SigenStor EC TP
Sigenergy
76/ 100
Strong evidence coverage · 100%
Evidence checked 2026-08-02
Available in Australia · checked 2026-08-02
Buyer evidence: Ready (100% direct coverage).
Compare like with like. Aligned scores, specifications and local evidence within one scoring class or tier.
Market context
Australia purchasing view
Sigenergy
76/ 100
Strong evidence coverage · 100%
Evidence checked 2026-08-02
Available in Australia · checked 2026-08-02
Buyer evidence: Ready (100% direct coverage).
GoodWe
81/ 100
Strong evidence coverage · 100%
Evidence checked 2026-08-02
Available in Australia · checked 2026-08-02
Buyer evidence: Ready (100% direct coverage).
| Measure | SigenStor EC TP | ET G2 |
|---|---|---|
| Efficiency | ||
| Design & Flexibility | ||
| Thermal & Physical Resilience | ||
| Features & Integration | ||
| Safety & Compliance | ||
| Guarantee & Backbone | ||
| Energy Ecosystem |
| Measure | SigenStor EC TP | ET G2 |
|---|---|---|
| Published rated AC power range | 5–12 kW | 6–15 kW |
| Scored benchmark | 12 kW | 15 kW |
| Power | 12.0 kW | 15.0 kW |
| Type | Hybrid | Hybrid |
| Peak eff | 98.3 % | 98.2 % |
| MPPTs | 3 | 3 |
| Evidence | SigenStor EC TP | ET G2 |
|---|---|---|
| Outcome | Available in Australia | Available in Australia |
| Checked | 2026-08-02 | 2026-08-02 |
| Certifications | IEC 62109.1, IEC 62109.2, AS/NZS 4777.2:2020 | The Australian CEC approved-inverter export dated 22 July 2026 lists exact GW6000-ET-20, GW8000-ET-20, GW9900-ET-20, GW12K-ET-20 and GW15K-ET-20 models to AS/NZS 4777.2:2020 through 29 October 2027., The exact system manual lists IEC 62109-1/-2 and multiple national grid codes. |
| Warranty scope | Australia and New Zealand; the Sigen Energy Controller has a ten-year warranty and the specific-model list covers the SigenStor EC 5.0-12.0 TP AU family, notwithstanding typographical inconsistencies in the table. | Australia and New Zealand; GoodWe's current Rev 5.8 limited warranty explicitly places ET G2 under 10 years of cover for eligible products. |
| Warranty remedy | Configuration repair, software update, parts repair or functionally equivalent replacement at Sigenergy discretion. | Configuration change, repair or replacement at GoodWe's discretion. |
| Labour and reinstallation | Onsite repair, removal and reinstallation labour are covered. Covered as onsite labour, subject to the validated claim process. | GoodWe may provide authorised on-site service or a conditional service rebate. On-site labour support is conditional and requires prior authorisation. |
| Freight | Normal ground freight, customs duties and return freight are covered. | Normal ground transport is covered up to GoodWe's stated case limit. |
| Transfer and registration | Transfer is permitted at the original installation site. The term begins from installation and registration, invoice evidence, or the fallback manufacturing-date rule. | No express subsequent-owner transfer right was found in the governing terms. The standard ET G2 term is listed as 10 years; claim and monitoring conditions in the governing terms still apply. |
| Grid compatibility | The CEC lists the exact SigenStor EC 12.0 TP AU as a three-phase PV-and-battery grid-connect inverter under certificate EESS-240671-0, with a listed expiry of 7 April 2028 when checked. | Three-phase 380/400 V hybrid family with exact-model CEC listings. DNSP acceptance, export settings, battery pairing and backup design remain installation-specific. |
| System fit | Confirmed: SigenStor BAT 5.0 / BAT 8.0 | Confirmed: GoodWe Lynx Home F G2 |
| Local product pathway | No separate local pathway recorded | No separate local pathway recorded |
| Buyer evidence | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. |
| Safety notice | No model-specific notice recorded | No model-specific notice recorded |
| Review note | The 12.0 TP AU is the scored benchmark for this 5-12 kW family. CEC listings are dynamic. Verify current approval, network export settings, compatible battery stack, gateway configuration and warranty coverage immediately before installation. | The 15 kW GW15K-ET-20 is the scored series benchmark. CEC listings are dynamic and should be checked before installation. |
| Sources | Source 1Source 2Source 3 | Source 1Source 2Source 3Source 4Source 5 |
These checks sit beside the benchmark score. They are site, tariff and contract questions that no product score can settle.
Ask for every model number to appear on the quote and order. The Clean Energy Council product lists are live: STC creation requires listed products at installation, and network requirements may also depend on current approval.
Have the retailer state the supply phase, inverter connection limit, export limit and any export-control cost. The local network connection agreement, not a generic datasheet, determines those settings. See the Australian Government's connection guidance.
Ask which bills or interval data, tariff, feed-in rate, export limit and future loads support the savings and payback claim. Self-consumed electricity and tariff timing usually matter more than a headline feed-in rate. See the system sizing and battery savings guidance.
Confirm the proposed inverter phase, PV input design, battery pairing and export-control configuration against the final connection agreement. A suitable product can still require a different site design or control setting.
Keep the retailer, installer, manufacturer warranty and escalation path in the contract. Australian Consumer Law guarantees apply separately from any manufacturer warranty; where one business supplied both product and installation, it is generally responsible for the remedy. See the ACCC guidance.
A score lead is only meaningful inside this shared class or tier. Weigh it against the specification and evidence rows above before deciding.
Both products are scored in the Inverter class, on the same rubric weighting. Scores are not comparable across classes or tiers. Full methodology.