Side-by-side

Compare

Compare like with like. Aligned scores, specifications and local evidence within one scoring class or tier.

Market context

Australia purchasing view

Performance & Value

Three Phase 104.6–27.6 kWh

NeoVolt | BW-INV-TPH10K with two BW-BAT-4.8S modules; 10 kW three-phase hybrid and 9.2 kWh usable scored reference

LFPAll-in-oneThree-phase

64/ 100

Good

Strong evidence coverage · 100%

Evidence checked 2026-09-01

Available in Australia · checked 2026-08-02

Buyer evidence: Ready (100% direct coverage).

LFPHigh Power 10kW+5 kWh Modular
Full scorecard
Performance & Value

Smile G3 S5 / BAT-10.1P9.6–57.6 kWh

AlphaESS | SMILE-G3-S5 with one SMILE-G3-BAT-10.1P; 9.6 kWh usable reference, 1-6 modules

LFPAll-in-oneSingle-phase

67/ 100

Very good

Strong evidence coverage · 100%

Evidence checked 2026-09-01

Available in Australia · checked 2026-08-29

Buyer evidence: Ready (100% direct coverage).

LFPVPP-Ready
Full scorecard
Side by side

Score profile

MeasureThree Phase 10Smile G3 S5 / BAT-10.1P
Capacity & Usability84 / 10082 / 100
Power & Efficiency64 / 10062 / 100
Longevity (verified)64 / 10065 / 100
Safety & Chemistry78 / 10075 / 100
Guarantee & Backbone43 / 10062 / 100
Energy Ecosystem51 / 10058 / 100

Capacity & Usability

Three Phase 10
84 / 100
Smile G3 S5 / BAT-10.1P
82 / 100

Power & Efficiency

Three Phase 10
64 / 100
Smile G3 S5 / BAT-10.1P
62 / 100

Longevity (verified)

Three Phase 10
64 / 100
Smile G3 S5 / BAT-10.1P
65 / 100

Safety & Chemistry

Three Phase 10
78 / 100
Smile G3 S5 / BAT-10.1P
75 / 100

Guarantee & Backbone

Three Phase 10
43 / 100
Smile G3 S5 / BAT-10.1P
62 / 100

Energy Ecosystem

Three Phase 10
51 / 100
Smile G3 S5 / BAT-10.1P
58 / 100
Side by side

Key specifications

MeasureThree Phase 10Smile G3 S5 / BAT-10.1P
ArchitectureAll-in-one energy systemAll-in-one energy system
Published usable capacity range4.6–27.6 kWh9.6–57.6 kWh
Scored benchmark9.2 kWh9.6 kWh
ChemistryLFPLFP
Power10.0 kW5 kW
Round-tripNot recordedNot recorded
Cycle lifeNot recordedNot recorded

Architecture

Three Phase 10
All-in-one energy system
Smile G3 S5 / BAT-10.1P
All-in-one energy system

