| Outcome | Available in Australia | Available in Australia |
|---|
| Checked | 2026-08-27 | 2026-08-29 |
|---|
| Certifications | Current CER HiOne system combinations use the exact HiOne battery layer, approved 13 August 2026 and expiring 31 December 2027. | The exact BAT-10.1P datasheet lists IEC 62619, IEC 63056, IEC 62040 and UN 38.3; the SMILE-G3-S5 AU system datasheet lists AS 4777.2 and IEC 62109. |
|---|
| Warranty scope | Australia; the current warranty names HiOne-8B-G3 for ten years, 70% retention or 23.613 MWh per module, whichever limit occurs first. | Australia; the 11 October 2024 warranty names SMILE-G3-S5 and BAT-10.1P with a ten-year term, 70% retained capacity and a 3.12 MWh/kWh throughput condition for eligible installations from 1 November 2024. |
|---|
| Warranty remedy | Hoymiles may repair or replace accepted defective hardware. | Repair or replacement at AlphaESS's option. |
|---|
| Labour and reinstallation | Ordinary installation, commissioning and technician labour is excluded unless separately authorized. Removal and reinstallation are not promised. | Installer travel and on-site labour are excluded. Removal and reinstallation are not promised. |
|---|
| Freight | Return and replacement logistics are conditional on the approved claim process. | Replacement-parts freight is covered for an accepted claim. |
|---|
| Transfer and registration | Transfer at the original installation site requires Hoymiles authorization by email. Serial, installation and operating evidence are required. | The warranty is non-transferable except where the products remain installed in a building, in which case it transfers to a later purchaser of that building. Serial registration before a claim, and installation by an SAA-accredited installer with a valid Alpha Installer ID, are required. |
|---|
| Grid/network approval evidence | The exact battery identity appears in the current Australian battery export. Inverter selection, DNSP acceptance and system design remain separate installation decisions. | The exact AU system is a 5 kW, 230 V single-phase hybrid under AS 4777.2. Current project approval and installer eligibility remain installation-specific. |
|---|
| Local product pathway | No separate local pathway recorded | No separate local pathway recorded |
|---|
| Buyer evidence | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. |
|---|
| Safety notice | No model-specific notice recorded | No model-specific notice recorded |
|---|
| Review note | The technical family supports one to six modules. The score uses one 7.24 kWh usable module. CER system rows publish rounded 7.8 kWh per 8B block, while the governing warranty publishes 7.24 kWh at 90% DoD; both facts remain labelled rather than merged. | AlphaESS's current 2026 Australian brochure lists SMILE-G3-S5/B5 with both BAT-10.1P and BAT-9.3S. The battery options coexist; neither is presented as the formal successor to the other. |
|---|
| Register: parts term | Not in the structured register | Not in the structured register |
|---|
| Register: labour and service | Not in the structured register | Not in the structured register |
|---|
| Register: transport and freight | Not in the structured register | Not in the structured register |
|---|
| Register: registration | Not in the structured register | Not in the structured register |
|---|
| Register: transferability | Not in the structured register | Not in the structured register |
|---|
| Register: explicit unknowns | Not in the structured register | Not in the structured register |
|---|
| Latest reviewed Approval Watch event | No exact-identity event in reviewed history | No exact-identity event in reviewed history |
|---|
| Sources | Source 1Source 2Source 3Source 4 | Source 1Source 2Source 3Source 4Source 5 |
|---|