Side-by-side

Compare

Compare like with like. Aligned scores, specifications and local evidence within one scoring class or tier.

Market context

Australia purchasing view

Performance & Value

Single Phase 59.6–57.6 kWh

NeoVolt | BW-INV-SPH5K with one BW-BAT-10.1P; 5 kW single-phase hybrid and 9.6 kWh usable scored reference

LFPAll-in-oneSingle-phase

63/ 100

Good

Strong evidence coverage · 100%

Evidence checked 2026-09-04

Available in Australia · checked 2026-08-02

Buyer evidence: Ready (100% direct coverage).

LFP
Full scorecard
Performance & Value

Smile G3 S5 / BAT-10.1P9.6–57.6 kWh

AlphaESS | SMILE-G3-S5 with one SMILE-G3-BAT-10.1P; 9.6 kWh usable reference, 1-6 modules

LFPAll-in-oneSingle-phase

67/ 100

Very good

Strong evidence coverage · 100%

Evidence checked 2026-09-01

Available in Australia · checked 2026-08-29

Buyer evidence: Ready (100% direct coverage).

LFPVPP-Ready
Full scorecard
Side by side

Score profile

MeasureSingle Phase 5Smile G3 S5 / BAT-10.1P
Capacity & Usability81 / 10082 / 100
Power & Efficiency58 / 10062 / 100
Longevity (verified)64 / 10065 / 100
Safety & Chemistry78 / 10075 / 100
Guarantee & Backbone43 / 10062 / 100
Energy Ecosystem51 / 10058 / 100

Capacity & Usability

Single Phase 5
81 / 100
Smile G3 S5 / BAT-10.1P
82 / 100

Power & Efficiency

Single Phase 5
58 / 100
Smile G3 S5 / BAT-10.1P
62 / 100

Longevity (verified)

Single Phase 5
64 / 100
Smile G3 S5 / BAT-10.1P
65 / 100

Safety & Chemistry

Single Phase 5
78 / 100
Smile G3 S5 / BAT-10.1P
75 / 100

Guarantee & Backbone

Single Phase 5
43 / 100
Smile G3 S5 / BAT-10.1P
62 / 100

Energy Ecosystem

Single Phase 5
51 / 100
Smile G3 S5 / BAT-10.1P
58 / 100
Side by side

Key specifications

MeasureSingle Phase 5Smile G3 S5 / BAT-10.1P
ArchitectureAll-in-one energy systemAll-in-one energy system
Published usable capacity range9.6–57.6 kWh9.6–57.6 kWh
Scored benchmark9.6 kWh9.6 kWh
ChemistryLFPLFP
Power5.0 kW5 kW
Round-tripNot recordedNot recorded
Cycle lifeNot recordedNot recorded

Architecture

Single Phase 5
All-in-one energy system
Smile G3 S5 / BAT-10.1P
All-in-one energy system

