{"schemaVersion":"1.1.0","subject":{"slug":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","kind":"panel","brand":"Mission Solar","name":"MSE PERC 72","canonical_name":"Mission Solar MSE PERC 72 425 W","model":"MSE405SX6S through MSE425SX6S (MSE PERC 72, 6BB, white-backsheet series); scored model MSE425SX6S","certification_model":null,"certification_identities":[],"benchmark":{"min":405,"max":425,"scored":425,"unit":"W","metric":"rated power","policy":"highest_in_market","review_status":"current","note":"The score is anchored to the highest published rating in this exact published US series.","range_label":"405–425 W","scored_label":"425 W","market":"US","series_id":"mission-solar-mse-perc-72","series_definition":"Same installed-base MSE PERC 72 SX6S family, 72 full-cell 6BB layout and white-backsheet construction; power-bin changes only.","scored_model":"MSE425SX6S","evidence_scope":"exact_model","source":{"source_url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf","source_revision":"Mission Solar M6 manual P-SA2-UM-0009 R2 and warranty C-CTA-0017 version 1, rechecked 2026-08-22","checked":"2026-08-22"},"ranges":[{"min":405,"max":425,"unit":"W","market":"US","range_label":"405–425 W","source_url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf","source_revision":"Mission Solar M6 manual P-SA2-UM-0009 R2 and warranty C-CTA-0017 version 1, rechecked 2026-08-22","checked":"2026-08-22"}],"supporting_metrics":[]},"score":53,"rubric_version":"2.16.0","url":"https://review.solar/products/mission-solar-energy-mission-solar-mse-420-san-antonio-texas"},"envelope":{"version":"1.1.0","subject":{"type":"product","id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","identity_scope":"published_product_record","model":"MSE405SX6S through MSE425SX6S (MSE PERC 72, 6BB, white-backsheet series); scored model MSE425SX6S","certification_model":null,"certification_identities":[],"benchmark_series_id":"mission-solar-mse-perc-72"},"recorded_at":null,"recorded_at_basis":null,"source_bindings":[{"source_id":"src_0ac079e6d9fc8562c8c4872459f6892a5868fdcf288346ecf731dcbeab02f424","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.End-of-life & recycling disclosure"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_2e00017e201c8ebf79947074e0c807bf89e4ce52fad0c9716edcd81eed30e6c5","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Financial strength & warranty backing"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-22","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-27","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","role":"research_priority_evidence","object_scopes":["market_priority"],"field_paths":["evidence.market_priorities.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-07-15","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Financial strength & warranty backing"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Manufacturing track record"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-22","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-27","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_720802a453deb58ddf4507c9e63e74399e3761807b2511e40cad763093b0a7c1","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Salt mist (IEC 61701)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Guarantee period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Guarantee assurance"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Warranty transferability"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-22","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-27","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.IN"],"jurisdiction":"IN","evidence_classes":[],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.IN"],"jurisdiction":"IN","evidence_classes":[],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"benchmark_evidence","object_scopes":["exact_model"],"field_paths":["benchmark.source"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-22","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"benchmark_range_evidence","object_scopes":["product_series"],"field_paths":["benchmark.ranges.0"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-22","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Cell technology tier"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Encapsulation & frame construction"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Contact"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Fire classification (IEC 61730)"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Temp coefficient Pmax (%/C)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.NOCT (C)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Power tolerance (%)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Positive loading (MQT16, Pa)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Negative loading (MQT16, Pa)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.PID (IEC TS 62804)"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Salt mist (IEC 61701)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Performance guarantee period (yrs)"],"jurisdiction":null,"evidence_classes":["sourced"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.AU"],"jurisdiction":"AU","evidence_classes":[],"checked_at":"2026-08-22","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"market_evidence","object_scopes":["market_overlay"],"field_paths":["evidence.market.US"],"jurisdiction":"US","evidence_classes":[],"checked_at":"2026-08-27","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","role":"primary_product_source","object_scopes":["exact_product_record"],"field_paths":[],"jurisdiction":null,"evidence_classes":[],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null},{"source_id":"src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9","role":"criterion_evidence","object_scopes":["scored_criterion"],"field_paths":["audit_rows.Independent energy yield"],"jurisdiction":null,"evidence_classes":["reviewed_absence"],"checked_at":"2026-09-02","valid_from":null,"valid_to":null,"recorded_at":null,"superseded_at":null}],"events":[{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","object_id":null,"date":"2026-09-02","event_type":"product_evidence_checked","summary":"Core scorecard evidence checked","scope":"product_record","jurisdiction":null,"source_ids":[],"event_id":"evt_569d61759f915eb0db7481d31c92fb0221761a0f5582fe37fb9aad6f9d043f8e"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","object_id":null,"date":"2026-09-02","event_type":"market_evidence_checked","summary":"IN market evidence checked","scope":"market_overlay","jurisdiction":"IN","source_ids":["src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"],"event_id":"evt_a6b85a835b2bf36fd28bec0c8c704280a18ad6c0844355d3937ca2d398f4f92a"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","object_id":null,"date":"2026-08-27","event_type":"market_evidence_checked","summary":"US market evidence checked","scope":"market_overlay","jurisdiction":"US","source_ids":["src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"evt_cac4f94867901bd201da132936824925364fe54606fc1990b1823ba282de49a3"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","object_id":null,"date":"2026-08-22","event_type":"market_evidence_checked","summary":"AU market evidence checked","scope":"market_overlay","jurisdiction":"AU","source_ids":["src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"evt_19fe1519025090b2171880aab6503f7fde15e41f73487d04f4a4f1c56de5e792"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","object_id":null,"date":"2026-08-22","event_type":"benchmark_evidence_checked","summary":"Series benchmark evidence checked","scope":"scored_benchmark","jurisdiction":"US","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"evt_d43c375c20e5b6914f7f2e3b0e77f091b468f60ef828d5f2eb418f5ed16f62a1"}]},"change_history":{"schemaVersion":"1.0.0","baseline":{"dataset_revision":"rel_bcce8c246a65d51663134988c0ee07203ae81007281b5169834d130773e56cf0","product_count":232,"recorded_at":"2026-08-16","recorded_at_basis":"latest_record_date_in_baseline"},"current_release_id":"rel_535c3e7876133979d2316d1462e79e14f1b603ae00fca9017eb31ce577346a73","events":[{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_89a4b74f6a6a588c236de5e6fe32b10072c3dfcc402a3775adf0bb82799e66ef","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Mission Solar M6 manual P-SA2-UM-0009 R2, warranty C-CTA-0017 version 1 and current company record, rechecked 2026-08-22","after":"Mission Solar M6 manual P-SA2-UM-0009 R2, warranty C-CTA-0017 version 1 and current company record, rechecked 2026-08-22. India existing-catalogue panel ALMM review 2026-09-02: IN overlays recorded against List-I revision 03.08.2026; scores unchanged.","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-09-02","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_f1379e7b790bd551c6a9a8c4aab1059aea60785657af4dfe3537bd0b17765fdd"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_89a4b74f6a6a588c236de5e6fe32b10072c3dfcc402a3775adf0bb82799e66ef","event_type":"field_added","field_path":"market.IN.support_note","field_label":"IN Support Note","before":null,"after":"The exact scored model MSE425SX6S is not named on ALMM List-I revision 03.08.2026. ALMM is a domestic-content