":null,"source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"evt_952052f9ad85252c3e7cb116d273479447fb84774c27f227b3deb49a1635b739"}]},"change_history":{"schemaVersion":"1.0.0","baseline":{"dataset_revision":"rel_bcce8c246a65d51663134988c0ee07203ae81007281b5169834d130773e56cf0","product_count":232,"recorded_at":"2026-08-16","recorded_at_basis":"latest_record_date_in_baseline"},"current_release_id":"rel_535c3e7876133979d2316d1462e79e14f1b603ae00fca9017eb31ce577346a73","events":[{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.status","field_label":"US Status","before":null,"after":"unavailable","summary":"US Status updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_e93f88a1a6842efd4a20db660a3dcf4d97649f8e079f26629ebffa301869a276"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.warranty_scope","field_label":"DE Warranty scope","before":null,"after":"Germany; country group 1. Inverters 50 kW and above receive 5 years of Warranty Plus. The scored Tauro ECO 100-3-D is in that band. Solar.web registration within 30 months of factory delivery is required.","summary":"DE Warranty scope updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_e04cbafdba38d8743df1e2aec198a05a188761f01d1c229c958d541b3c8969dc"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.status","field_label":"DE Status","before":null,"after":"available","summary":"DE Status updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_b08a5a18d27a22580d8fb506423d822afa65104eb96609b76df4bd1ac422b021"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.support_note","field_label":"US Support Note","before":null,"after":"Fronius USA's inverter technical-data catalogue lists Primo GEN24 208-240, Primo UL, Symo and Symo Advanced. It does not list Tauro ECO 100-3-D. The US catalogue has no Tauro family. The exact US technical-data URL returns 404. The US GEN24 UL marketing page is the 208-240 family, which is a separate record.","summary":"US Support Note updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_79d614b166d6ae9a45b3e79adc3a07d66c534ae79918c21a5807b1a0fefb8b98"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.certifications","field_label":"US Certifications","before":null,"after":[],"summary":"US Certifications updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_5e2fbac34c2f6d02a4d88cb357a83a635a8fc18ac21e71572a758498f31838d7"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.certifications","field_label":"DE Certifications","before":null,"after":["The German Tauro ECO 100-3-D technical-data page publishes VDE-AR-N 4105, VDE-AR-N 4110, VDE 0126-1-1 covering Tauro Eco 50-3-P through 100-3-D, EN 50549-2 and IEC 62109 certificates."],"summary":"DE Certifications updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_4db148a3a9a602e4dce2b8f253a0057e34582461488e77cc394dc6d57cf50ff7"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23.","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23. First-market US and DE overlay review 2026-08-30: official regional catalogues recorded; Australian overlays and scores unchanged.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_3e4f072a20f25b607dc8a13e5b14711fd6f7ca8780e70a51bf3c71b189d99251"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.warranty_terms","field_label":"DE Warranty conditions","before":null,"after":{"labour":"Approved removal and replacement labour is covered during the Warranty Plus period when Fronius or a Fronius-commissioned installer performs the work.","registration":"Inverters must be registered on Solar.web within 30 months of factory delivery. Unauthorised repairs are not covered.","remedy":"Fronius provides the required spare part or an equivalent replacement, or reimburses market value, under the governing terms.","removal_reinstallation":"Approved component removal and replacement are covered during the Warranty Plus period. Work on other site equipment is excluded.","transferability":"Remaining claim rights transfer with ownership of the covered inverter. The term is not extended by the transfer.","transport":"Standard national shipping to the Fronius repair centre, and return of the spare or replacement, is covered during the Warranty Plus period. Express, air and sea freight are excluded."},"summary":"DE Warranty conditions updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_34864e0ecd5ee36e8a14e72b39b014b781b20a19cb210810da78cd13af466db9"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.support_note","field_label":"DE Support Note","before":null,"after":"Fronius Germany's technical-data catalogue names Tauro ECO 100-3-D. Tauro 50-3-P and Tauro Eco 100-3-P are different wiring identities and are not transferred onto this Direct record.","summary":"DE Support Note updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_31a85ded1bdac1a13739d3078d77223f4fa53789223078e7b7df0a7572291294"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.US.source_urls","field_label":"US Evidence sources","before":null,"after":["https://www.fronius.com/en-us/usa/solar-energy/installers-partners/products-solutions/inverters-and-energy-solutions/gen24-ul-inverter-with-flexible-backup-power","https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters","https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-primo-gen24/primo-gen24-3-8-208-240"],"summary":"US Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"],"event_id":"chg_1eb6205d404c0e662e2ce9b997e30885057982c50491c0009cf97c431f50fd5b"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.grid_compatibility","field_label":"DE