back to inverters

PLACEHOLDERNot a representation of the product
Inverter

Sunny Tripower 125

125 kW · String · Three-phase · 12 MPPTs

SMA

73/ 100

Very good

Global

AFCI IntegratedType I+II SPD

The verdict. In our Inverter class, SMA Sunny Tripower 125 leads on design & flexibility.

18thof 63 in InverterTop halfclass average 70.5
Compare this inverter →Ask Watt →
Thermal control requires a separate controller. The STP125-70 can support surplus-triggered heat-pump switching through optional SMA Data Manager M (EDMM-20), a compatible meter and SG Ready appliance. Configure thresholds and the grid feed-in reference. The documented X3 example also needs a utility blocking device and break-contact relay; it encourages operation rather than modulating compressor speed. EDMM-20 manual applies from firmware 2.06.34.R. Local installation and utility requirements must be established for the Indian project. Source 1.Source 2.Source 3.Source 4.Source 5.

The assessment

How it scores, by category

Efficiency76
Design & Flexibility95
Thermal & Physical Resilience74
Features & Integration55
Safety & Compliance95
Guarantee & Backbone62
Energy Ecosystem56

Market position

18thof 63 in InverterTop half
567382

Our reading

Sunny Tripower 125 scores 73, placing 18 of 63 in the Inverter class against a class average of 70.5. Its strongest scoring dimension is design & flexibility (95), running 14.3 points above the class average on this dimension. Features & Integration scores 55, the lowest pillar for this product. The class average on features & integration is 72. Key specifications: 98.4% peak efficiency, 12 MPPT inputs, 5-year warranty.

The data

Power
125.0kW
Type
String
Peak eff
98.4%
MPPTs
12
Technology architecture

Solar-only string inverter

Architecture guide

Converts PV string DC into grid-connected AC.

Product role
No native battery conversion path is recorded for the product.
Published range
125 kW
Phase
Three phase
Backup boundary
No native backup recorded
Architecture describes the product boundary. It is not a system design or an equipment-pairing decision.

Warranty coverage: 5-year term

Coverage includes

✓Parts
–Labour
–Extendable
Market typical5yr0yr5yr10yr15yr20yr25yr

Parts only · term longer than 0 of 95 scored inverters

No inverter in the fleet publishes a year-by-year performance or output guarantee the way panels and batteries do - this shows the covered term against the market-typical term and where every scored inverter’s term lands (grey dots, sized by model count), plus what the warranty actually includes.

Before you buy
Local positionUse a market view to check local availability, approvals and warranty scope.
Ask the installerWill the exact Sunny Tripower 125 model satisfy the site phase, array, MPPT, export-control and local grid requirements?

Verification & sources

Market context

Global evidencechange in the site menu

Global benchmark. This scorecard is benchmarked globally. A global score does not imply local availability, certification, warranty coverage, or installer compatibility.

Benchmark anchor. The score uses the highest exact current output established for the retained market scope. Scored model: STP125-70 · checked 2026-09-02. Evidence.

Sources & references · checked 2026-09-02

Strong evidence coverage

26 of 26 scored criteria link directly to a published source.

Values marked estimated, derived, or not found remain visible on the audit sheet and do not carry the same evidential weight as a linked source. Coverage measures direct links, not an independent guarantee that a claim is correct.

Record revision. SMA STP125-70-DS-en-13 (last revised 12/2025) and SMA India Sunny Tripower 125 page. Exact native operating-boundary review2026-10-04: STPxxx-70-BE-en-14 Version1.4,PDF10/84/113 and current exact HTML manual; values,market evidence andverification dates unchanged. Thermal-control review6October2026: exact commercial System Manager matrix and EDMM-20/ennexOS SG Ready manuals support conditional accessory relay switching; full record verification and regional dates unchanged.

Help strengthen this record

These are published evidence gaps, not private submissions. A source is reviewed under the same methodology whether it comes from a reader, installer or manufacturer.

View the open evidence register
Change ledger

Product record history

9 changes to this record · 1 product changed in this update
  1. Record updated

    Thermal load management

    Before
    No thermal load integration
    After
    Smart relay switching (excess solar triggered)
    Thermal load managementThermal load management+4 in JSON record
  2. Evidence added

    Summary

    Before
    Not previously recorded
    After
    The STP125-70 can support surplus-triggered heat-pump switching through optional SMA Data Manager M (EDMM-20), a compatible meter and SG Ready appliance. Configure thresholds and the grid feed-in reference. The documented X3 example also needs a utility blocking device and break-contact relay; it encourages operation rather than modulating compressor speed. EDMM-20 manual applies from firmware2.06.34.R. Local installation and utility requirements must be established for the Indian project.
    Primary datasheet
  3. Record updated