and procurement instrument; absence is not a quality finding and does not change the global score. A manufacturer catalogue is not a substitute for List-I. Existing AU, US, DE or EU warranty terms are not transferred.","summary":"IN Support Note updated in the publication","scope":"market_overlay","jurisdiction":"IN","valid_from":null,"valid_to":null,"recorded_at":"2026-09-02","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"],"event_id":"chg_ed6aae5b97bd1597b791f01e7aa73ad540cfc4ddd3e1b35fc67fb70e01f4d604"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_89a4b74f6a6a588c236de5e6fe32b10072c3dfcc402a3775adf0bb82799e66ef","event_type":"field_added","field_path":"market.IN.source_urls","field_label":"IN Evidence sources","before":null,"after":["https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2026/08/202608031426164762.pdf","https://mnre.gov.in/en/approved-list-of-models-and-manufacturers-almm/"],"summary":"IN Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"IN","valid_from":null,"valid_to":null,"recorded_at":"2026-09-02","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"],"event_id":"chg_ce144fe66755a8358bb1e1484cd4a1438240135ae83526233a3ccc30bbf74a9c"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_89a4b74f6a6a588c236de5e6fe32b10072c3dfcc402a3775adf0bb82799e66ef","event_type":"field_added","field_path":"market.IN.status","field_label":"IN Status","before":null,"after":"unavailable","summary":"IN Status updated in the publication","scope":"market_overlay","jurisdiction":"IN","valid_from":null,"valid_to":null,"recorded_at":"2026-09-02","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"],"event_id":"chg_c52e633e77bfda99584505aae7ed8b2fc14b3255f6d5d7cd33e2da90fdcf8e59"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_89a4b74f6a6a588c236de5e6fe32b10072c3dfcc402a3775adf0bb82799e66ef","event_type":"field_added","field_path":"market.IN.certifications","field_label":"IN Certifications","before":null,"after":["The exact scored model MSE425SX6S is not named on ALMM List-I revision 03.08.2026. Cited source_version in-almm-module-2026-08-03-ffdfc4d1f767."],"summary":"IN Certifications updated in the publication","scope":"market_overlay","jurisdiction":"IN","valid_from":null,"valid_to":null,"recorded_at":"2026-09-02","recorded_at_basis":"latest_changed_record_date","source_ids":["src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"],"event_id":"chg_1ecb77c32d77a4779a67adf29a6272bc43eb86732587fc815bb16f1ee776b81a"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_57112f98adbcf442c7cbc551d185419607f499acf300f5cf0334fc7cedbf6258","event_type":"field_changed","field_path":"market.US.support_note","field_label":"US Support Note","before":"The exact MSE425SX6S is documented in the M6 manual. Mission's current product page labels related SX6W products as legacy but does not state the exact SX6S production status, so current US sale availability is held rather than inferred.","after":"Mission Solar's current product catalogue does not list the exact MSE425SX6S. The M6 manual preserves the installed-base identity, but it does not establish current sale. review.solar therefore records this exact SX6S model as unavailable for a new United States purchase and does not substitute a nearby SX6W product.","summary":"US Support Note updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-27","recorded_at_basis":"latest_changed_record_date","source_ids":["src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_f334214d10b67bdf2094473bc5e6c50eea52465ad2ad9ad327a2d3302c024dd0"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_57112f98adbcf442c7cbc551d185419607f499acf300f5cf0334fc7cedbf6258","event_type":"field_changed","field_path":"market.US.status","field_label":"US Status","before":"not_reviewed","after":"unavailable","summary":"US Status updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-27","recorded_at_basis":"latest_changed_record_date","source_ids":["src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_df924c1e402d1d3579b37031b8eef3fb7259a252bcc9b220225bfc9f0e987944"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_added","field_path":"audit_rows.Independent energy yield.source_urls","field_label":"Independent energy yield: Evidence sources","before":null,"after":["https://scorecard.pvel.com/methodology/","https://scorecard.pvel.com/top-performers/","https://scorecard.pvel.com/wp-content/uploads/2022-PVEL-PV-Module-Reliability-Scorecard-Summary.pdf","https://scorecard.pvel.com/wp-content/uploads/2024-PV-Module-Reliability-Scorecard.pdf"],"summary":"Independent energy