Published usable capacity range

Single Phase 5
9.6–57.6 kWh
Smile G3 S5 / BAT-10.1P
9.6–57.6 kWh

Scored benchmark

Single Phase 5
9.6 kWh
Smile G3 S5 / BAT-10.1P
9.6 kWh

Chemistry

Single Phase 5
LFP
Smile G3 S5 / BAT-10.1P
LFP

Power

Single Phase 5
5.0 kW
Smile G3 S5 / BAT-10.1P
5 kW

Round-trip

Single Phase 5
Not recorded
Smile G3 S5 / BAT-10.1P
Not recorded

Cycle life

Single Phase 5
Not recorded
Smile G3 S5 / BAT-10.1P
Not recorded
Local evidence

Australia evidence

EvidenceSingle Phase 5Smile G3 S5 / BAT-10.1P
OutcomeAvailable in AustraliaAvailable in Australia
Checked2026-08-022026-08-29
CertificationsThe exact Australian system datasheet publishes AS/NZS 4777.2:2020, IEC/EN 62109-1/-2 and IEC 62619:2022., The 6 September 2026 CER approved-battery export, retrieved 7 September 2026, retains exact BW-BAT-10.1P and its II, III, IV, V and VI variants under manufacturer Suzhou Bytewatt Technology Co Ltd. Those rows carry an approved date of 7 March 2023 and an expiry date of 5 June 2026. That expiry date has passed and the export carries no renewed BW-BAT-10.1P row. These rows do not establish eligibility for a new installation of the exact battery after the expiry date. Cited source_version au-cer-battery-2026-09-06-c074023b3804., The 6 September 2026 CER approved-inverter export, retrieved the same day, lists the paired BW-INV-SPH5K (AS4777-2 2020) under the same manufacturer. That row carries an approved date of 22 May 2023 and an expiry date of 18 November 2026. The BW-BAT-9.6P and BW-BAT-4.8S rows in the battery export are separate identities and are not transferred. SMILE-BAT-10.1P and SMILE-G3-BAT-10.1P are listed to Alpha ESS Co Ltd, a different manufacturer, and are not transferred. Cited source_version au-cer-inverter-2026-09-06-733db02cccc8.The exact BAT-10.1P datasheet lists IEC 62619, IEC 63056, IEC 62040 and UN 38.3; the SMILE-G3-S5 AU system datasheet lists AS 4777.2 and IEC 62109.
Warranty scopeAustralia and New Zealand; the inverter and BW-BAT-10.1P receive 10-year product cover and a 70% retained-capacity endpoint. Standard solar self-consumption, time shifting and backup use carry unlimited-cycle coverage, subject to the published conditions.Australia; the 11 October 2024 warranty names SMILE-G3-S5 and BAT-10.1P with a ten-year term, 70% retained capacity and a 3.12 MWh/kWh throughput condition for eligible installations from 1 November 2024.
Warranty remedyOn-site or service-centre repair, or replacement at Bytewatt's option.Repair or replacement at AlphaESS's option.
Labour and reinstallationThe installer rebate is conditional and not full labour cover. Removal and reinstallation are not promised.Installer travel and on-site labour are excluded. Removal and reinstallation are not promised.
FreightReplacement dispatch and return conditions apply; full freight cover is not promised.Replacement-parts freight is covered for an accepted claim.
Transfer and registrationNo clear later-owner transfer process was found in the governing terms. Authorised installation, claim evidence and RMA conditions apply.The warranty is non-transferable except where the products remain installed in a building, in which case it transfers to a later purchaser of that building. Serial registration before a claim, and installation by an SAA-accredited installer with a valid Alpha Installer ID, are required.
Grid/network approval evidenceSingle-phase 230 V hybrid system with AS/NZS 4777.2:2020, 5 kW rated grid and backup output, and transfer below 10 ms.The exact AU system is a 5 kW, 230 V single-phase hybrid under AS 4777.2. Current project approval and installer eligibility remain installation-specific.
Local product pathwayNo separate local pathway recordedNo separate local pathway recorded
Buyer evidenceReady (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.
Safety noticeNo model-specific notice recordedNo model-specific notice recorded
Review noteThe scored reference is Bytewatt's blue-enclosure BW-INV-SPH5K and BW-BAT-10.1P system. It is separate from VoltX vBox and from NeoVolt's white-enclosure BW-BAT-9.6P platform. The two halves carry different Australian listing states in the 6 September 2026 exports. The approved-inverter export lists the paired BW-INV-SPH5K with an expiry date of 18 November 2026. The exact BW-BAT-10.1P row's expiry date of 5 June 2026 has passed and the approved-battery export carries no renewed row. The scored BW-BAT-10.1P is not a current Australian approved battery. The exact Australian system datasheet and AU/NZ warranty reviewed 1 August 2026 remain the cited evidence for this record. An expired approval row does not by itself establish a discontinuation or a legacy state for the exact system.AlphaESS's current 2026 Australian brochure lists SMILE-G3-S5/B5 with both BAT-10.1P and BAT-9.3S. The battery options coexist; neither is presented as the formal successor to the other.
Register: parts termNot in the structured registerNot in the structured register
Register: labour and serviceNot in the structured registerNot in the structured register
Register: transport and freightNot in the structured registerNot in the structured register
Register: registrationNot in the structured registerNot in the structured register
Register: transferabilityNot in the structured registerNot in the structured register
Register: explicit unknownsNot in the structured registerNot in the structured register
Latest reviewed Approval Watch eventNo exact-identity event in reviewed historyNo exact-identity event in reviewed history
SourcesSource 1Source 2Source 3Source 1Source 2Source 3Source 4Source 5Source 6

