How to read a state
The record carries a direct or derived source for the exact product.
2,490 criterion records
The exact document was checked and did not publish the qualifying detail. This is evidence of non-disclosure, not proof the capability is missing.
661 criterion records
The criterion is not a property of this product form.
21 criterion records
The question is not established by any reviewed source.
432 criterion records
What the cohort publishes
Backup behaviour
Separates a backup label from the published switching, output and grid-forming behaviour behind it.
- Buying question
- What continues operating, at what output, through which hardware, and under which phase and duration limits?
- Evidence boundary
- A published backup capability is not a site design. Protected circuits, phase balance, motor starts and network requirements remain installation-specific.
| Question | Published share | Evidence states |
|---|---|---|
| Backup switching speed | 27Published4Reviewed absence0Not applicable31Open | |
| Backup surge / motor-start capability | 34Published4Reviewed absence0Not applicable22Open | |
| Continuous power output (kW) | 53Published3Reviewed absence0Not applicable4Open | |
| Grid-forming & backup tier | 34Published0Reviewed absence0Not applicable15Open | |
| Backup / islanding | 37Published0Reviewed absence0Not applicable1Open | |
| Backup behaviour attribution | Not a property of this product form | 0Published0Reviewed absence16Not applicable0Open |
| Backup device | 16Published0Reviewed absence0Not applicable0Open | |
| Black start | 5Published9Reviewed absence0Not applicable0Open | |
| Backup phase boundary | 12Published0Reviewed absence0Not applicable0Open | |
| Outage PV recharge | 4Published7Reviewed absence0Not applicable0Open | |
| Offline cloud boundary | 7Published3Reviewed absence0Not applicable0Open | |
| Backup boundary | 2Published0Reviewed absence0Not applicable0Open | |
| Backup scope | 2Published0Reviewed absence0Not applicable0Open | |
| Backup attribution | 1Published0Reviewed absence0Not applicable0Open | |
| Backup output | 1Published0Reviewed absence0Not applicable0Open | |
| Backup peak output (1 s) | 1Published0Reviewed absence0Not applicable0Open | |
| Backup peak output (30 s) | 1Published0Reviewed absence0Not applicable0Open | |
| Gateway backup limit | 0Published0Reviewed absence0Not applicable1Open | |
| Gateway backup scope | 1Published0Reviewed absence0Not applicable0Open | |
| Gateway transfer time | 1Published0Reviewed absence0Not applicable0Open | |
| Load-start capability | 1Published0Reviewed absence0Not applicable0Open |
Digital ownership
Tracks local protocols, cloud services, firmware disclosure and connected-home control as separate operating dependencies.
- Buying question
- What still works locally if the internet, installer account or manufacturer cloud is unavailable?
- Evidence boundary
- An app is not evidence of local control. A protocol is credited only when its published scope reaches the exact product or named control layer.
| Question | Published share | Evidence states |
|---|---|---|
| Firmware & security disclosure | 51Published14Reviewed absence0Not applicable22Open | |
| Open protocol & API maturity | 48Published8Reviewed absence0Not applicable31Open | |
| Smart home & IoT depth | 28Published20Reviewed absence0Not applicable39Open | |
| VPP & grid services readiness | 42Published9Reviewed absence0Not applicable36Open | |
| Control plane | 64Published0Reviewed absence0Not applicable0Open | |
| Data handling boundary | 3Published61Reviewed absence0Not applicable0Open | |
| Local API | 23Published41Reviewed absence0Not applicable0Open | |
| Offline operation | 9Published55Reviewed absence0Not applicable0Open | |
| Subscription boundary | 3Published61Reviewed absence0Not applicable0Open | |
| Firmware and security evidence | 53Published10Reviewed absence0Not applicable0Open | |
| Firmware support horizon | 0Published51Reviewed absence0Not applicable0Open | |
| Monitoring & smart features | 38Published0Reviewed absence0Not applicable0Open | |
| Commissioning | 29Published0Reviewed absence0Not applicable0Open | |
| Cloud API | 13Published8Reviewed absence0Not applicable0Open | |
| Security disclosure | 0Published2Reviewed absence0Not applicable0Open | |
| Local access | 1Published0Reviewed absence0Not applicable0Open |
Battery behaviour
Reads capacity beside efficiency basis, power duration, thermal protection, cell disclosure and warranty degradation conditions.
- Buying question
- How much energy and power are usable, under what conditions, and what operating detail is withheld?
