back to inverters

Inverter

SigenStor EC TP

5–12 kW · Hybrid · Three-phase · 3 MPPTs · Whole-home backup

SigenergyReleased 2025

76/ 100

Superior

Global

IP66 RatedWhole-Home Backup

The verdict. In our Inverter class, Sigenergy SigenStor EC TP leads on features & integration.

7thof 63 in InverterTop 10%class average 70.5
Compare this inverter →Ask Watt →

The assessment

How it scores, by category

Efficiency71
Design & Flexibility82
Thermal & Physical Resilience81
Features & Integration90
Safety & Compliance70
Guarantee & Backbone67
Energy Ecosystem72

Market position

7thof 63 in InverterTop 10%
567682

Our reading

SigenStor EC TP scores 76, placing 7 of 63 in the Inverter class against a class average of 70.5. Its strongest scoring dimension is features & integration (90), running 17.6 points above the class average on this dimension. Key specifications: 98.3% peak efficiency, 3 MPPT inputs, 10-year warranty.

The data

Power
12.0kW
Type
Hybrid
Peak eff
98.3%
MPPTs
3
Technology architecture

Hybrid inverter

Architecture guide

Manages PV, battery DC and household AC through the inverter platform.

Product role
The battery remains a separate product even when it belongs to the same branded platform.
Published range
5–12 kW
Phase
Three phase
Backup boundary
Whole-home capability recorded
Architecture describes the product boundary. It is not a system design or an equipment-pairing decision.
Decision evidence

What the documents establish

Published evidence, source-reviewed non-disclosure and unresolved questions remain separate from the product score.

Warranty coverage: 10-year term

Coverage includes

✓Parts
✓Labour
–Extendable
Market typical10yr0yr5yr10yr15yr20yr25yr

Parts & labour · term longer than 24 of 95 scored inverters

No inverter in the fleet publishes a year-by-year performance or output guarantee the way panels and batteries do - this shows the covered term against the market-typical term and where every scored inverter’s term lands (grey dots, sized by model count), plus what the warranty actually includes.

Before you buy
Local positionUse a market view to check local availability, approvals and warranty scope.
Ask the installerWill the exact SigenStor EC TP model satisfy the site phase, array, MPPT, export-control and local grid requirements?

Verification & sources

Market context

Global evidencechange in the site menu

Global benchmark. This scorecard is benchmarked globally. A global score does not imply local availability, certification, warranty coverage, or installer compatibility.

Benchmark anchor. The score is anchored to the 12 kW maximum of the defined residential Australian subset; the 15-30 kW models remain a separate commercial research family. Scored model: SigenStor EC 12.0 TP AU · checked 2026-08-02. Evidence.

Sources & references · checked 2026-08-31

Strong evidence coverage

24 of 24 scored criteria link directly to a published source.

Values marked estimated, derived, or not found remain visible on the audit sheet and do not carry the same evidential weight as a linked source. Coverage measures direct links, not an independent guarantee that a claim is correct.

How far the evidence reaches

2 of 5 questions with rows in the rings reach beyond manufacturer claim; none is measured by review.solar.123456
  1. OutputManufacturer claim3 rows in the rings
  2. EnduranceCertified or regulator-listed1 of 2 rows in the rings beyond claim2 design facts beside the rings
  3. SafetyCertified or regulator-listed1 of 2 rows in the rings beyond claim
  4. BackingManufacturer claim2 rows in the rings2 warranty terms beside the rings
  5. FitManufacturer claim2 rows in the rings9 design facts beside the rings
  6. FootprintNot assessed for inverters

Rings, outside in: manufacturer claim, certified or regulator-listed, third-party source. The centre is review.solar's own measurement, empty for every product today. Warranty terms and design facts that rest on the maker's own word are counted beside the rings; a reviewed absence, or one that reaches beyond the maker's claim, stays in them. How the evidence puzzle works

Record revision. Australian three-phase controller datasheet, CEC listing and AU/NZ product warranty dated 2024-12-06 reviewed 2026-08-02; AU hybrid inverter decision sprint II checked 2026-08-06. First-market DE overlay review 2026-08-31: official German catalogues recorded for the remaining 17 AU+US identities; Australian and United States overlays and scores unchanged.