Outcome

Single Phase 5
Available in Australia
Smile G3 S5 / BAT-10.1P
Available in Australia

Checked

Single Phase 5
2026-08-02
Smile G3 S5 / BAT-10.1P
2026-08-29

Certifications

Single Phase 5
The exact Australian system datasheet publishes AS/NZS 4777.2:2020, IEC/EN 62109-1/-2 and IEC 62619:2022., The 6 September 2026 CER approved-battery export, retrieved 7 September 2026, retains exact BW-BAT-10.1P and its II, III, IV, V and VI variants under manufacturer Suzhou Bytewatt Technology Co Ltd. Those rows carry an approved date of 7 March 2023 and an expiry date of 5 June 2026. That expiry date has passed and the export carries no renewed BW-BAT-10.1P row. These rows do not establish eligibility for a new installation of the exact battery after the expiry date. Cited source_version au-cer-battery-2026-09-06-c074023b3804., The 6 September 2026 CER approved-inverter export, retrieved the same day, lists the paired BW-INV-SPH5K (AS4777-2 2020) under the same manufacturer. That row carries an approved date of 22 May 2023 and an expiry date of 18 November 2026. The BW-BAT-9.6P and BW-BAT-4.8S rows in the battery export are separate identities and are not transferred. SMILE-BAT-10.1P and SMILE-G3-BAT-10.1P are listed to Alpha ESS Co Ltd, a different manufacturer, and are not transferred. Cited source_version au-cer-inverter-2026-09-06-733db02cccc8.
Smile G3 S5 / BAT-10.1P
The exact BAT-10.1P datasheet lists IEC 62619, IEC 63056, IEC 62040 and UN 38.3; the SMILE-G3-S5 AU system datasheet lists AS 4777.2 and IEC 62109.

Warranty scope

Single Phase 5
Australia and New Zealand; the inverter and BW-BAT-10.1P receive 10-year product cover and a 70% retained-capacity endpoint. Standard solar self-consumption, time shifting and backup use carry unlimited-cycle coverage, subject to the published conditions.
Smile G3 S5 / BAT-10.1P
Australia; the 11 October 2024 warranty names SMILE-G3-S5 and BAT-10.1P with a ten-year term, 70% retained capacity and a 3.12 MWh/kWh throughput condition for eligible installations from 1 November 2024.

Warranty remedy

Single Phase 5
On-site or service-centre repair, or replacement at Bytewatt's option.
Smile G3 S5 / BAT-10.1P
Repair or replacement at AlphaESS's option.

Labour and reinstallation

Single Phase 5
The installer rebate is conditional and not full labour cover. Removal and reinstallation are not promised.
Smile G3 S5 / BAT-10.1P
Installer travel and on-site labour are excluded. Removal and reinstallation are not promised.

Freight

Single Phase 5
Replacement dispatch and return conditions apply; full freight cover is not promised.
Smile G3 S5 / BAT-10.1P
Replacement-parts freight is covered for an accepted claim.

Transfer and registration

Single Phase 5
No clear later-owner transfer process was found in the governing terms. Authorised installation, claim evidence and RMA conditions apply.
Smile G3 S5 / BAT-10.1P
The warranty is non-transferable except where the products remain installed in a building, in which case it transfers to a later purchaser of that building. Serial registration before a claim, and installation by an SAA-accredited installer with a valid Alpha Installer ID, are required.

Grid/network approval evidence

Single Phase 5
Single-phase 230 V hybrid system with AS/NZS 4777.2:2020, 5 kW rated grid and backup output, and transfer below 10 ms.
Smile G3 S5 / BAT-10.1P
The exact AU system is a 5 kW, 230 V single-phase hybrid under AS 4777.2. Current project approval and installer eligibility remain installation-specific.

