| Outcome | Available in Australia | Available in Australia |
|---|
| Checked | 2026-08-02 | 2026-08-29 |
|---|
| Certifications | BAT-521 lists B500 at 4.96 kWh nominal and 4.46 kWh usable, approved 27 May 2024 and expiring 27 May 2027., EESS-230794-1 lists EP760, approved 29 April 2024 and expiring 29 April 2027. | The exact BAT-10.1P datasheet lists IEC 62619, IEC 63056, IEC 62040 and UN 38.3; the SMILE-G3-S5 AU system datasheet lists AS 4777.2 and IEC 62109. |
|---|
| Warranty scope | Ten years or the configuration throughput cap, whichever occurs first, with a 70% retained-capacity endpoint. | Australia; the 11 October 2024 warranty names SMILE-G3-S5 and BAT-10.1P with a ten-year term, 70% retained capacity and a 3.12 MWh/kWh throughput condition for eligible installations from 1 November 2024. |
|---|
| Warranty remedy | Repair, replacement or another remedy is provided at BLUETTI's discretion under the governing terms. | Repair or replacement at AlphaESS's option. |
|---|
| Labour and reinstallation | Unconditional full-term site labour coverage was not established and is not credited. Removal and reinstallation are not treated as an unconditional entitlement. | Installer travel and on-site labour are excluded. Removal and reinstallation are not promised. |
|---|
| Freight | Valid-claim logistics are addressed by the warranty, but unconditional coverage of every transport cost is not credited. | Replacement-parts freight is covered for an accepted claim. |
|---|
| Transfer and registration | An automatic transfer right was not established in the reviewed governing document. Certified installation and notice within 30 days of discovering a fault are stated claim conditions. | The warranty is non-transferable except where the products remain installed in a building, in which case it transfers to a later purchaser of that building. Serial registration before a claim, and installation by an SAA-accredited installer with a valid Alpha Installer ID, are required. |
|---|
| Grid/network approval evidence | Single-phase EP760 hybrid inverter with exact Australian approval. DNSP settings, export limits and backed circuits remain site-specific. | The exact AU system is a 5 kW, 230 V single-phase hybrid under AS 4777.2. Current project approval and installer eligibility remain installation-specific. |
|---|
| Local product pathway | No separate local pathway recorded | No separate local pathway recorded |
|---|
| Buyer evidence | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. |
|---|
| Safety notice | No model-specific notice recorded | No model-specific notice recorded |
|---|
| Review note | This record includes EP760 with two to four B500 modules only. B500A, one-module, five-module, six-module, VPP and generator claims are outside the exact reviewed boundary. | AlphaESS's current 2026 Australian brochure lists SMILE-G3-S5/B5 with both BAT-10.1P and BAT-9.3S. The battery options coexist; neither is presented as the formal successor to the other. |
|---|
| Register: parts term | Not in the structured register | Not in the structured register |
|---|
| Register: labour and service | Not in the structured register | Not in the structured register |
|---|
| Register: transport and freight | Not in the structured register | Not in the structured register |
|---|
| Register: registration | Not in the structured register | Not in the structured register |
|---|
| Register: transferability | Not in the structured register | Not in the structured register |
|---|
| Register: explicit unknowns | Not in the structured register | Not in the structured register |
|---|
| Latest reviewed Approval Watch event | No exact-identity event in reviewed history | No exact-identity event in reviewed history |
|---|
| Sources | Source 1Source 2Source 3Source 4Source 5Source 6Source 7Source 8 | Source 1Source 2Source 3Source 4Source 5Source 6 |
|---|