    Global score

    Before
    72.6
    After
    73.2
    Primary datasheet
  4. Record updated

    Energy Ecosystem pillar score

    Before
    50.5
    After
    55.9
    Primary datasheet
  5. Record updated

    Thermal load management: Evidence status

    Before
    reviewed_absence
    After
    sourced
    Thermal load managementThermal load management+4 in JSON record
  6. Record updated

    Thermal load management: Evidence sources

    Before
    https://files.sma.de/downloads/STP125-70-DS-en-13.pdf
    After
    https://manuals.sma.de/Business-Systeme-PL/en-US/14317593355.html; https://manuals.sma.de/Business-Systeme-PL/en-US/16052658827.html; https://manuals.sma.de/EDMM-20/en-US/13452038027.html; https://manuals.sma.de/EDMM-20/en-US/15910932491.html; https://manuals.sma.de/ennexOS/en-US/15910941195.html
    Thermal load managementThermal load management+4 in JSON record
  7. Evidence added

    Evidence sources

    Before
    Not previously recorded
    After
    https://manuals.sma.de/Business-Systeme-PL/en-US/14317593355.html; https://manuals.sma.de/Business-Systeme-PL/en-US/16052658827.html; https://manuals.sma.de/EDMM-20/en-US/13452038027.html; https://manuals.sma.de/EDMM-20/en-US/15910932491.html; https://manuals.sma.de/ennexOS/en-US/15910941195.html
    Primary datasheet
  8. Evidence added

    Title

    Before
    Not previously recorded
    After
    Thermal control requires a separate controller
    Primary datasheet
  9. Record updated

    Source revision

    Current text
    SMA STP125-70-DS-en-13 (last revised 12/2025) and SMA India Sunny Tripower 125 page. Exact native operating-boundary review2026-10-04: STPxxx-70-BE-en-14 Version1.4,PDF10/84/113 and current exact HTML manual; values,market evidence andverification dates unchanged. Thermal-control review6October2026: exact commercial System Manager matrix and EDMM-20/ennexOS SG Ready manuals support conditional accessory relay switching; full record verification and regional dates unchanged.

    The previous text is not reproduced here: both versions run to a full research paragraph. Both are in the JSON record linked below.

    Primary datasheet
5 changes to this record · 1 product changed in this update
  1. Record updated

    Backup / islanding: Evidence status

    Before
    reviewed_absence
    After
    derived
    Hybrid / battery capabilityBackup / islanding+3 in JSON record
  2. Record updated

    Hybrid / battery capability: Evidence status

    Before
    reviewed_absence
    After
    derived
    Hybrid / battery capabilityHybrid / battery capability+3 in JSON record
  3. Record updated

    Backup / islanding: Evidence sources

    Before
    https://files.sma.de/downloads/STP125-70-DS-en-13.pdf
    After
    https://files.sma.de/downloads/STPxxx-70-BE-en-14.pdf; https://manuals.sma.de/STPxxx70/en-US/10970774411.html; https://manuals.sma.de/STPxxx70/en-US/13294176139.html; https://manuals.sma.de/STPxxx70/en-US/13305293195.html
    Hybrid / battery capabilityBackup / islanding+3 in JSON record
  4. Record updated

    Hybrid / battery capability: Evidence sources

    Before
    https://files.sma.de/downloads/STP125-70-DS-en-13.pdf
    After
    https://files.sma.de/downloads/STPxxx-70-BE-en-14.pdf; https://manuals.sma.de/STPxxx70/en-US/13294176139.html; https://manuals.sma.de/STPxxx70/en-US/13305293195.html; https://manuals.sma.de/STPxxx70/en-US/15166989579.html
    Hybrid / battery capabilityHybrid / battery capability+3 in JSON record
  5. Record updated

    Source revision

    Before
    SMA STP125-70-DS-en-13 (last revised 12/2025) and SMA India Sunny Tripower 125 page.
    After
    SMA STP125-70-DS-en-13 (last revised 12/2025) and SMA India Sunny Tripower 125 page. Exact native operating-boundary review2026-10-04: STPxxx-70-BE-en-14 Version1.4,PDF10/84/113 and current exact HTML manual; values,market evidence andverification dates unchanged.
    Primary datasheet
1 change to this record · 2 products changed in this update
  1. Record added

    Product record

    kind: inverter; brand: SMA; name: Sunny Tripower 125; model: Current India-listed Sunny Tripower 125; order codes STP125-70 and STP 125-70; scored model STP125-70; score: 72.6

    Primary datasheet

This is review.solar's publication history. It does not claim the product changed on the recorded date, and it excludes compatibility, system pairing, installation suitability and relative leaderboard prose. Open the complete JSON record.

Evidence timeline

Recorded verification events for this scorecard. These are evidence checks, not historical score snapshots.

  1. Core scorecard evidence checked
  2. IN market evidence checked
  3. Series benchmark evidence checked

Evidence record (JSON)

Scored by Solar Analytica Research

Stay across the benchmark.

New scorecards, score changes and market signals, published as they happen.