Grid and installation context","before":null,"after":"Three-phase 100 kW Direct-wiring commercial inverter with exact German VDE-AR-N 4105 / 4110 evidence naming Tauro Eco 100-3-D. Connection approval remains installation-specific.","summary":"DE Grid and installation context updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_1cf7fce02b0511ed3bf60954c74e546d05ec8a14d9824727f1a4a3c508dd7d30"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ebf4f53a91f407966abc8c00145bc44ae9049f9de03bc0f93ec26065b24076d8","event_type":"field_added","field_path":"market.DE.source_urls","field_label":"DE Evidence sources","before":null,"after":["https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE-AR-N_4105_2018_Fronius_Tauro_and_Tauro_Eco_DE_EN.pdf","https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE_0126-1-1_2006_2012_Fronius_Tauro_Eco_50-3-P_-_100-3-D_DE_EN.pdf","https://downloads.fronius.com/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_DE.pdf","https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter","https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter/fronius-tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_DE.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf"],"summary":"DE Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"DE","valid_from":null,"valid_to":null,"recorded_at":"2026-08-30","recorded_at_basis":"latest_changed_record_date","source_ids":["src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"],"event_id":"chg_19523844d41e6e769483fba8719e890c6c272d75575d4d85b1d3728c35a20086"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.state","field_label":"State","before":null,"after":"supported","summary":"State updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_b0e69f796407cca86fe92c3f9a51ec51ab27cb21cd1d91514a73e89cf91c4ccd"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.confidence","field_label":"Confidence","before":null,"after":"high","summary":"Confidence updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4caa93854c71207dc6d467f60fca8ee6f177aaadae0ebb703f9c90bc815d5a14"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.source_urls","field_label":"Evidence sources","before":null,"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Evidence sources updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_4c2929f77ebfce56921846bbc4fd3b2e7946d8a5e6396ebecbbd0f2950c01622"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_55798c4d37fe94664056b2df8e4a4b0ac23114b1809f3ef3477712915fe0fc3a","event_type":"field_added","field_path":"decision_evidence.inverter_envelope.architecture_boundary.value","field_label":"Value","before":null,"after":"Direct-pv string inverter with 1 independent MPPT at the scored model boundary.","summary":"Value updated in the publication","scope":"decision_evidence","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-25","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_3232ff856a512593b907ac7d83f6046d3a19fb90d0870173e970dc730bde9d98"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Peak efficiency (%).source_urls","field_label":"Peak efficiency (%): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Peak efficiency (%): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_facb9a4c6032b8cfc0df04d37a401b624481b59cf479464d2ca4409afa0ef2a2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_removed","field_path":"audit_rows.Financial strength & warranty backing.value","field_label":"Financial strength & warranty backing","before":"Stable / listed","after":null,"summary":"Financial strength & warranty backing updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_faa3a5ddddc07b61b1bd647289ac888309ba38d08368a18e8c66d0ede671e8fb"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Financial strength & warranty backing.value","field_label":"Financial strength & warranty backing","before":"Financially strong (profitable / strong parent)","after":"Stable / listed","summary":"Financial strength & warranty backing updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_f848287e231cb628eedf459711fbb0c46ee661edb3679441cad4eea318097072"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"pillars.Guarantee & Backbone.score_precise","field_label":"Guarantee & Backbone pillar score","before":85,"after":79,"summary":"Guarantee & Backbone pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_f7dc9f666ef2ddd0e60d987d7f032ac889d9f753305bb0633cbb72304c0e512a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.ranges","field_label":"Ranges","before":[{"checked":"2026-06-20","market":"global","max":100,"min":100,"range_label":"100 kW","source_revision":"Live source; revision not stated","source_url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems","unit":"kW"}],"after":[{"checked":"2026-08-23","market":"global","max":100,"min":100,"range_label":"100 kW","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","unit":"kW"}],"summary":"Ranges updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_e62cd42c19d4952f5aec8d2ec51be37e758c5a190a5d029ad1b617c577df7ba7"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"benchmark.source","field_label":"Source","before":{"checked":"2026-06-20","source_revision":"Live