S6-GR1P
Solis
62/ 100
Strong evidence coverage · 100%
Evidence checked 2026-08-02
Available in Australia · checked 2026-08-02
Buyer evidence: Ready (100% direct coverage).
Compare like with like. Aligned scores, specifications and local evidence within one scoring class or tier.
Market context
Australia purchasing view
Solis
62/ 100
Strong evidence coverage · 100%
Evidence checked 2026-08-02
Available in Australia · checked 2026-08-02
Buyer evidence: Ready (100% direct coverage).
GoodWe
68/ 100
Strong evidence coverage · 100%
Evidence checked 2026-08-02
Available in Australia · checked 2026-08-02
Buyer evidence: Ready (100% direct coverage).
| Measure | S6-GR1P | DNS G3 |
|---|---|---|
| Efficiency | ||
| Design & Flexibility | ||
| Thermal & Physical Resilience | ||
| Features & Integration | ||
| Safety & Compliance | ||
| Guarantee & Backbone | ||
| Energy Ecosystem |
| Measure | S6-GR1P | DNS G3 |
|---|---|---|
| Published rated AC power range | 3–6 kW | Not stated |
| Scored benchmark | 6 kW | 6 kW |
| Power | 6.0 kW | 6.0 kW |
| Type | String | String |
| Peak eff | 97.7 % | 97.9 % |
| MPPTs | 2 | 2 |
| Published maximum AC output range | Not stated | 3–6 kW |
| Evidence | S6-GR1P | DNS G3 |
|---|---|---|
| Outcome | Available in Australia | Available in Australia |
| Checked | 2026-08-02 | 2026-08-02 |
| Certifications | The exact Australian datasheet publishes AS/NZS 4777.2:2020 and IEC 62109-1/-2 compliance. | The exact Australian datasheet publishes IEC 62109 and AS/NZS 4777.2 compliance. |
| Warranty scope | Five-year standard limited warranty plus a further five years for eligible units purchased from 1 January 2024 when registered and kept connected to SolisCloud, subject to the published terms. | Australia; GoodWe's standard terms provide five years of full inverter cover plus a further five years of replacement-parts cover for eligible DNS G3 units, subject to registration and terms. |
| Warranty remedy | Repair, replacement, refund or credit at Solis's option. | Repair, parts supply or replacement at GoodWe's option. |
| Labour and reinstallation | Removal and installation labour are excluded unless separately agreed. Removal and reinstallation are excluded unless separately agreed. | Service rebates are conditional and not full-term labour cover. Removal and reinstallation are not an unconditional entitlement. |
| Freight | Transport is excluded unless separately agreed. | Ground freight is conditional and capped. |
| Transfer and registration | No automatic transfer right was found; any transfer requires Solis's written approval. The further five years require SolisCloud; paid 10, 15 and 20-year options are available. | No subsequent-owner transfer right was found in the governing terms. The further five-year parts period requires eligible installation, registration and SEMS connection. |
| Grid compatibility | Single-phase Australian grid-tied family with AS/NZS 4777.2:2020 compliance. | Single-phase 230 V Australian string-inverter family with AS/NZS 4777.2 compliance. |
| System fit | No exact product pairing recorded | No exact product pairing recorded |
| Local product pathway | No separate local pathway recorded | No separate local pathway recorded |
| Buyer evidence | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. |
| Safety notice | No model-specific notice recorded | No model-specific notice recorded |
| Review note | Solis Australasia publishes the exact family datasheet, manual, certificates and local support contacts. | GoodWe Australia publishes the exact DNS G3 family and local warranty terms. |
| Sources | Source 1Source 2Source 3Source 4 | Source 1Source 2Source 3Source 4 |
These checks sit beside the benchmark score. They are site, tariff and contract questions that no product score can settle.
Ask for every model number to appear on the quote and order. The Clean Energy Council product lists are live: STC creation requires listed products at installation, and network requirements may also depend on current approval.
Have the retailer state the supply phase, inverter connection limit, export limit and any export-control cost. The local network connection agreement, not a generic datasheet, determines those settings. See the Australian Government's connection guidance.
Ask which bills or interval data, tariff, feed-in rate, export limit and future loads support the savings and payback claim. Self-consumed electricity and tariff timing usually matter more than a headline feed-in rate. See the system sizing and battery savings guidance.
Confirm the proposed inverter phase, PV input design, battery pairing and export-control configuration against the final connection agreement. A suitable product can still require a different site design or control setting.
Keep the retailer, installer, manufacturer warranty and escalation path in the contract. Australian Consumer Law guarantees apply separately from any manufacturer warranty; where one business supplied both product and installation, it is generally responsible for the remedy. See the ACCC guidance.
A score lead is only meaningful inside this shared class or tier. Weigh it against the specification and evidence rows above before deciding.
Both products are scored in the Value & Volume class, on the same rubric weighting. Scores are not comparable across classes or tiers. Full methodology.