yield: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7","src_d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855","src_d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9","src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9"],"event_id":"chg_be6485b31160d88940865302b35d1eb0e8a62b3509ebb555a61c0390f91a7a30"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":53,"after":53.2,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_bdfce8aa5d3c098b9d96990302d50887601c54e56c7c25d8a82fab4e9fd5359d"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_changed","field_path":"pillars.Efficiency & Yield.score_precise","field_label":"Efficiency & Yield pillar score","before":41,"after":42.1,"summary":"Efficiency & Yield pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_58ecdc4cbe4449e658e30080f5214f57983603e0ab1f11716f2043c6ffe19280"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_added","field_path":"audit_rows.Independent energy yield.value","field_label":"Independent energy yield","before":null,"after":"No public independent yield result found in reviewed sources","summary":"Independent energy yield updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7","src_d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855","src_d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9","src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9"],"event_id":"chg_3fb82215defbf456844caf90630254a47ec32f5c4a6d30738a25b9c65f3c7196"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_2ea5c7cd6f0608f30890fa4cd0f09ff003aeb2573b1a8d66367b61078fc691a1","event_type":"field_added","field_path":"audit_rows.Independent energy yield.evidence_status","field_label":"Independent energy yield: Evidence status","before":null,"after":"reviewed_absence","summary":"Independent energy yield: Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-24","recorded_at_basis":"publisher_supplied_release_date","source_ids":["src_babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7","src_d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855","src_d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9","src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9"],"event_id":"chg_0d0e2be83b0519d3156097f6971b2ae155b1321ce83ee02d9f5145134c38abb6"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"market.AU.source_urls","field_label":"AU Evidence sources","before":["https://www.missionsolar.com/products/","https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"],"after":["https://www.missionsolar.com/our-brand/","https://www.missionsolar.com/products/","https://www.missionsolar.com/wp-content/uploads/2025/05/C-CTA-0017-MSE-PV-Module-Limited-Warranty-MSE-LLC-2.pdf","https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"],"summary":"AU Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"AU","valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_d257e8d269f18a5e14c5e672c0242ae16976c03adfd449f3a13820a87ed343d2"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"audit_rows.PID (IEC TS 62804).source_urls","field_label":"PID (IEC TS 62804): Evidence sources","before":[],"after":["https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"],"summary":"PID (IEC TS 62804): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_a755157c89d2c09b084685ca183ea3e87a6bdbdddd9ba790bb3e43afd35ddd33"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"market.US.source_urls","field_label":"US Evidence sources","before":["https://www.missionsolar.com/products/","https://www.missionsolar.com/wp-content/uploads/2025/05/C-CTA-0017-MSE-PV-Module-Limited-Warranty-MSE-LLC-2.pdf","https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"],"after":["https://www.missionsolar.com/our-brand/","https://www.missionsolar.com/products/","https://www.missionsolar.com/wp-content/uploads/2025/05/C-CTA-0017-MSE-PV-Module-Limited-Warranty-MSE-LLC-2.pdf","https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"],"summary":"US Evidence sources updated in the publication","scope":"market_overlay","jurisdiction":"US","valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_9ed9cd63348099e6a0abfc343f59a8b548711675decb7fa680937eefb50237ab"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"record.source_revision","field_label":"Source revision","before":"Mission Solar P-SA2-UM-0009 R2, released 2020-09-25, and C-CTA-0017 version 1, dated 2024-04-29, reviewed 2026-08-06","after":"Mission Solar M6 manual P-SA2-UM-0009 R2, warranty C-CTA-0017 version 1 and current company record, rechecked 2026-08-22","summary":"Source revision updated in the