source; revision not stated","source_url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems"},"after":{"checked":"2026-08-23","source_revision":"Fronius Tauro ECO 100-3-D exact product page, rechecked 2026-08-23","source_url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"},"summary":"Source updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_dc5fd4c8ceb9b96fb74254aa3a8266b579ed1208149a846024e548f8eba7f612"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Financial strength & warranty backing.source_urls","field_label":"Financial strength & warranty backing: Evidence sources","before":[],"after":["https://www.fronius.com/en/about-us/history","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Financial strength & warranty backing: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_dbd5cf147a9cb80e1633771119998417a3f4dd0c0bfa3a7e4677da065c89f547"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Backup / islanding.source_urls","field_label":"Backup / islanding: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Backup / islanding: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d773ede345b46eaa4a6a05a6d0c49799e34c7ee1f38134b53aae88e24849f019"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Firmware & security disclosure.source_urls","field_label":"Firmware & security disclosure: Evidence sources","before":["https://www.fronius.com/en-gb/uk/cybersecurity-fronius"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Firmware & security disclosure: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_9bc692e85bf9b1d8112bc991c9e70a1a8f210724b5e68235b92d09e01a9fd3b5","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d4f263ab94326e6ad4dfaefaac223f9fdc42f1b1779ccd9b4eba9a59df3ba083"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Shutdown / arc safety.source_urls","field_label":"Shutdown / arc safety: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Shutdown / arc safety: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_d4df40e0c591c3353cc5c5f635a26b7e7324497d51f8dabf95eec641226d4b8a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Open protocol & API maturity.source_urls","field_label":"Open protocol & API maturity: Evidence sources","before":["https://manuals.fronius.com/html/4204260307","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Open protocol & API maturity: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_d2c909cf28e7703126cb502fe65e09a84912a907b4c5be0390c00f2a6632e6b2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Weighted efficiency (CEC/Euro %).source_urls","field_label":"Weighted efficiency (CEC/Euro %): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Weighted efficiency (CEC/Euro %): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_d1d8aba81b4b81676f32ad975f87f95129acf3f6c22df45f35350e0ddb5a8151"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Thermal load management.source_urls","field_label":"Thermal load management: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Thermal load management: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_c56976aefec611fcb42e8487046315a5b4cef1bed2d2dbf66c9e5bf002926cc1"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.EV charging integration.source_urls","field_label":"EV charging integration: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"EV charging integration: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_b86fcd49de0b121c57ae9aa67b535dbce4ac326cbd6d470d2de7206fb079d2d2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Hybrid / battery capability.source_urls","field_label":"Hybrid / battery capability: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Hybrid / battery capability: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_b1c7deb9c41adf95ac857b92fed59581d040238ba996182bce7c67bd6248eaa8"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Manufacturing track record.source_urls","field_label":"Manufacturing track record: Evidence sources","before":[],"after":["https://www.fronius.com/en/about-us/history","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Manufacturing track record: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_ae4cf264e5812370e0e571ffbe304569fd78158fad639c5d4369401fde9b479f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Number of MPPTs.source_urls","field_label":"Number of MPPTs: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Number of MPPTs: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_acadcacbbb9bdf9f9427f4a955ff791cabb39df1f5d7fd402e8aa320e5baf618"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Operating temperature range.source_urls","field_label":"Operating temperature range: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Operating temperature range: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_ac497f08e302d78f1424240e98f88f8803a4237ad49e01c40866c270e353d598"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":74.9,"after":74.1,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_ab7e77082656ce3c1c699a8f1f6f2dccb33ec1dc94c0fa546541f9fc341a466f"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Thermal management.source_urls","field_label":"Thermal management: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Thermal