Help strengthen this record

These are published evidence gaps, not private submissions. A source is reviewed under the same methodology whether it comes from a reader, installer or manufacturer.

View the open evidence register
Change ledger

Product record history

One earlier entry recorded a source recheck rather than a change to the published figure, and is not listed here. Every entry remains in the evidence record.

3 changes to this record · 6 products changed in this update
  1. Record updated

    AU Evidence sources

    Before
    https://cer.gov.au/document/cec-approved-inverters; https://cleanenergycouncil.org.au/industry-programs/products-program/inverters; https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf; https://www.sigenergy.com/uploads/au_download/1743479846801908.pdf; https://www.sigenergy.com/uploads/au_download/1750303856783384.pdf; https://www.sigenergy.com/uploads/au_download/1762776304777117.pdf; https://www.sigenergy.com/uploads/au_download/1779800849121879.pdf
    After
    https://cer.gov.au/document/cec-approved-inverters; https://cleanenergycouncil.org.au/industry-programs/products-program/inverters; https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf; https://www.sigenergy.com/uploads/au_download/1743479846801908.pdf; https://www.sigenergy.com/uploads/au_download/1750303856783384.pdf; https://www.sigenergy.com/uploads/au_download/1762776304777117.pdf; https://www.sigenergy.com/uploads/au_download/1779800849121879.pdf; https://wwwstatic.sigenergy.com/upload/2026-10-08/1791440522355_0a3f039a-9cb6-4fa9-80b9-11fb9754b7e9.pdf
    AU market evidencePeak efficiency (%)+6 in JSON record
  2. Record updated

    Backup / islanding: Evidence sources

    Before
    https://www.sigenergy.com/au/products/sigenmicro-inverter; https://www.sigenergy.com/au/support/files/768; https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf
    After
    https://www.sigenergy.com/au/support/files/768; https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf; https://www.sigenergy.com/uploads/au_download/1749029535574049.pdf
    Backup / islandingBackup / islanding+2 in JSON record
  3. Record updated

    AU Warranty scope

    Current text
    Australia and New Zealand; each of the three Australian warranty revisions read on 7 October 2026 gives the Sigen Energy Controller component ten years. The Factory Limited Warranty for Sigenergy Product (header date 12/6/2024) lists the 12.0 TP AU in its model list, printed as 'SigeStor 12.0 TP AU', among other typographical inconsistencies. The later Factory Limited Warranty for SigenStor revisions (header dates 10/6/2025 and 26 May 2026, the current one) do not name the 12.0 TP AU. Their three-phase Energy Controller entries are SigenStor EC 5.0, 10.0, 15.0, 20.0, 25.0 and 30.0 TP AU, and the current revision also lists an EC 8.0 TP AU against the single-phase 8S system code. The Factory Limited Warranty for Inverter System (header date 24 July 2026), read on 9 October 2026, gives ten years for Sigen Hybrid 5.0, 10.0, 15.0, 20.0, 25.0 and 30.0 TP AU. Its covered-product table does not name 12.0 TP AU under the TP AU entry, and it names Sigen Hybrid models rather than SigenStor EC 12.0 TP AU, so it is not treated as a warranty for this model.

    The previous text is not reproduced here: both versions run to a full research paragraph. Both are in the JSON record linked below.

    AU market evidencePeak efficiency (%)+6 in JSON record
10 changes to this record · 5 products changed in this update
  1. Record updated

    DE Warranty scope

    Before
    Germany; no German warranty PDF naming SigenStor EC TP was isolated, so six-field terms are not attached. Held is not unavailable. The PSW-era Sigenergy inverter file is not edited.
    After
    Germany; the German SigenStor limited warranty (page header date 29 August 2025) lists SigenStor EC 5.0, 6.0, 8.0, 10.0, 12.0, 15.0, 17.0, 20.0, 25.0 and 30.0 TP at 10 years for components installed in Germany and commissioned on or after 1 June 2023. The document names the product without the AU suffix, and the TP AU suffix is not claimed as a German SKU. The PSW-era Sigenergy inverter file is not edited.
    DE market evidenceDE market evidence+2 in JSON record
  2. Evidence removed

    DE Warranty confirmation

    Before
    unconfirmed
    After
    No longer recorded
    DE market evidenceDE market evidence+2 in JSON record
  3. Record updated