Published usable capacity range

Three Phase 10
4.6–27.6 kWh
Smile G3 S5 / BAT-10.1P
9.6–57.6 kWh

Scored benchmark

Three Phase 10
9.2 kWh
Smile G3 S5 / BAT-10.1P
9.6 kWh

Chemistry

Three Phase 10
LFP
Smile G3 S5 / BAT-10.1P
LFP

Power

Three Phase 10
10.0 kW
Smile G3 S5 / BAT-10.1P
5 kW

Round-trip

Three Phase 10
Not recorded
Smile G3 S5 / BAT-10.1P
Not recorded

Cycle life

Three Phase 10
Not recorded
Smile G3 S5 / BAT-10.1P
Not recorded
Local evidence

Australia evidence

EvidenceThree Phase 10Smile G3 S5 / BAT-10.1P
OutcomeAvailable in AustraliaAvailable in Australia
Checked2026-08-022026-08-29
CertificationsThe exact Australian system datasheet publishes AS/NZS 4777.2:2020, IEC/EN 62109-1/-2 and IEC 62619:2022.The exact BAT-10.1P datasheet lists IEC 62619, IEC 63056, IEC 62040 and UN 38.3; the SMILE-G3-S5 AU system datasheet lists AS 4777.2 and IEC 62109.
Warranty scopeAustralia and New Zealand; BW-INV-TPH10K and BW-BAT-4.8S receive 10-year product cover and a 70% retained-capacity endpoint. Standard solar self-consumption, time shifting and backup use carry unlimited-cycle coverage, subject to the published conditions.Australia; the 11 October 2024 warranty names SMILE-G3-S5 and BAT-10.1P with a ten-year term, 70% retained capacity and a 3.12 MWh/kWh throughput condition for eligible installations from 1 November 2024.
Warranty remedyOn-site or service-centre repair, or replacement at Bytewatt's option.Repair or replacement at AlphaESS's option.
Labour and reinstallationThe installer rebate is conditional and not full labour cover. Removal and reinstallation are not promised.Installer travel and on-site labour are excluded. Removal and reinstallation are not promised.
FreightReplacement dispatch and return conditions apply; full freight cover is not promised.Replacement-parts freight is covered for an accepted claim.
Transfer and registrationNo clear later-owner transfer process was found in the governing terms. Authorised installation, claim evidence and RMA conditions apply.The warranty is non-transferable except where the products remain installed in a building, in which case it transfers to a later purchaser of that building. Serial registration before a claim, and installation by an SAA-accredited installer with a valid Alpha Installer ID, are required.
Grid/network approval evidenceThree-phase 230/400 V hybrid system with AS/NZS 4777.2:2020, 10 kW rated grid and backup output, and transfer below 10 ms.The exact AU system is a 5 kW, 230 V single-phase hybrid under AS 4777.2. Current project approval and installer eligibility remain installation-specific.
Local product pathwayNo separate local pathway recordedNo separate local pathway recorded
Buyer evidenceReady (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.
Safety noticeNo model-specific notice recordedNo model-specific notice recorded
Review noteThe scored reference uses the 10 kW three-phase inverter with two matching 4.8 kWh modules. The published family supports one to six modules in series; the score does not reward the largest stack.AlphaESS's current 2026 Australian brochure lists SMILE-G3-S5/B5 with both BAT-10.1P and BAT-9.3S. The battery options coexist; neither is presented as the formal successor to the other.
Register: parts termNot in the structured registerNot in the structured register
Register: labour and serviceNot in the structured registerNot in the structured register
Register: transport and freightNot in the structured registerNot in the structured register
Register: registrationNot in the structured registerNot in the structured register
Register: transferabilityNot in the structured registerNot in the structured register
Register: explicit unknownsNot in the structured registerNot in the structured register
Latest reviewed Approval Watch eventNo exact-identity event in reviewed historyNo exact-identity event in reviewed history
SourcesSource 1Source 2Source 3Source 1Source 2Source 3Source 4Source 5Source 6

Outcome

Three Phase 10
Available in Australia
Smile G3 S5 / BAT-10.1P
Available in Australia

Checked

Three Phase 10
2026-08-02
Smile G3 S5 / BAT-10.1P
2026-08-29

Certifications

Three Phase 10
The exact Australian system datasheet publishes AS/NZS 4777.2:2020, IEC/EN 62109-1/-2 and IEC 62619:2022.
Smile G3 S5 / BAT-10.1P
The exact BAT-10.1P datasheet lists IEC 62619, IEC 63056, IEC 62040 and UN 38.3; the SMILE-G3-S5 AU system datasheet lists AS 4777.2 and IEC 62109.

Warranty scope

Three Phase 10
Australia and New Zealand; BW-INV-TPH10K and BW-BAT-4.8S receive 10-year product cover and a 70% retained-capacity endpoint. Standard solar self-consumption, time shifting and backup use carry unlimited-cycle coverage, subject to the published conditions.
Smile G3 S5 / BAT-10.1P
Australia; the 11 October 2024 warranty names SMILE-G3-S5 and BAT-10.1P with a ten-year term, 70% retained capacity and a 3.12 MWh/kWh throughput condition for eligible installations from 1 November 2024.

Warranty remedy

Three Phase 10
On-site or service-centre repair, or replacement at Bytewatt's option.
Smile G3 S5 / BAT-10.1P
Repair or replacement at AlphaESS's option.

Labour and reinstallation

Three Phase 10
The installer rebate is conditional and not full labour cover. Removal and reinstallation are not promised.
Smile G3 S5 / BAT-10.1P
Installer travel and on-site labour are excluded. Removal and reinstallation are not promised.

