{"schemaVersion":"1.1.0","subject":{"slug":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","kind":"panel","brand":"SunPower","name":"Maxeon 7","canonical_name":"SunPower Maxeon 7 445 W","model":"SPR-MAX7-435-PT / SPR-MAX7-440-PT / SPR-MAX7-445-PT (112 IBC cells, monofacial glass-backsheet); scored model SPR-MAX7-445-PT","certification_model":null,"certification_identities":[],"benchmark":{"min":435,"max":445,"scored":445,"unit":"W","metric":"rated power","policy":"highest_in_series","review_status":"current","note":"The score is anchored to the highest published rating in this exact published series.","range_label":"435–445 W","scored_label":"445 W","market":null,"series_id":"sunpower-maxeon-7","series_definition":"Same model family, cell count, dimensions, construction and market certification; power-bin changes only.","scored_model":"SPR-MAX7-445-PT","evidence_scope":"exact_model","source":{"source_url":"https://sunpower.maxeon.com/int/sites/default/files/2024-03/sp_max7_112c_PT_435-445_res_dc_40years_warranty_ds_en_a4_551184A.v4.pdf","source_revision":"review.solar-maxeon-solar-technologies-sunpower-maxeon-7-spr-max7-445-pt-445w-datasheet.pdf","checked":"2026-07-16"},"ranges":[{"min":435,"max":445,"unit":"W","market":"global","range_label":"435–445 W","source_url":"https://sunpower.maxeon.com/int/sites/default/files/2024-03/sp_max7_112c_PT_435-445_res_dc_40years_warranty_ds_en_a4_551184A.v4.pdf","source_revision":"review.solar-maxeon-solar-technologies-sunpower-maxeon-7-spr-max7-445-pt-445w-datasheet.pdf","checked":"2026-07-16"}],"supporting_metrics":[]},"score":78,"rubric_version":"2.14.0","url":"https://review.solar/products/maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s"},"envelope":{"version":"1.1.0","subject":{"type":"product","id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","identity_scope":"published_product_record","model":"SPR-MAX7-435-PT / SPR-MAX7-440-PT / SPR-MAX7-445-PT (112 IBC cells, monofacial glass-backsheet); scored model SPR-MAX7-445-PT","certification_model":null,"certification_identities":[],"benchmark_series_id":"sunpower-maxeon-7"},"recorded_at":null,"recorded_at_basis":null,"source_bindings":[{"source_id":"src_03948572c20c852cb7b653e0ae2739f7ce40ffa0333ab15f194f6896cb2ca07d","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Financial strength & warranty backing"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_0f8f1a3d16130b03894e68d4a06e47933a8974808a95489ced656e1b7b4bcc2b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Carbon footprint / EPD"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell technology tier"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Contact"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Module efficiency (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Temp coefficient Pmax (%/C)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Power tolerance (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Positive loading (MQT16, Pa)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Negative loading (MQT16, Pa)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Salt mist (IEC 61701)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.First-year degradation (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Annual degradation (%/yr)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-06","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","role":"primary_product_source","object_scopes":["exact_product_record"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_2cf22390a629a3848594ee4b13c42ac1fd93701e4345efda014e3edf0e4efceb","role":"supporting_source","object_scopes":["product"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31","role":"supporting_source","object_scopes":["product"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_45e57d25cf16174636eb8cf4314bf3546c1018ef8602d5fc82716ef3d91e0e9c","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-04","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_50104b413ffecad678d62a45794b077b309b53f8209664ebfaf3ed4f0d5d134f","role":"benchmark_evidence","object_scopes":["exact_model"],"field_paths":["benchmark.source"],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-07-16","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_50104b413ffecad678d62a45794b077b309b53f8209664ebfaf3ed4f0d5d134f","role":"benchmark_range_evidence","object_scopes":["product_series"],"field_paths":["benchmark.ranges.0"],"jurisdiction":"global","evidence_classes":[],"checked_at":"2026-07-16","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Guaranteed end-of-warranty output (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Performance guarantee period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Guarantee period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Guarantee assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty transferability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-06","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_613e4d7bf194e12a4933d3fbdb9a4c0db4034a483ef3df5c1f7d9ada854f8926","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.End-of-life & recycling disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6e86a1e61012fff0ea69551be0010aef53e92e3408e8207baf67089cffa54bb7","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-06","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7051301b7841719412f65c7b25d7e143c4b2f1b6cca0adecef4f68a867bb76f8","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-06","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7b9df65b375a59f7908d46d3857b9da26c74ada553f9ef56ee9bb537466f4f0a","role":"supporting_source","object_scopes":["product"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_8b53a50244595238b98e86a154cb0d2c439657d8e7259b3a06f1f269901c3bd5","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Carbon footprint / EPD"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9416c4d4d8d2fdae600031eba5272d573246e0fa67c9c509ba62ba1537f979cf","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_b1a4a08e0760050083a896aff105f570d0ed3b0252f6729a7f5d0e34a742b911","role":"supporting_source","object_scopes":["product"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-06","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Verified reliability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9","role":"supporting_source","object_scopes":["product"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_feff0b99867fbb8834bc4fa56bf258e1445e2219f1bce8e76ff045ee88183fe1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-08-20","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null}],"events":[{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","object_id":null,"date":"2026-08-20","event_type":"product_evidence_checked","summary":"Core scorecard evidence checked","scope":"product_record","jurisdiction":null,"source_ids":[],"event_id":"evt_43a7390579e4cd862cd552dae4773b3461c861c815eb613795f276a94e59f7cb"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","object_id":null,"date":"2026-08-06","event_type":"market_evidence_checked","summary":"AU market evidence checked","scope":"market_overlay","jurisdiction":"AU","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","src_6e86a1e61012fff0ea69551be0010aef53e92e3408e8207baf67089cffa54bb7","src_7051301b7841719412f65c7b25d7e143c4b2f1b6cca0adecef4f68a867bb76f8","src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"],"event_id":"evt_fb9241c76e2463db3c73189811b70b1f9b4a093643acdb852a00dc75605840c8"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","object_id":null,"date":"2026-07-16","event_type":"benchmark_evidence_checked","summary":"Series benchmark evidence checked","scope":"scored_benchmark","jurisdiction":null,"source_ids":["src_50104b413ffecad678d62a45794b077b309b53f8209664ebfaf3ed4f0d5d134f"],"event_id":"evt_d048a23eeeb626ea977de48314a57eb2405ae01e494fc5ea23da3035253b9e54"}]},"change_history":{"schemaVersion":"1.0.0","baseline":{"dataset_revision":"rel_bcce8c246a65d51663134988c0ee07203ae81007281b5169834d130773e56cf0","product_count":232,"recorded_at":"2026-08-16","recorded_at_basis":"latest_record_date_in_baseline"},"current_release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","events":[{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"audit_rows.Independent energy yield.value","field_label":"Independent energy yield","before":"Field/PAN energy-yield validated","after":"Brand or series yield-tested; exact model not covered","summary":"Independent energy yield updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7","src_cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48"],"event_id":"chg_f528f04f8ba83ba4239961e0053f2b0be1f48cb468d2454300ea468d52580b24"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":79.5,"after":78.5,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_e79263abc066c2d2837fd16d9cf34118b65cbdf5ed469d02dc38c480ac43776d"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":69.5,"after":71.6,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_c65669d58179d2a5b4b5216aedaf3e2d962a06b45de28d113c5745677a9e9069"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"pillars.Efficiency & Yield.score_precise","field_label":"Efficiency & Yield pillar score","before":81.4,"after":74.1,"summary":"Efficiency & Yield pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_4bcba0829629ee958498738cd329cc3c8262a55e0a9c72a25475c7c49bb1bfd5"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_586cbb198b8013226a73cac932906a987a808ff3d95ac7f3a532d75fe1e1ee3c","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Maxeon 7 551184 Rev A V4 sheet and Australian limited warranty 544362 Rev E effective 2024-08-01 reviewed 2026-08-06 Re-verification 2026-08-19: Verified reliability recorded as \"Brand or series independently tested; exact model not covered\" under panel rubric v2.13.0, which added a band for brand or series evidence where the exact model is not covered by the third-party record.","after":"Maxeon 7 551184 Rev A V4 sheet and Australian limited warranty 544362 Rev E effective 2024-08-01 reviewed 2026-08-06 Re-verification 2026-08-19: Verified reliability recorded as \"Brand or series independently tested; exact model not covered\" under panel rubric v2.13.0, which added a band for brand or series evidence where the exact model is not covered by the third-party record. Re-verification 2026-08-20: Independent energy yield recorded as brand-or-series under panel rubric v2.14.0, which applied to this criterion the same exact-model rule v2.13.0 applied to Verified reliability.