    US Support Note

    Current text
    Sigenergy ships no three-phase energy controller in North America, so this record has no United States counterpart part. The United States Energy Controller datasheet (version 20260717) covers SigenStor EC SP US only and states in terms that the unit is not a three-phase inverter. No TP code appears in the North American SigenStor Home warranty (page header date 10/13/2025), whose covered-product table lists SigenStor EC SP US and SigenMicro as its inverter hardware, and no TP code is on the California Energy Commission grid-support inverter lists (data unchanged since 1 October 2026). The North American warranty is given by Sigenergy Technology Co., Ltd. and its affiliates. The United States contact page lists sales.us@sigenergy.com and service.us@sigenergy.com, +1 715 519 9996, and a street address at 2377 Gold Meadow Way, Gold River, CA 95670.

    The previous text is not reproduced here: both versions run to a full research paragraph. Both are in the JSON record linked below.

    US market evidenceUS market evidence+3 in JSON record
  4. Record updated

    US Evidence sources

    Before
    https://solarequipment.energy.ca.gov/Home/PropertyDetails/InverterSolarList; https://www.sigenergy.com/uploads/us_download/1760409029456911.pdf; https://www.sigenergy.com/us/products/sigenstor; https://www.sigenergy.com/us/support/files/2016
    After
    https://solarequipment.energy.ca.gov/Home/PropertyDetails/InverterSolarList; https://www.sigenergy.com/uploads/us_download/1760409029456911.pdf; https://www.sigenergy.com/us/contact; https://www.sigenergy.com/us/products/sigenstor; https://www.sigenergy.com/us/support/files/2016
    US market evidenceUS market evidence+3 in JSON record
  5. Record updated

    AU Support Note

    Current text
    The 12.0 TP AU is the scored benchmark for this 5-12 kW family. The current Sigenergy Australia Energy Controller datasheet (version 20251107) lists three-phase models 5.0, 10.0, 15.0, 20.0, 25.0 and 30.0 TP and does not list 12.0 TP, while the CER approved-inverter list (data as at 30 September 2026) still lists SigenStor EC 12.0 TP AU with an expiry of 7 April 2028. The specifications on this record come from an earlier datasheet revision for the 12.0 TP AU column. CEC listings are dynamic. Verify current approval, network export settings, compatible battery stack, gateway configuration and warranty coverage immediately before installation.

    The previous text is not reproduced here: both versions run to a full research paragraph. Both are in the JSON record linked below.

    AU market evidencePeak efficiency (%)+5 in JSON record
  6. Record updated

    AU Evidence sources

    Before
    https://cer.gov.au/document/cec-approved-inverters; https://cleanenergycouncil.org.au/industry-programs/products-program/inverters; https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf; https://www.sigenergy.com/uploads/au_download/1743479846801908.pdf
    After
    https://cer.gov.au/document/cec-approved-inverters; https://cleanenergycouncil.org.au/industry-programs/products-program/inverters; https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf; https://www.sigenergy.com/uploads/au_download/1743479846801908.pdf; https://www.sigenergy.com/uploads/au_download/1750303856783384.pdf; https://www.sigenergy.com/uploads/au_download/1762776304777117.pdf; https://www.sigenergy.com/uploads/au_download/1779800849121879.pdf
    AU market evidencePeak efficiency (%)+5 in JSON record
  7. Record updated

    DE Evidence sources

    Before
    https://www.sigenergy.com/de/products/sigenstor; https://www.sigenergy.com/de/psipt/2065304798093234177
    After
    https://www.sigenergy.com/de/products/sigenstor; https://www.sigenergy.com/de/psipt/2065304798093234177; https://www.sigenergy.com/de/support/warranty; https://wwwstatic.sigenergy.com/content/assets/uploads/de_download/1775627259538011.pdf
    DE market evidenceDE market evidence+2 in JSON record
  8. Record updated

    AU Warranty scope

    Current text
    Australia and New Zealand; each of the three Australian warranty revisions read on 7 October 2026 gives the Sigen Energy Controller component ten years. The Factory Limited Warranty for Sigenergy Product (header date 12/6/2024) lists the 12.0 TP AU in its model list, printed as 'SigeStor 12.0 TP AU', among other typographical inconsistencies. The later Factory Limited Warranty for SigenStor revisions (header dates 10/6/2025 and 26 May 2026, the current one) do not name the 12.0 TP AU. Their three-phase Energy Controller entries are SigenStor EC 5.0, 10.0, 15.0, 20.0, 25.0 and 30.0 TP AU, and the current revision also lists an EC 8.0 TP AU against the single-phase 8S system code.