publication","scope":"product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_74f56a9e5685d6d03538e98f0cb732df33169a039f448c5cfa785710f57fb2de"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"benchmark.ranges","field_label":"Ranges","before":[{"checked":"2026-08-06","market":"US","max":425,"min":405,"range_label":"405–425 W","source_revision":"Mission Solar P-SA2-UM-0009 R2, exact SX6S 405-425 W table","source_url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf","unit":"W"}],"after":[{"checked":"2026-08-22","market":"US","max":425,"min":405,"range_label":"405–425 W","source_revision":"Mission Solar M6 manual P-SA2-UM-0009 R2 and warranty C-CTA-0017 version 1, rechecked 2026-08-22","source_url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf","unit":"W"}],"summary":"Ranges updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_6af65b1684bcb675868568875932efa38c84336fc09a4c30f64dab24a3d01906"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"audit_rows.Manufacturing track record.source_urls","field_label":"Manufacturing track record: Evidence sources","before":[],"after":["https://www.missionsolar.com/our-brand/"],"summary":"Manufacturing track record: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296"],"event_id":"chg_3de94eb576cd63f33dc6754de515e8738d3793fb87df3b48bb7916fe05c96648"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"audit_rows.Fire classification (IEC 61730).evidence_status","field_label":"Fire classification (IEC 61730): Evidence status","before":"sourced","after":"reviewed_absence","summary":"Fire classification (IEC 61730): Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_1c149386c673c187afa78dbbfdf6e0cf80f864f04c8d5e632edc241881ea35d1"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"benchmark.source","field_label":"Source","before":{"checked":"2026-08-06","source_revision":"Mission Solar P-SA2-UM-0009 R2, exact SX6S 405-425 W table","source_url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"},"after":{"checked":"2026-08-22","source_revision":"Mission Solar M6 manual P-SA2-UM-0009 R2 and warranty C-CTA-0017 version 1, rechecked 2026-08-22","source_url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"},"summary":"Source updated in the publication","scope":"scored_benchmark","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_1320ac9004c3245fda3915a236b3acf3fdbb8ce8d38e148ff002b555d2b826d2"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"audit_rows.PID (IEC TS 62804).evidence_status","field_label":"PID (IEC TS 62804): Evidence status","before":"sourced","after":"reviewed_absence","summary":"PID (IEC TS 62804): Evidence status updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_0df76f0dc3f27a7bc7b23e0a2713aba5e97cb5ee79bd952e8c4c9a93fe9dd6a4"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"audit_rows.Fire classification (IEC 61730).source_urls","field_label":"Fire classification (IEC 61730): Evidence sources","before":[],"after":["https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf"],"summary":"Fire classification (IEC 61730): Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_0d5e6bf6c56c5c5b6bf6a4fb6635e1004e287d325da633a91699a3f859ec8a50"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_c96708c506bb45075da2bcac8a32583fb6d1ee97e306cff0fe837553ec4082fd","event_type":"field_changed","field_path":"audit_rows.Financial strength & warranty backing.source_urls","field_label":"Financial strength & warranty backing: Evidence sources","before":[],"after":["https://www.missionsolar.com/commercial/","https://www.missionsolar.com/our-brand/"],"summary":"Financial strength & warranty backing: Evidence sources updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-22","recorded_at_basis":"latest_changed_record_date","source_ids":["src_2e00017e201c8ebf79947074e0c807bf89e4ce52fad0c9716edcd81eed30e6c5","src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296"],"event_id":"chg_0126e58576bfe66afda784d3a21757a31881a40e147572894b9ff63f0ec3f2f5"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"score_precise","field_label":"Global score","before":52.3,"after":53,"summary":"Global score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_ea81627602a37f595307cca025f9c3c093f407c04dbaecb52047cc9009016cb2"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"pillars.Architecture & Design.score_precise","field_label":"Architecture & Design pillar score","before":58.8,"after":62.3,"summary":"Architecture & Design pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_73bbac7f27ca9098827fd12a88e3c800ff430823c1f4bfa668d842e57502b81d"},{"subject_id":"mission-solar-energy-mission-solar-mse-420-san-antonio-texas","release_id":"rel_9b56334b40e212d5b10d9ea9c5449d238a939effd413c553c0097ac8f222795d","event_type":"field_changed","field_path":"pillars.Durability (verified).score_precise","field_label":"Durability (verified) pillar score","before":47.9,"after":47.8,"summary":"Durability (verified) pillar score updated in the publication","scope":"scored_product_record","jurisdiction":null,"valid_from":null,"valid_to":null,"recorded_at":"2026-08-18","recorded_at_basis":"latest_changed_record_date","source_ids":["src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"],"event_id":"chg_3f6711f706646b7aa4196d9915991bd1d947da7e9958f9d700906fb45774caf5"}],"sources":[{"id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"},"content_fingerprint":null,"retrieval":null},{"id":"src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","url":"https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2026/08/202608031426164762.pdf","label":"IN market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441"},"content_fingerprint":null,"retrieval":null},{"id":"src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce","url":"https://mnre.gov.in/en/approved-list-of-models-and-manufacturers-almm/","label":"IN market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"},"content_fingerprint":null,"retrieval":null},{"id":"src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","url":"https://www.missionsolar.com/products/","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e"},"content_fingerprint":null,"retrieval":null},{"id":"src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","url":"https://www.missionsolar.com/our-brand/","label":"Financial strength & warranty backing","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296"},"content_fingerprint":null,"retrieval":null},{"id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","url":"https://www.missionsolar.com/wp-content/uploads/2025/05/C-CTA-0017-MSE-PV-Module-Limited-Warranty-MSE-LLC-2.pdf","label":"Guarantee period (yrs)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093"},"content_fingerprint":null,"retrieval":null},{"id":"src_babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7","url":"https://scorecard.pvel.com/wp-content/uploads/2022-PVEL-PV-Module-Reliability-Scorecard-Summary.pdf","label":"Independent energy yield","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7"},"content_fingerprint":null,"retrieval":null},{"id":"src_d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855","url":"https://scorecard.pvel.com/wp-content/uploads/2024-PV-Module-Reliability-Scorecard.pdf","label":"Independent energy yield","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855"},"content_fingerprint":null,"retrieval":null},{"id":"src_d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9","url":"https://scorecard.pvel.com/methodology/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9"},"content_fingerprint":null,"retrieval":null},{"id":"src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9","url":"https://scorecard.pvel.com/top-performers/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9"},"content_fingerprint":null,"retrieval":null},{"id":"src_2e00017e201c8ebf79947074e0c807bf89e4ce52fad0c9716edcd81eed30e6c5","url":"https://www.missionsolar.com/commercial/","label":"Financial strength & warranty backing","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"2e00017e201c8ebf79947074e0c807bf89e4ce52fad0c9716edcd81eed30e6c5"},"content_fingerprint":null,"retrieval":null}]},"approval_history":[],"sources":[{"id":"src_0ac079e6d9fc8562c8c4872459f6892a5868fdcf288346ecf731dcbeab02f424","url":"https://www.missionsolar.com/sustainability/","label":"End-of-life & recycling disclosure","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"0ac079e6d9fc8562c8c4872459f6892a5868fdcf288346ecf731dcbeab02f424"},"content_fingerprint":null,"retrieval":null},{"id":"src_2e00017e201c8ebf79947074e0c807bf89e4ce52fad0c9716edcd81eed30e6c5","url":"https://www.missionsolar.com/commercial/","label":"Financial strength & warranty backing","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"2e00017e201c8ebf79947074e0c807bf89e4ce52fad0c9716edcd81eed30e6c5"},"content_fingerprint":null,"retrieval":null},{"id":"src_34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e","url":"https://www.missionsolar.com/products/","label":"AU market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"34d1837e936f3c3160fc7f9c15ec169f81646d9d03f4a2a5953265e38857318e"},"content_fingerprint":null,"retrieval":null},{"id":"src_6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296","url":"https://www.missionsolar.com/our-brand/","label":"Financial strength & warranty