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-20","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_2ac836136c266e37545369e67fe9242441ca715974ef6b5ee8ec3cd83d212004"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_964b833714d4f855cc63b79326ebff06ae02797d0adcd7ccd408727de3e0e22d","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":83.1,"after":79.5,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-19","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_dbb661850cd114c5151f55987e04e5459eaa84403746afd9794a5557ca0df4da"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_964b833714d4f855cc63b79326ebff06ae02797d0adcd7ccd408727de3e0e22d","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":85.5,"after":69.5,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-19","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_9d79532dee3fee524d22caf8f837bd5ecfd0cde283e0d54b6d471266fa043319"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_964b833714d4f855cc63b79326ebff06ae02797d0adcd7ccd408727de3e0e22d","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Maxeon 7 551184 Rev A V4 sheet and Australian limited warranty 544362 Rev E effective 2024-08-01 reviewed 2026-08-06","after":"Maxeon 7 551184 Rev A V4 sheet and Australian limited warranty 544362 Rev E effective 2024-08-01 reviewed 2026-08-06 Re-verification 2026-08-19: Verified reliability recorded as \"Brand or series independently tested; exact model not covered\" under panel rubric v2.13.0, which added a band for brand or series evidence where the exact model is not covered by the third-party record.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-19","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_97fa838244d704c5d8e2703fa878562749d47efa2da90f0ca2f2425dd568ce0d"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_964b833714d4f855cc63b79326ebff06ae02797d0adcd7ccd408727de3e0e22d","event_type":"field_changed","field_path":"audit_rows.Verified reliability.value","field_label":"Verified reliability","before":"Top Performer (multi-year)","after":"Brand or series independently tested; exact model not covered","summary":"Verified reliability updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-19","recorded_at_basis":"latest_changed_record_date","source_ids":["src_9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7","src_cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48"],"event_id":"chg_1f0f318e33da4c8fdd5d12504c1287f17193655889a8e28d5739d0f74b4b9625"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_removed","field_path":"audit_rows.Damp heat extended (2000h).evidence_status","field_label":"Damp heat extended (2000h): Evidence status","before":"derived","after":null,"summary":"Damp heat extended (2000h): Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":[],"event_id":"chg_d089ee372da8350d60b1cc6c55f222e64ceeade16413fdcf06806ca408f46b8a"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"pillars.Architecture & Design.score_precise","field_label":"Architecture & Design pillar score","before":83.4,"after":88.5,"summary":"Architecture & Design pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_a799d3e03aba598493f0626d57bf265538adad9caab3f16883510c8625aba0e4"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_removed","field_path":"audit_rows.Awards.source_urls","field_label":"Awards: Evidence sources","before":["https://cdn.prod.website-files.com/6627b4a16340c535bfabf896/668bef1148a5bfbf75c79fbe_Sunpower.pdf"],"after":null,"summary":"Awards: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31"],"event_id":"chg_92b5c55c47c98f87416629ee2100eeb8a3f0bd790957a152a58775ce9a779368"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":85.1,"after":85.5,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_84937eaab53ef9e4b3cd2733fc1d0a2afc24a9c65c4dd50527279e76ac762e3d"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_removed","field_path":"audit_rows.Damp heat extended (2000h).source_urls","field_label":"Damp heat extended (2000h): Evidence sources","before":[],"after":null,"summary":"Damp heat extended (2000h): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":[],"event_id":"chg_6941fe3ebdf068e7966bee6ae66953ec67c520dc8fe62e1b79edeed1922e04e3"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_removed","field_path":"audit_rows.Awards.value","field_label":"Awards","before":"Not Listed","after":null,"summary":"Awards updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31"],"event_id":"chg_3e5876e628d63064f5b8b9b002cc6df711a4af67254e6a2943f1432a91801994"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":82.1,"after":83.1,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"],"event_id":"chg_3a47244df7a69ccf73bfda7485e293a57aee1343087319c427b555e7ff0f13b4"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_removed","field_path":"audit_rows.Damp heat extended (2000h).value","field_label":"Damp heat extended (2000h)","before":"1000h IEC 61215 standard","after":null,"summary":"Damp heat extended (2000h) updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":[],"event_id":"chg_28352a565ff174333f048efdd8942483d9fe8b7ae3e2e57bad6dd56e03dda235"},{"subject_id":"maxeon-solar-technologies-sunpower-brand-sunpower-maxeon-7-s","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_removed","field_path":"audit_rows.Awards.evidence_status","field_label":"Awards: Evidence status","before":"reviewed_absence","after":null,"summary":"Awards: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31"],"event_id":"chg_0cb1adb90d77206c958d385629694880f669193c46451e686a6bf044716da53a"}],"sources":[{"id":"src_9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7","url":"https://web.archive.org/web/20240521153924/https://scorecard.pvel.com/manufacturer_name/maxeon/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7"},"content_fingerprint":null,"retrieval":null},{"id":"src_cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48","url":"https://scorecard.pvel.com/manufacturer_name/maxeon/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48"},"content_fingerprint":null,"retrieval":null},{"id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","url":"https://www.sunpowerglobal.com/au/documents","label":"Independent energy yield","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"},"content_fingerprint":null,"retrieval":null},{"id":"src_4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31","url":"https://cdn.prod.website-files.com/6627b4a16340c535bfabf896/668bef1148a5bfbf75c79fbe_Sunpower.pdf","label":"Awards","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31"},"content_fingerprint":null,"retrieval":null}]},"approval_history":[],"sources":[{"id":"src_03948572c20c852cb7b653e0ae2739f7ce40ffa0333ab15f194f6896cb2ca07d","url":"https://www.sec.gov/Archives/edgar/data/1796898/000119312526246320/maxn_form_6-k_26_may_202.htm","label":"Financial strength & warranty backing","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"03948572c20c852cb7b653e0ae2739f7ce40ffa0333ab15f194f6896cb2ca07d"},"content_fingerprint":null,"retrieval":null},{"id":"src_0f8f1a3d16130b03894e68d4a06e47933a8974808a95489ced656e1b7b4bcc2b","url":"https://corp.maxeon.com/esg","label":"Carbon footprint / EPD","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"0f8f1a3d16130b03894e68d4a06e47933a8974808a95489ced656e1b7b4bcc2b"},"content_fingerprint":null,"retrieval":null},{"id":"src_22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4","url":"https://www.sunpowerglobal.com/au/documents","label":"Independent energy yield","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"22a8ea0884f6eb5235b3f24579a167758126fc8902a8b831450d8fc52754fdb4"},"content_fingerprint":null,"retrieval":null},{"id":"src_2cf22390a629a3848594ee4b13c42ac1fd93701e4345efda014e3edf0e4efceb","url":"https://scorecard.pvel.com/manufacturer_name/maxeon/ (archived copy https://web.archive.org/web/20240521153924/https://scorecard.pvel.com/manufacturer_name/maxeon/)","label":"Verified reliability","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"2cf22390a629a3848594ee4b13c42ac1fd93701e4345efda014e3edf0e4efceb"},"content_fingerprint":null,"retrieval":null},{"id":"src_4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31","url":"https://cdn.prod.website-files.com/6627b4a16340c535bfabf896/668bef1148a5bfbf75c79fbe_Sunpower.pdf","label":"Awards","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"4337cdf8af6a0fd6f733a18b4cba6fdf82664aa322be559fbfa8140bf224cf31"},"content_fingerprint":null,"retrieval":null},{"id":"src_45e57d25cf16174636eb8cf4314bf3546c1018ef8602d5fc82716ef3d91e0e9c","url":"https://www.solarquotes.com.au/blog/best-solar-panels-2026/","label":"AU research priority","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"45e57d25cf16174636eb8cf4314bf3546c1018ef8602d5fc82716ef3d91e0e9c"},"content_fingerprint":null,"retrieval":null},{"id":"src_50104b413ffecad678d62a45794b077b309b53f8209664ebfaf3ed4f0d5d134f","url":"https://sunpower.maxeon.com/int/sites/default/files/2024-03/sp_max7_112c_PT_435-445_res_dc_40years_warranty_ds_en_a4_551184A.v4.pdf","label":"Benchmark source","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"50104b413ffecad678d62a45794b077b309b53f8209664ebfaf3ed4f0d5d134f"},"content_fingerprint":null,"retrieval":null},{"id":"src_5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83","url":"https://pub-493f128c789642909ff4ab27a5f41128.r2.dev/warranty-documents-and-leaflets/au/AU_Limited_Warranty_for_PV_Modules_%28DC%29_Australia_Warranty_Documents_and_Leaflets.pdf","label":"Guaranteed end-of-warranty output (%)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"5a99977d9f5d9538984c74c7ef40f6062b6617658ae8f7da6fffaa90090cdb83"},"content_fingerprint":null,"retrieval":null},{"id":"src_613e4d7bf194e12a4933d3fbdb9a4c0db4034a483ef3df5c1f7d9ada854f8926","url":"https://www.pv-magazine.com/2022/07/28/maxeon-partners-with-reclaim-pv-to-sa","label":"End-of-life & recycling disclosure","source_type":"news","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"613e4d7bf194e12a4933d3fbdb9a4c0db4034a483ef3df5c1f7d9ada854f8926"},"content_fingerprint":null,"retrieval":null},{"id":"src_6e86a1e61012fff0ea69551be0010aef53e92e3408e8207baf67089cffa54bb7","url":"https://www.maxeon.com/maxeon-solar-panels","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"6e86a1e61012fff0ea69551be0010aef53e92e3408e8207baf67089cffa54bb7"},"content_fingerprint":null,"retrieval":null},{"id":"src_7051301b7841719412f65c7b25d7e143c4b2f1b6cca0adecef4f68a867bb76f8","url":"https://pub-493f128c789642909ff4ab27a5f41128.r2.dev/manuals-and-technical-sheets/au/AU_SunPower_Performance_MAX_Safety%20and%20Installation.pdf","label":"AU market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"7051301b7841719412f65c7b25d7e143c4b2f1b6cca0adecef4f68a867bb76f8"},"content_fingerprint":null,"retrieval":null},{"id":"src_7b9df65b375a59f7908d46d3857b9da26c74ada553f9ef56ee9bb537466f4f0a","url":"https://corp.maxeon.com/esg (archived copy https://web.archive.org/web/20240825053928/https://corp.maxeon.com/esg)","label":"Carbon footprint / EPD","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"7b9df65b375a59f7908d46d3857b9da26c74ada553f9ef56ee9bb537466f4f0a"},"content_fingerprint":null,"retrieval":null},{"id":"src_8b53a50244595238b98e86a154cb0d2c439657d8e7259b3a06f1f269901c3bd5","url":"https://web.archive.org/web/20240825053928/https://corp.maxeon.com/esg","label":"Carbon footprint / EPD","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8b53a50244595238b98e86a154cb0d2c439657d8e7259b3a06f1f269901c3bd5"},"content_fingerprint":null,"retrieval":null},{"id":"src_9416c4d4d8d2fdae600031eba5272d573246e0fa67c9c509ba62ba1537f979cf","url":"https://web.archive.org/web/20251012211203/https://corp.maxeon.com/","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9416c4d4d8d2fdae600031eba5272d573246e0fa67c9c509ba62ba1537f979cf"},"content_fingerprint":null,"retrieval":null},{"id":"src_9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7","url":"https://web.archive.org/web/20240521153924/https://scorecard.pvel.com/manufacturer_name/maxeon/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"9baf0054cc6be8d317676e5c9a9741255e75ef946f7b62f041e69f24f0c381e7"},"content_fingerprint":null,"retrieval":null},{"id":"src_b1a4a08e0760050083a896aff105f570d0ed3b0252f6729a7f5d0e34a742b911","url":"https://corp.maxeon.com/ (archived copy https://web.archive.org/web/20251012211203/https://corp.maxeon.com/)","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"b1a4a08e0760050083a896aff105f570d0ed3b0252f6729a7f5d0e34a742b911"},"content_fingerprint":null,"retrieval":null},{"id":"src_c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741","url":"https://cer.gov.au/document/cec-approved-pv-modules-0","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"c3e4b110eadedac611a21bbded483175125869928eb93d4fb2be7a0d12bf6741"},"content_fingerprint":null,"retrieval":null},{"id":"src_cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48","url":"https://scorecard.pvel.com/manufacturer_name/maxeon/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"cfa97cb3a8f295e6c3dac2d20cc5653acfbbe31bf0958d55b2641cebce6fff48"},"content_fingerprint":null,"retrieval":null},{"id":"src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9","url":"https://scorecard.pvel.com/top-performers/","label":"Verified reliability","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9"},"content_fingerprint":null,"retrieval":null},{"id":"src_feff0b99867fbb8834bc4fa56bf258e1445e2219f1bce8e76ff045ee88183fe1","url":"https://corp.maxeon.com/","label":"Manufacturing track record","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"feff0b99867fbb8834bc4fa56bf258e1445e2219f1bce8e76ff045ee88183fe1"},"content_fingerprint":null,"retrieval":null}],"boundaries":{"rights":"An unresolved licence field is not permission to cache, redistribute, derive from, or use a source for AI.","history":"Evidence events record verification activity. Change-history events separately record accepted before-and-after publication changes.","change_history":"Events record accepted publication changes, not every evidence re-check or a claim that the product changed on that date.","change_validity":"valid_from and valid_to remain null unless a source establishes when the changed fact applied in the world.","change_scope":"Compatibility, system pairing, suitability and relative leaderboard prose are excluded.","applicability":"Market evidence does not establish stock, system compatibility, network approval, installation suitability, or approval of an earlier installation.","approval_history":"Approval history contains exact, score-neutral source-register links recorded since monitoring began. It is not a complete lifetime history."}}