    The previous text is not reproduced here: both versions run to a full research paragraph. Both are in the JSON record linked below.

    AU market evidencePeak efficiency (%)+5 in JSON record
  9. Evidence added

    DE Warranty conditions

    Before
    Not previously recorded
    After
    labour: Labour for on-site repairs and for dismantling and reinstalling spare parts or products is covered (SigenStor Garantie, Garantieumfang item (ii), page 4). Travel and accommodation costs for on-site service are not covered without a written commitment from Sigenergy (page 4).; registration: The 10-year period starts on the earlier of the date the product is installed and activated on site, or the 180th calendar day after shipment from Sigenergy's designated factory if it has not been installed, activated and registered by then (SigenStor Garantie, page 1). Keeping the 10-year term depends on the device staying connected to the internet for firmware updates, and interruptions totalling more than one year reduce it to 5 years from the original activation date (page 3, condition (viii)).; remedy: At its own discretion Sigenergy either fixes the fault by changing configuration or updating software, or exchanges the inverter, battery or charging system for a new or refurbished system that is at least functionally equivalent, or for an upgraded model (SigenStor Garantie, Garantieleistungen items (i) and (ii), page 4). A repaired or replaced part is warranted for the rest of the original period or 6 months from the repair or replacement, whichever is longer.; removal reinstallation: Dismantling and reinstallation of spare parts or products on site is included in the covered labour costs (SigenStor Garantie, Garantieumfang item (ii), page 4), unless a separate agreement between Sigenergy and the customer says otherwise. Disassembly, repair or part replacement by persons not authorised by Sigenergy is excluded (Allgemeine Ausschluesse item (iv), page 5).; transferability: The warranty can be transferred from the original owner to the next owner only if the device is still installed at its original location (SigenStor Garantie, Garantieleistungen, final sentence, page 4).; transport: Normal ground transport and customs duties for replaced spare parts, and the cost of returning the allegedly defective unit, are covered (SigenStor Garantie, Garantieumfang item (iii), page 4). Damage caused during transport is excluded (Allgemeine Ausschluesse item (viii), page 5).
    DE market evidenceDE market evidence+2 in JSON record
  10. Record updated

    AU Warranty conditions

    Current text
    labour: Onsite repair, removal and reinstallation labour are covered.; registration: The 12/6/2024 revision, which lists the 12.0 TP AU, starts the term on the earlier of installation, activation and registration on site, or the date of the retailer's invoice or a written document showing delivery to the installation site, and at 6 months after manufacture if neither can be established. The current revision (header date 26 May 2026), which does not name the 12.0 TP AU, uses the earlier of installation, activation and registration on site, or the 180th calendar day after shipment from Sigenergy's designated factory.; remedy: Configuration repair, software update, parts repair or functionally equivalent replacement at Sigenergy discretion.; removal reinstallation: Covered as onsite labour, subject to the validated claim process.; transferability: Transfer is permitted at the original installation site.; transport: Normal ground freight, customs duties and return freight are covered.

    The previous text is not reproduced here: both versions run to a full research paragraph. Both are in the JSON record linked below.

    AU market evidencePeak efficiency (%)+5 in JSON record
1 change to this record · 32 products changed in this update
  1. Evidence added

    DE Warranty confirmation

    Before
    Not previously recorded
    After
    unconfirmed
    DE market evidenceDE market evidence
7 changes to this record · 61 products changed in this update
  1. Evidence added

    DE Warranty scope

    Before
    Not previously recorded
    After
    Germany; no German warranty PDF naming SigenStor EC TP was isolated, so six-field terms are not attached. Held is not unavailable. The PSW-era Sigenergy inverter file is not edited.
    DE market evidenceDE market evidence
  2. Evidence added