Freight

Three Phase 10
Replacement dispatch and return conditions apply; full freight cover is not promised.
Smile G3 S5 / BAT-10.1P
Replacement-parts freight is covered for an accepted claim.

Transfer and registration

Three Phase 10
No clear later-owner transfer process was found in the governing terms. Authorised installation, claim evidence and RMA conditions apply.
Smile G3 S5 / BAT-10.1P
The warranty is non-transferable except where the products remain installed in a building, in which case it transfers to a later purchaser of that building. Serial registration before a claim, and installation by an SAA-accredited installer with a valid Alpha Installer ID, are required.

Grid/network approval evidence

Three Phase 10
Three-phase 230/400 V hybrid system with AS/NZS 4777.2:2020, 10 kW rated grid and backup output, and transfer below 10 ms.
Smile G3 S5 / BAT-10.1P
The exact AU system is a 5 kW, 230 V single-phase hybrid under AS 4777.2. Current project approval and installer eligibility remain installation-specific.

Local product pathway

Three Phase 10
No separate local pathway recorded
Smile G3 S5 / BAT-10.1P
No separate local pathway recorded

Buyer evidence

Three Phase 10
Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.
Smile G3 S5 / BAT-10.1P
Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed.

Safety notice

Three Phase 10
No model-specific notice recorded
Smile G3 S5 / BAT-10.1P
No model-specific notice recorded

Review note

Three Phase 10
The scored reference uses the 10 kW three-phase inverter with two matching 4.8 kWh modules. The published family supports one to six modules in series; the score does not reward the largest stack.
Smile G3 S5 / BAT-10.1P
AlphaESS's current 2026 Australian brochure lists SMILE-G3-S5/B5 with both BAT-10.1P and BAT-9.3S. The battery options coexist; neither is presented as the formal successor to the other.

Register: parts term

Three Phase 10
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: labour and service

Three Phase 10
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: transport and freight

Three Phase 10
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: registration

Three Phase 10
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: transferability

Three Phase 10
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Register: explicit unknowns

Three Phase 10
Not in the structured register
Smile G3 S5 / BAT-10.1P
Not in the structured register

Latest reviewed Approval Watch event

Three Phase 10
No exact-identity event in reviewed history
Smile G3 S5 / BAT-10.1P
No exact-identity event in reviewed history

Sources

Australia purchase checks

Make the shortlist quote-ready

These checks sit beside the benchmark score. They are site, tariff and contract questions that no product score can settle.

  1. Lock the exact model and installation-date listing.

    Ask for every model number to appear on the quote and order. The Clean Energy Council product lists are live: STC creation requires listed products at installation, and network requirements may also depend on current approval.

  2. Obtain the site-specific connection settings.

    Have the retailer state the supply phase, inverter connection limit, export limit and any export-control cost. The local network connection agreement, not a generic datasheet, determines those settings. See the Australian Government's connection guidance.

  3. Test savings against the household, not a brochure.

    Ask which bills or interval data, tariff, feed-in rate, export limit and future loads support the savings and payback claim. Self-consumed electricity and tariff timing usually matter more than a headline feed-in rate. See the system sizing and battery savings guidance.

  4. Specify the operating outcome.

    Define the usable energy, output power, backed-up circuits and outage behaviour. Confirm whether VPP participation, an internet connection, or an additional controller changes the configuration, reserve level, warranty or support path.

  5. Name the party responsible after installation.

    Keep the retailer, installer, manufacturer warranty and escalation path in the contract. Australian Consumer Law guarantees apply separately from any manufacturer warranty; where one business supplied both product and installation, it is generally responsible for the remedy. See the ACCC guidance.

Decision snapshot

Where the comparison separates

OverallSmile G3 S5 / BAT-10.1P leads the global score by 3 points.
Strongest dimensionsThree Phase 10: Capacity & Usability · Smile G3 S5 / BAT-10.1P: Capacity & Usability
Largest differenceSmile G3 S5 / BAT-10.1P has the largest pillar edge in Guarantee & Backbone (19 points).
Market evidenceThree Phase 10: buyer ready · Smile G3 S5 / BAT-10.1P: buyer ready

A score lead is only meaningful inside this shared class or tier. Weigh it against the specification and evidence rows above before deciding.

Both products are scored in the Performance & Value class, on the same rubric weighting. Scores are not comparable across classes or tiers. Full methodology.