- Evidence boundary
- Published specifications are not independent field measurements. Where a source gives no test basis or duration, the record preserves that limitation.
| Question | Published share | Evidence states |
|---|---|---|
| Cell balancing architecture | 6Published21Reviewed absence0Not applicable22Open | |
| Cell provenance & traceability | 20Published19Reviewed absence0Not applicable10Open | |
| Continuous power output (kW) | 45Published0Reviewed absence0Not applicable4Open | |
| Cycle life (cycles to 70%) | 6Published42Reviewed absence0Not applicable1Open | |
| End-of-warranty retained capacity (%) | 47Published0Reviewed absence0Not applicable2Open | |
| Modularity & scalability | 49Published0Reviewed absence0Not applicable0Open | |
| Operating temperature range | 46Published0Reviewed absence0Not applicable3Open | |
| Round-trip efficiency (%) | 10Published38Reviewed absence0Not applicable1Open | |
| Thermal & fire mitigation | 42Published2Reviewed absence0Not applicable5Open | |
| Usable energy / DoD (%) | 46Published0Reviewed absence0Not applicable3Open | |
| Verified reliability | 2Published26Reviewed absence0Not applicable21Open | |
| Warranty degradation guarantee | 47Published0Reviewed absence0Not applicable2Open | |
| Warranty throughput | 45Published3Reviewed absence0Not applicable1Open | |
| Standby consumption | 1Published36Reviewed absence0Not applicable0Open | |
| Exact configuration | 36Published0Reviewed absence0Not applicable0Open | |
| Usable energy basis | 28Published0Reviewed absence0Not applicable3Open | |
| Power basis | 18Published0Reviewed absence0Not applicable0Open | |
| Operating derating | 12Published0Reviewed absence0Not applicable0Open | |
| Published cycle-life boundary | 11Published0Reviewed absence0Not applicable0Open | |
| Cycle life endpoint | 0Published6Reviewed absence0Not applicable3Open | |
| Round-trip efficiency (DC) | 7Published0Reviewed absence0Not applicable0Open | |
| Cycle life basis | 5Published0Reviewed absence0Not applicable0Open | |
| Round-trip efficiency path | 5Published0Reviewed absence0Not applicable0Open | |
| AC backup behaviour | Not a property of this product form | 0Published0Reviewed absence3Not applicable0Open |
| Round-trip efficiency (AC) | 3Published0Reviewed absence0Not applicable0Open | |
| Source access | 0Published0Reviewed absence0Not applicable3Open | |
| Exact model identity | 2Published0Reviewed absence0Not applicable0Open | |
| Thermal management | 2Published0Reviewed absence0Not applicable0Open | |
| Warranty performance | 1Published0Reviewed absence0Not applicable1Open | |
| Capacity and power boundary | 1Published0Reviewed absence0Not applicable0Open | |
| Capacity identity boundary | 1Published0Reviewed absence0Not applicable0Open | |
| Evidence correction | 0Published0Reviewed absence0Not applicable1Open | |
| Minimum configuration | 0Published0Reviewed absence0Not applicable1Open | |
| Product identity | 0Published0Reviewed absence0Not applicable1Open | |
| UL 9540A status | 0Published0Reviewed absence0Not applicable1Open | |
| Usable energy correction | 0Published0Reviewed absence0Not applicable1Open |
Inverter operating envelope
Keeps conversion efficiency, MPPT architecture, input-current limits, array headroom and thermal derating on their published measurement boundaries.
- Buying question
- Which electrical and temperature limits apply to this exact inverter, and which numbers describe a different architecture or timed operating mode?
- Evidence boundary
- These are product limits, not an array design or equipment-pairing approval. String voltage, current, protection, network and site conditions remain design-specific.
| Question | Published share | Evidence states |
|---|---|---|
| Max DC:AC oversizing ratio | 36Published0Reviewed absence0Not applicable2Open | |
| Max input current per MPPT (A) | 37Published0Reviewed absence1Not applicable0Open | |
| Number of MPPTs | 37Published0Reviewed absence1Not applicable0Open | |
| Operating temperature range | 38Published0Reviewed absence0Not applicable0Open | |
| Peak efficiency (%) | 38Published0Reviewed absence0Not applicable0Open | |
| Thermal management | 38Published0Reviewed absence0Not applicable0Open | |
| Weighted efficiency (CEC/Euro %) | 37Published0Reviewed absence0Not applicable1Open | |
| Electrical architecture | 36Published0Reviewed absence0Not applicable0Open | |
| MPPT voltage window | 1Published0Reviewed absence0Not applicable0Open | |
| Output overload boundary | 1Published0Reviewed absence0Not applicable0Open | |
| Short-circuit current limit | 1Published0Reviewed absence0Not applicable0Open | |
| Thermal derating | 1Published0Reviewed absence0Not applicable0Open |
Panel durability
Separates exact-series environmental and reliability evidence from generic certification or brand-level claims.
- Buying question
- Which stress tests, loads and independent observations explicitly include the exact module family?