management: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_aaaf5d6bd37ce387db7ca2f8253855c0087e4c84459ae9f20573de9ce4190d37"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_added","field_path":"market.AU.warranty_terms","field_label":"AU Warranty conditions","before":null,"after":{"labour":"Warranty Plus includes servicing by the authorised service pathway; owner-selected work is not an unrestricted entitlement.","registration":"Solar.web registration is required. For inverters commissioned on or after 1 June 2026, registration is required for the free ten-year Warranty Plus offer.","remedy":"Registered Warranty Plus covers replacement materials and servicing under the governing certificate and claim process.","removal_reinstallation":"No unrestricted project-wide removal and reinstallation entitlement is stated.","transferability":"An automatic later-owner transfer entitlement is not stated on the reviewed Australian warranty summary.","transport":"Australian transport is included under Warranty Plus, subject to the governing terms."},"summary":"AU Warranty conditions updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_a75972503ed279a7a3f4d8bdbb003855b2ebec3840b449396b054f9ee6a3eedd"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Ingress protection.source_urls","field_label":"Ingress protection: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Ingress protection: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_a62d77f3a78fdb59363049c78e7e85b7b0025844a468ea2fd796c81bfd678179"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Grid & safety certification.source_urls","field_label":"Grid & safety certification: Evidence sources","before":["https://www.fronius.com/en/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Grid & safety certification: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_b64acea120fdfee9977649aa4edd2b1eb9d835570dc38c91b7fd9b7330cbcc5b","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_9c1d18ae174c2c3937206075ffa8d94c934ca9a6625b7839c76c7175011e3aa1"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Surge protection.source_urls","field_label":"Surge protection: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Surge protection: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_9bebb983e53e6e3f48aa67571265249247494a3d67d0f262569328de9c98d359"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_changed","field_path":"pillars.Guarantee & Backbone.score_precise","field_label":"Guarantee & Backbone pillar score","before":79,"after":73,"summary":"Guarantee & Backbone pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_99d690e8eae98c6393402a085a243efcd09a37bed072a99b8cabde7861d69f8e"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Monitoring & smart features.source_urls","field_label":"Monitoring & smart features: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Monitoring & smart features: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_95886861643aa183632c12894e8b386ff03170236dca6d6e7a9a34d72df5bbf1"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty assurance.source_urls","field_label":"Warranty assurance: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Warranty assurance: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_7abce60470137a604c32826c6947679133f870baf0ee211bfe28a7327c6b6493"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Max DC:AC oversizing ratio.source_urls","field_label":"Max DC:AC oversizing ratio: Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Max DC:AC oversizing ratio: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_74eb60724977fafa61021fb91b9295701956a529183144c1461cff56f0990f4d"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":74.1,"after":73.2,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_70c454de4385bccc7939717b2d318b0d8931d4f4b1d782230c13d0e1c2e7030e"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Smart home & IoT depth.source_urls","field_label":"Smart home & IoT depth: Evidence sources","before":["https://manuals.fronius.com/html/4204260307","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Smart home & IoT depth: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_6e8a37713f05ac79de02ce3451fe3584763884027e4fe6ef239050c0dc7b4d2a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Reactive power range.source_urls","field_label":"Reactive power range: Evidence sources","before":[],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Reactive power range: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_601c8925f6356fe6dede72f12cdf505a1a74e7e3d22e1ca29e23fe61680927bc"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_removed","field_path":"audit_rows.Financial strength & warranty backing.source_urls","field_label":"Financial strength & warranty backing: Evidence sources","before":["https://www.fronius.com/en/about-us/history","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":null,"summary":"Financial strength & warranty backing: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_5f26cb3b7b0bf48e0fd367db8b5563ab1efd9278ef997dfce6f1e650332b64f0"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Live exact-model technical page checked 2026-08-06; current AU warranty model checked 2026-08-06; CER export data as at 2026-07-29","after":"Fronius Tauro ECO 100-3-D exact page, current Australian Warranty Plus offer and company history rechecked 2026-08-23.