backing","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"6152211525f025030fde640d9b974c3413a08245c50d0baac56b049efd6de296"},"content_fingerprint":null,"retrieval":null},{"id":"src_720802a453deb58ddf4507c9e63e74399e3761807b2511e40cad763093b0a7c1","url":"https://www.missionsolar.com/wp-content/uploads/2025/05/C-SA2-MKTG-0026-Data-Sheet-for-SX6W.pdf","label":"Salt mist (IEC 61701)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"720802a453deb58ddf4507c9e63e74399e3761807b2511e40cad763093b0a7c1"},"content_fingerprint":null,"retrieval":null},{"id":"src_7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093","url":"https://www.missionsolar.com/wp-content/uploads/2025/05/C-CTA-0017-MSE-PV-Module-Limited-Warranty-MSE-LLC-2.pdf","label":"Guarantee period (yrs)","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"7c8d7df5d5992e0871bd758d9a3e21c3aa359cdb1b9562eba263924d15f7d093"},"content_fingerprint":null,"retrieval":null},{"id":"src_8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441","url":"https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2026/08/202608031426164762.pdf","label":"IN market evidence","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"8d358e34dfbee3575d58737d19927240f841b3062d01ba061a6f97f000882441"},"content_fingerprint":null,"retrieval":null},{"id":"src_904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce","url":"https://mnre.gov.in/en/approved-list-of-models-and-manufacturers-almm/","label":"IN market evidence","source_type":"manufacturer","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"904c7b0620fd114ed94fdd04c1ef409aed291c017586b6f0ac73068144cae7ce"},"content_fingerprint":null,"retrieval":null},{"id":"src_babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7","url":"https://scorecard.pvel.com/wp-content/uploads/2022-PVEL-PV-Module-Reliability-Scorecard-Summary.pdf","label":"Independent energy yield","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"babe0b64dc54e657ae96ac57cb94feee2924cc57c01c945da43f104e18eb26a7"},"content_fingerprint":null,"retrieval":null},{"id":"src_bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b","url":"https://www.missionsolar.com/wp-content/uploads/2025/05/P-SA2-UM-0009-Module-Installation-and-User-Manual-for-M6-Series.pdf","label":"Primary datasheet","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"bbdaba9ea108f25efa9996e01621b79b07b23b49612d8b2f9018c7f1e19c3c8b"},"content_fingerprint":null,"retrieval":null},{"id":"src_d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855","url":"https://scorecard.pvel.com/wp-content/uploads/2024-PV-Module-Reliability-Scorecard.pdf","label":"Independent energy yield","source_type":"datasheet","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d6a3fe48288aceb71d7877a4264d9ed1b985cc598b44e40e066505dc43dfa855"},"content_fingerprint":null,"retrieval":null},{"id":"src_d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9","url":"https://scorecard.pvel.com/methodology/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"d8368cb8b6b289755050f62dc21c8ac03dc9b5ae857e631bc57ae8894b031ec9"},"content_fingerprint":null,"retrieval":null},{"id":"src_f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9","url":"https://scorecard.pvel.com/top-performers/","label":"Independent energy yield","source_type":"test_report","source_type_basis":"authored_display_type_or_url_heuristic","publisher":null,"licence":{"status":"unresolved","name":null,"url":null,"attribution":null,"permissions":{"display":null,"cache":null,"redistribute":null,"derive":null,"ai_use":null}},"locator_fingerprint":{"kind":"locator_sha256","sha256":"f572171754a8b8824442f1d3c7d09588f4985918b60f4807c5a3d49d7daed0d9"},"content_fingerprint":null,"retrieval":null}],"boundaries":{"rights":"An unresolved licence field is not permission to cache, redistribute, derive from, or use a source for AI.","history":"Evidence events record verification activity. Change-history events separately record accepted before-and-after publication changes.","change_history":"Events record accepted publication changes, not every evidence re-check or a claim that the product changed on that date.","change_validity":"valid_from and valid_to remain null unless a source establishes when the changed fact applied in the world.","change_scope":"Compatibility, system pairing, suitability and relative leaderboard prose are excluded.","applicability":"Market evidence does not establish stock, system compatibility, network approval, installation suitability, or approval of an earlier installation.","approval_history":"Approval history contains exact, score-neutral source-register links recorded since monitoring began. It is not a complete lifetime history."}}