- Evidence boundary
- Passing a qualification test does not predict every installation. Generic brand certificates are not assigned to a model unless their published scope includes it.
| Question | Published share | Evidence states |
|---|---|---|
| Ammonia resistance (IEC 62716) | 14Published8Reviewed absence0Not applicable11Open | |
| Carbon footprint / EPD | 10Published10Reviewed absence0Not applicable13Open | |
| Damp heat extended (2000h) | 0Published0Reviewed absence0Not applicable33Open | |
| Fire classification (IEC 61730) | 29Published1Reviewed absence0Not applicable3Open | |
| Hail resistance | 23Published1Reviewed absence0Not applicable9Open | |
| Independent energy yield | 24Published9Reviewed absence0Not applicable0Open | |
| Negative loading (MQT16, Pa) | 32Published0Reviewed absence0Not applicable1Open | |
| PID (IEC TS 62804) | 13Published9Reviewed absence0Not applicable11Open | |
| Positive loading (MQT16, Pa) | 32Published0Reviewed absence0Not applicable1Open | |
| Salt mist (IEC 61701) | 16Published7Reviewed absence0Not applicable10Open | |
| Verified reliability | 6Published13Reviewed absence0Not applicable14Open | |
| Exact-family evidence gaps | 0Published22Reviewed absence0Not applicable0Open | |
| Mechanical load | 21Published0Reviewed absence0Not applicable0Open | |
| Salt mist and ammonia | 3Published0Reviewed absence0Not applicable3Open | |
| Reliability qualification | 3Published0Reviewed absence0Not applicable1Open | |
| PID, salt mist and ammonia | 3Published0Reviewed absence0Not applicable0Open | |
| Damp heat and thermal cycling | 1Published0Reviewed absence0Not applicable0Open | |
| Fire qualification | 0Published1Reviewed absence0Not applicable0Open | |
| Product carbon claim | 1Published0Reviewed absence0Not applicable0Open |
Service reality
Reads the warranty term beside remedy, labour, freight, removal, registration and transfer conditions for Australia.
- Buying question
- Who must act, what costs remain with the owner, and what does the governing Australian document actually promise?
- Evidence boundary
- Warranty wording does not measure actual service quality, response time or replacement-stock availability unless those commitments are expressly published.
| Question | Published share | Evidence states |
|---|---|---|
| Labour | 116Published2Reviewed absence0Not applicable2Open | |
| Registration conditions | 115Published3Reviewed absence0Not applicable2Open | |
| Remedy | 116Published2Reviewed absence0Not applicable2Open | |
| Removal and reinstallation | 115Published2Reviewed absence0Not applicable3Open | |
| Transferability | 113Published4Reviewed absence0Not applicable3Open | |
| Transport and freight | 116Published2Reviewed absence0Not applicable2Open | |
| Direct claim route | 11Published0Reviewed absence0Not applicable0Open | |
| Support response target | 11Published0Reviewed absence0Not applicable0Open | |
| Conditional service rebate | 7Published0Reviewed absence0Not applicable0Open | |
| Service rebate payment target | 7Published0Reviewed absence0Not applicable0Open | |
| Service rebate schedule | 0Published0Reviewed absence0Not applicable7Open | |
| Replacement dispatch target | 6Published0Reviewed absence0Not applicable0Open | |
| Discontinuation notice | 5Published0Reviewed absence0Not applicable0Open | |
| Governing warranty | 4Published0Reviewed absence0Not applicable1Open | |
| Post-warranty spare parts | 5Published0Reviewed absence0Not applicable0Open | |
| Post-warranty service | 4Published0Reviewed absence0Not applicable0Open | |
| Warranty counterparty | 1Published1Reviewed absence0Not applicable2Open | |
| AU approval window | 3Published0Reviewed absence0Not applicable0Open | |
| Service address | 0Published0Reviewed absence0Not applicable3Open | |
| Conditional labour reimbursement | 2Published0Reviewed absence0Not applicable0Open | |
| Replacement condition | 2Published0Reviewed absence0Not applicable0Open | |
| Support availability | 2Published0Reviewed absence0Not applicable0Open | |
| Uncollected repair condition | 2Published0Reviewed absence0Not applicable0Open | |
| Australian service entities | 1Published0Reviewed absence0Not applicable0Open | |
| Conditional test freight | 1Published0Reviewed absence0Not applicable0Open | |
| Discontinued product remedy | 1Published0Reviewed absence0Not applicable0Open | |
| Document conflict | 1Published0Reviewed absence0Not applicable0Open | |
| Exact AU model set | 1Published0Reviewed absence0Not applicable0Open | |
| Manufacturer table conflict | 1Published0Reviewed absence0Not applicable0Open | |
| Warranty claim route | 0Published1Reviewed absence0Not applicable0Open |
The research contract
Exact scope
Product, model family, market and document scope must align before a claim is attached.
Primary evidence
Manufacturer manuals, governing warranty terms, certification bodies and regulators lead the record.
No system approval
Product behaviour does not establish array design, equipment selection, network acceptance or installation compliance.
A missing disclosure is recorded, not repaired with an assumption. New products and stronger documents update this page on the next benchmark build.