| Outcome | Available in Germany | Available in Germany |
|---|
| Checked | 2026-08-27 | 2026-08-27 |
|---|
| Certifications | IEC 62619:2022, CE, VDE 2510-50, IEC 62477-1 and UN 38.3 are listed for Reserva. | Anker's X1 certification notice publishes IEC 62477, IEC 62109, IEC 62040, IEC 62619, ISO 13849 and VDE 4105 for the X1 system. The official single-phase service page separately names X1-H5K-S and X1-H6K-S; the notice does not expose a certificate number for each exact power module. |
|---|
| Warranty scope | Germany; ten years, 80% retained capacity and model-specific throughput ceilings, with Warranty Plus labour and national standard freight. | Germany; Anker publishes ten years for the exact X1-H single-phase power modules and X1-B5-H battery module. The battery module is stated to retain at least 80 percent after ten years, subject to 13.17 MWh throughput or 6,000 cycles, whichever limit is reached first. |
|---|
| Warranty remedy | Fronius may repair, replace with an equivalent or newer equivalent, or provide prorated credit. | Anker may repair, replace with a functionally equivalent new or refurbished part, or refund only in the limited circumstances stated by the policy. |
|---|
| Labour and reinstallation | Directly related removal and replacement labour is covered when performed by Fronius or its commissioned installer. Approved direct removal and replacement labour is covered; unrelated system work is excluded. | Dismantling, installation and troubleshooting costs are excluded. Dismantling, reinstallation and relocation costs are excluded. |
|---|
| Freight | National standard freight is covered; express freight, duties and travel are excluded. | Anker controls the RMA route and returns the repaired or replacement product within the country of purchase. |
|---|
| Transfer and registration | Remaining coverage transfers with ownership without restarting the term. No registration or persistent-connectivity prerequisite appears; authorised sale and qualified commissioning are required. | The warranty is restricted to the country of purchase; an automatic later-owner transfer right was not established. Proof of purchase, serial number and defect details are required; authorised-channel conditions apply. |
|---|
| Grid/network approval evidence | Reserva's IEC 62619, VDE 2510-50 and IEC 62477-1 evidence is battery-safety evidence, not standalone German grid approval. Final grid conformity is installation-specific; no product pairing is asserted. | Current German single-phase hybrid X1 family. Connection settings, accessory selection and final electrical design remain installer responsibilities. |
|---|
| Local product pathway | No separate local pathway recorded | No separate local pathway recorded |
|---|
| Buyer evidence | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. | Ready (100% direct coverage): Local availability, buyer evidence, and the publication threshold are confirmed. |
|---|
| Safety notice | No model-specific notice recorded | No model-specific notice recorded |
|---|
| Review note | Current German exact-family support is established. Battery safety credentials do not create a standalone grid-interconnection claim. | Anker's German product and warranty surfaces name X1-H5K-S and X1-H6K-S with the shared X1-B5-H module. The Australian X1-B10-HC configuration code is not presented as a German certification identity. |
|---|
| Sources | Source 1Source 2Source 3 | Source 1Source 2Source 3Source 4 |
|---|