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_5bd9edd7416507f5780f4df4e3b309efcd5604247c52bcbf8b20f3c7d9edf0b2"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_338e6a2b3a0262e1f986edacf0cae010262ef957c90ff24fd2e556caac2f3af4","event_type":"field_removed","field_path":"audit_rows.Financial strength & warranty backing.evidence_status","field_label":"Financial strength & warranty backing: Evidence status","before":"sourced","after":null,"summary":"Financial strength & warranty backing: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"],"event_id":"chg_58aaac7d0d7256d33f6cacc5f73f76af458723a2b5b5f8320b8ef9748e206d5c"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Semiconductor technology.source_urls","field_label":"Semiconductor technology: Evidence sources","before":["https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Semiconductor technology: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"],"event_id":"chg_468e1e0418d42974eb11d9bb7149f1c76d43a721c6e982f83285ec8332c3557a"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://cer.gov.au/document/cec-approved-inverters","https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://cer.gov.au/document/cec-approved-inverters","https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"],"event_id":"chg_3ec8f530cb12f03f3152c737f2e28b94c0b6ba876ea0d7cad0f8586719be12a4"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Max input current per MPPT (A).source_urls","field_label":"Max input current per MPPT (A): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Max input current per MPPT (A): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"],"event_id":"chg_08d6a19ab819c538775d0d05eed0ffcfefbeea8ad8b234a0ddd6d2e35088b574"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.VPP & grid services readiness.source_urls","field_label":"VPP & grid services readiness: Evidence sources","before":["https://manuals.fronius.com/html/4204260307","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"VPP & grid services readiness: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_07013d10659528beb62b3632c5209a2516ef43ece130e6bffe5c97fde01fd5b8"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Night standby consumption (W).source_urls","field_label":"Night standby consumption (W): Evidence sources","before":["https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Night standby consumption (W): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_06be43bf6958f599a620b972d2acd2cb85820046910cdd7e04f7cfc4d2f44b62"},{"subject_id":"fronius-international-gmbh-fronius-tauro-eco-100-3-d","release_id":"rel_ce9eac2e04e2c7b2140a3c19e7d721f67e4cc696250248f13cfa4ff3d134c480","event_type":"field_changed","field_path":"audit_rows.Warranty period (yrs).source_urls","field_label":"Warranty period (yrs): Evidence sources","before":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models"],"after":["https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d"],"summary":"Warranty period (yrs): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-23","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"],"event_id":"chg_041259a8e9cc1a678f69148b148df0485caf41cb7ac07dcee86a84a1feedf4e3"}],"sources":[{"id":"src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff"},"content_fingerprint":null,"retrieval":null},{"id":"src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-primo-gen24/primo-gen24-3-8-208-240","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9"},"content_fingerprint":null,"retrieval":null},{"id":"src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/products-solutions/inverters-and-energy-solutions/gen24-ul-inverter-with-flexible-backup-power","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"},"content_fingerprint":null,"retrieval":null},{"id":"src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE_0126-1-1_2006_2012_Fronius_Tauro_Eco_50-3-P_-_100-3-D_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a"},"content_fingerprint":null,"retrieval":null},{"id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE-AR-N_4105_2018_Fronius_Tauro_and_Tauro_Eco_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e"},"content_fingerprint":null,"retrieval":null},{"id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","label":"Warranty period (yrs)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb"},"content_fingerprint":{"kind":"content_sha256","sha256":"c0953caf9eb189bed556790a1b939545ee72d4990c9436c3d6004bc5b3559d4c","scope":"retrieved_document_body","checked_at":"2026-08-23T14:23:47.175Z"},"retrieval":{"checked_at":"2026-08-23T14:23:47.175Z","status":200,"ok":true,"access_restricted":false,"final_url":"https://www.fronius.com/en/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","content_type":"application/octet-stream","note":null}},{"id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter/fronius-tauro-eco/tauro-eco-100-3-d","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288"},"content_fingerprint":null,"retrieval":null},{"id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","url":"https://downloads.fronius.com/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042"},"content_fingerprint":null,"retrieval":null},{"id":"src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4"},"content_fingerprint":null,"retrieval":null},{"id":"src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"},"content_fingerprint":null,"retrieval":null},{"id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"},"content_fingerprint":null,"retrieval":null},{"id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","label":"Peak