    DE Grid and installation context

    Before
    Not previously recorded
    After
    Sigenergy Germany lists SigenStor EC 5.0 TP through 12.0 TP. Grid codes are not copied from the single-phase EC SP family. The scored TP AU suffix is not claimed as a German SKU. Site approval remains installation-specific.
    DE market evidenceDE market evidence
  3. Record updated

    Source revision

    Before
    Australian three-phase controller datasheet, CEC listing and AU/NZ product warranty dated 2024-12-06 reviewed 2026-08-02; AU hybrid inverter decision sprint II checked 2026-08-06
    After
    Australian three-phase controller datasheet, CEC listing and AU/NZ product warranty dated 2024-12-06 reviewed 2026-08-02; AU hybrid inverter decision sprint II checked 2026-08-06. First-market DE overlay review 2026-08-31: official German catalogues recorded for the remaining 17 AU+US identities; Australian and United States overlays and scores unchanged.
    Primary datasheet
  4. Evidence added

    DE Certifications

    Before
    Not previously recorded
    After
    Sigenergy's German SigenStor page and support table name EC 5.0 TP through EC 12.0 TP.
    DE market evidenceDE market evidence
  5. Evidence added

    DE Evidence sources

    Before
    Not previously recorded
    After
    https://www.sigenergy.com/de/products/sigenstor; https://www.sigenergy.com/de/psipt/2065304798093234177
    DE market evidenceDE market evidence
  6. Evidence added

    DE Status

    Before
    Not previously recorded
    After
    available
    DE market evidenceDE market evidence
  7. Evidence added

    DE Support Note

    Before
    Not previously recorded
    After
    This record is not data/inverters/sigenergy.json. The single-phase EC SP family is a separate battery-side identity and is not merged onto this three-phase TP inverter record. Manufacturer listing is established; distributor inventory is not inferred.
    DE market evidenceDE market evidence
1 change to this record · 6 products changed in this update
  1. Record updated

    Manufacturing track record: Evidence sources

    Before
    https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf; https://www.sigenergy.com/uploads/en_content/sigenergy_sustainability_report_en_2024.pdf
    After
    https://www.gurufocus.com/news/8797289/3-years-and-11-months-aiallinone-pv-storage-sigenergy-listed-on-hkex-fastest-ipo-record-for-a-chinese-enterprise
    Manufacturing track record+2 in JSON record
3 changes to this record · 1 product changed in this update
  1. Record updated

    Global score

    Before
    75.5
    After
    76.4
    Primary datasheet
  2. Record updated

    Guarantee & Backbone pillar score

    Before
    60.8
    After
    67
    Primary datasheet
  3. Record updated

    Manufacturing track record

    Before
    1-4 years, scaling
    After
    4-10 years (or new brand, strong parent heritage)
    Financial strength & warranty backingsupersededPrimary datasheet
4 changes to this record · 73 products changed in this update
  1. Evidence added

    Confidence

    Before
    Not previously recorded
    After
    high
    Backup devicePrimary datasheet+6 in JSON record
  2. Evidence added

    State

    Before
    Not previously recorded
    After
    supported
    Backup devicePrimary datasheet+6 in JSON record
  3. Evidence added

    Evidence sources

    Before
    Not previously recorded
    After
    https://www.sigenergy.com/uploads/au_download/1743479387163404.pdf
    Primary datasheet+7 in JSON record
  4. Evidence added

    Value

    Before
    Not previously recorded
    After
    Direct-pv hybrid inverter with 3 independent MPPTs at the scored model boundary.
    Backup devicePrimary datasheet+6 in JSON record

This is review.solar's publication history. It does not claim the product changed on the recorded date, and it excludes compatibility, system pairing, installation suitability and relative leaderboard prose. Open the complete JSON record.

Evidence timeline

Recorded verification events for this scorecard. These are evidence checks, not historical score snapshots.

  1. US market evidence checked
  2. Core scorecard evidence checked
  3. DE market evidence checked
  4. Australian certification source identity verified
  5. AU market evidence checked
  6. Plain-language warranty summary checked
  7. Series benchmark evidence checked

Evidence record (JSON)

Scored by Solar Analytica Research

Further reading from Findings

Stay across the benchmark.

New scorecards, score changes and market signals, published as they happen.