Local product pathway

Single Phase 5
No separate local pathway recorded
Smile G3 S5 / BAT-10.1P
No separate local pathway recorded

Buyer evidence

Single Phase 5
Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.
Smile G3 S5 / BAT-10.1P
Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.

Safety notice

Single Phase 5
No model-specific notice recorded
Smile G3 S5 / BAT-10.1P
No model-specific notice recorded

Review note

Single Phase 5
The scored reference is Bytewatt's blue-enclosure BW-INV-SPH5K and BW-BAT-10.1P system. It is separate from VoltX vBox and from NeoVolt's white-enclosure BW-BAT-9.6P platform. The two halves carry different Australian listing states in the 6 September 2026 exports. The approved-inverter export lists the paired BW-INV-SPH5K with an expiry date of 18 November 2026. The exact BW-BAT-10.1P row's expiry date of 5 June 2026 has passed and the approved-battery export carries no renewed row. The scored BW-BAT-10.1P is not a current Australian approved battery. The exact Australian system datasheet and AU/NZ warranty reviewed 1 August 2026 remain the cited evidence for this record. An expired approval row does not by itself establish a discontinuation or a legacy state for the exact system.
Smile G3 S5 / BAT-10.1P
AlphaESS's current 2026 Australian brochure lists SMILE-G3-S5/B5 with both BAT-10.1P and BAT-9.3S. The battery options coexist; neither is presented as the formal successor to the other.

Register: parts term

Single Phase 5
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: labour and service

Single Phase 5
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: transport and freight

Single Phase 5
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: registration

Single Phase 5
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: transferability

Single Phase 5
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: explicit unknowns

Single Phase 5
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Latest reviewed Approval Watch event

Single Phase 5
No exact-identity event in reviewed history
Smile G3 S5 / BAT-10.1P
No exact-identity event in reviewed history

Sources

Australia purchase checks

Make the shortlist quote-ready

These checks sit beside the benchmark score. They are site, tariff and contract questions that no product score can settle.

  1. Lock the exact model and installation-date listing.

    Ask for every model number to appear on the quote and order. The Clean Energy Council product lists are live: STC creation requires listed products at installation, and network requirements may also depend on current approval.

  2. Obtain the site-specific connection settings.

    Have the retailer state the supply phase, inverter connection limit, export limit and any export-control cost. The local network connection agreement, not a generic datasheet, determines those settings. See the Australian Government's connection guidance.

  3. Test savings against the household, not a brochure.

    Ask which bills or interval data, tariff, feed-in rate, export limit and future loads support the savings and payback claim. Self-consumed electricity and tariff timing usually matter more than a headline feed-in rate. See the system sizing and battery savings guidance.

  4. Specify the operating outcome.

    Define the usable energy, output power, backed-up circuits and outage behaviour. Confirm whether VPP participation, an internet connection, or an additional controller changes the configuration, reserve level, warranty or support path.

  5. Name the party responsible after installation.

    Keep the retailer, installer, manufacturer warranty and escalation path in the contract. Australian Consumer Law guarantees apply separately from any manufacturer warranty; where one business supplied both product and installation, it is generally responsible for the remedy. See the ACCC guidance.

Decision snapshot

Where the comparison separates

OverallSmile G3 S5 / BAT-10.1P leads the global score by 4 points.
Strongest dimensionsSingle Phase 5: Capacity & Usability · Smile G3 S5 / BAT-10.1P: Capacity & Usability
Largest differenceSmile G3 S5 / BAT-10.1P has the largest pillar edge in Guarantee & Backbone (19 points).
Market evidenceSingle Phase 5: buyer ready · Smile G3 S5 / BAT-10.1P: buyer ready

A score lead is only meaningful inside this shared class or tier. Weigh it against the specification and evidence rows above before deciding.

Both products are scored in the Performance & Value class, on the same rubric weighting. Scores are not comparable across classes or tiers. Full methodology.