efficiency (%)","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31"},"content_fingerprint":null,"retrieval":null},{"id":"src_ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-tauro-eco/tauro-eco-100-3-p","label":"Peak efficiency (%)","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ee9a66fdf2772691869bfa1ad993f124ac6655d0c8922c4cead5c96a245205d4"},"content_fingerprint":null,"retrieval":null},{"id":"src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41","url":"https://www.fronius.com/en/about-us/history","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"},"content_fingerprint":null,"retrieval":null},{"id":"src_a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems","label":"Benchmark source","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a9dd60ed0ded58cba77c5a813ae87e7243080625dbf60544a5489fa938fa393b"},"content_fingerprint":null,"retrieval":null},{"id":"src_9bc692e85bf9b1d8112bc991c9e70a1a8f210724b5e68235b92d09e01a9fd3b5","url":"https://www.fronius.com/en-gb/uk/cybersecurity-fronius","label":"Firmware and security evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9bc692e85bf9b1d8112bc991c9e70a1a8f210724b5e68235b92d09e01a9fd3b5"},"content_fingerprint":null,"retrieval":null},{"id":"src_5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee","url":"https://manuals.fronius.com/html/4204260307","label":"Open protocol & API maturity","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"5be1127a2c583cb6e624683fb3cfb3a1f9509ddee0d503cb7bfc9e38db100cee"},"content_fingerprint":null,"retrieval":null},{"id":"src_8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8a86320509a59b4af2196b4f72e580ed27b0abea2280f0297d39280cd012194f"},"content_fingerprint":null,"retrieval":null},{"id":"src_e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43","url":"https://web.archive.org/web/20240330100756/https://www.fronius.com/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_P_EN_US.pdf","label":"Semiconductor technology","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e3a16ac6fdf1162a0aad977564aa5a96f9b97a8f0b0608620de9f0d8fec11f43"},"content_fingerprint":null,"retrieval":null},{"id":"src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","url":"https://cer.gov.au/document/cec-approved-inverters","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773"},"content_fingerprint":null,"retrieval":null},{"id":"src_8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models","label":"Warranty period (yrs)","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8459bb773133b755e6043c9bdfd467b8d269ee868112a95c2096b0f071248ac0"},"content_fingerprint":null,"retrieval":{"checked_at":"2026-08-23T14:23:47.175Z","status":200,"ok":true,"access_restricted":false,"final_url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models","content_type":"text/html; charset=utf-8","note":"Reachability only; dynamic web page is not content-fingerprinted"}},{"id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","label":"Warranty period (yrs)","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88"},"content_fingerprint":null,"retrieval":null},{"id":"src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e","url":"https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"},"content_fingerprint":null,"retrieval":null},{"id":"src_b64acea120fdfee9977649aa4edd2b1eb9d835570dc38c91b7fd9b7330cbcc5b","url":"https://www.fronius.com/en/~/downloads/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_EN.pdf","label":"Grid & safety certification","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b64acea120fdfee9977649aa4edd2b1eb9d835570dc38c91b7fd9b7330cbcc5b"},"content_fingerprint":null,"retrieval":null}]},"approval_history":[],"sources":[{"id":"src_1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"1d2948991fde04e941779ffab5ed528db417a0e9aa4aa41ccf399991e4a749ff"},"content_fingerprint":null,"retrieval":null},{"id":"src_23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773","url":"https://cer.gov.au/document/cec-approved-inverters","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"23c58dbd60caa7a34568cc86265249cee4ef6cc01c77d4c6ad121cd6c0728773"},"content_fingerprint":null,"retrieval":null},{"id":"src_55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/products-solutions/commercial-energy-solutions/tauro-commercial-solar-inverter-for-large-scale-pv-systems?bt=m","label":"Peak efficiency (%)","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"55f899a5d42b4db1cb33597ee790551f49fcde254a8ff0abd2acb4a217b75b31"},"content_fingerprint":null,"retrieval":null},{"id":"src_57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE_0126-1-1_2006_2012_Fronius_Tauro_Eco_50-3-P_-_100-3-D_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"57f8e1a4c54ef6f51b6b0827efec13c9463e2740016fb3dfb0316e5c78e7029a"},"content_fingerprint":null,"retrieval":null},{"id":"src_70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e","url":"https://downloads.fronius.com/Solar%20Energy/Certificates/SE_CER_Conformity_VDE-AR-N_4105_2018_Fronius_Tauro_and_Tauro_Eco_DE_EN.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"70ee2081094b3aaef4ec5e703ea7828a4a22aded243bf8888208509562ca901e"},"content_fingerprint":null,"retrieval":null},{"id":"src_78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","label":"Warranty period (yrs)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"78af541ca33ec711ee1713cf341c8d72f2ce69b2a757d997bd1cb11460ce9edb"},"content_fingerprint":{"kind":"content_sha256","sha256":"c0953caf9eb189bed556790a1b939545ee72d4990c9436c3d6004bc5b3559d4c","scope":"retrieved_document_body","checked_at":"2026-09-09T11:03:14.539Z"},"retrieval":{"checked_at":"2026-09-09T11:03:14.539Z","status":200,"ok":true,"access_restricted":false,"final_url":"https://www.fronius.com/en/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_EN.pdf","content_type":"application/octet-stream","note":null}},{"id":"src_93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter/fronius-tauro-eco/tauro-eco-100-3-d","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"93fda2193f484189930b9415d91bd3d030bfb1acb922ec402b3bb9636d0d0288"},"content_fingerprint":null,"retrieval":null},{"id":"src_9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042","url":"https://downloads.fronius.com/Solar%20Energy/Datasheets/SE_DS_Fronius_Tauro_D_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9f5c4d1a6a99d7a9a44119944e5e50f8c552707256a91904e8364c913aaee042"},"content_fingerprint":null,"retrieval":null},{"id":"src_9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88","url":"https://www.fronius.com/en-au/australia/solar-energy/installers-partners/service-support/warranty-models?bt=m","label":"Warranty period (yrs)","source_type":"warranty","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9faf595c6e6df13a481ece22ee1234c07b318d2c00ded5eb88faec1b74a0df88"},"content_fingerprint":null,"retrieval":null},{"id":"src_a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/technical-data/all-products/inverters/fronius-primo-gen24/primo-gen24-3-8-208-240","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"a54821d626b758ebd4063731dbf71e76a742ecb3e7d0554aad399d5afd77b9f9"},"content_fingerprint":null,"retrieval":null},{"id":"src_d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54","url":"https://www.fronius.com/en/help-center/solar-energy/products/solar-inverters/tauro/tauro-eco/tauro-eco-100-3-d","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d2c0eb3465a50d1a65a29f1cb98f3b98b53cb613d13698dc1dca7a56ccb22f54"},"content_fingerprint":null,"retrieval":null},{"id":"src_e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4","url":"https://www.fronius.com/de-de/germany/solarenergie/installateure-partner/technische-daten/alle-produkte/wechselrichter","label":"DE market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e62624be37dfda842f28505e071240eda12af5b8567118e55b20414f2608bbd4"},"content_fingerprint":null,"retrieval":null},{"id":"src_e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2","url":"https://www.fronius.com/~/downloads/Solar%20Energy/Terms%20of%20Warranties/SE_ToW_DE.pdf","label":"DE market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"e8a97e9ed7deaf470071af6ee38d8b59ae4f0ff9eda1d0bfd40eb169e4de2cc2"},"content_fingerprint":null,"retrieval":null},{"id":"src_ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e","url":"https://www.fronius.com/en-au/australia/solar-energy/about-us/contacts","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"ecf81f2d8037d1f4e6486f06734b70585e15701007dc56d51310db7be868ba2e"},"content_fingerprint":null,"retrieval":null},{"id":"src_efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01","url":"https://www.fronius.com/en-us/usa/solar-energy/installers-partners/products-solutions/inverters-and-energy-solutions/gen24-ul-inverter-with-flexible-backup-power","label":"US market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"efe80ad19adc94aa0a404dec70707a2bfa65ce0abfae21c007e9d7bd14b10b01"},"content_fingerprint":null,"retrieval":null},{"id":"src_f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41","url":"https://www.fronius.com/en/about-us/history","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f95e6b5348a61e26a5a4aa02173f0c398b6d36195370a3759926951db49eaf41"},"content_fingerprint":null,"retrieval":null}],"boundaries":{"rights":"An unresolved licence field is not permission to cache, redistribute, derive from, or use a source for AI.","history":"Evidence events record verification activity. Change-history events separately record accepted before-and-after publication changes.","change_history":"Events record accepted publication changes, not every evidence re-check or a claim that the product changed on that date.","change_validity":"valid_from and valid_to remain null unless a source establishes when the changed fact applied in the world.","change_scope":"Compatibility, system pairing, suitability and relative leaderboard prose are excluded.","applicability":"Market evidence does not establish stock, system compatibility, network approval, installation suitability, or approval of an earlier installation.","approval_history":"Approval history contains exact, score-neutral source-register links recorded since monitoring began. It is not a complete lifetime history."}}